An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Gamma-ray Large Area Space Telescope GLAST Large Area Telescope LAT Instrument Science Operations Center Rob Cameron Stanford Linear Accelerator Center rac@slac.stanford.edu 650-926-2989

  2. LAT ISOC in the GLAST GDS Analysis Software

  3. LAT ISOC Objectives • The LAT ISOC is organized to: • Safely operate the instrument • Produce the LAT science data products • Functions: • Mission planning and command generation • Health and safety monitoring • Maintain and modify flight software and testbed • LAT performance verification and optimization • Process and archive Level 1 and Level 2 data • Support science analysis software • Data and software management

  4. ISOC Organization

  5. ISOC Teams • CHS • “Front-end” instrument operations • FSW • Joins ISOC after FSQ (Mid 2005) • PVO • Follows from SVAC in I&T • Science Products • Runs pipeline, generates Level 1 (and some L2) products • SAS • Software tools to support science analysis • ISOC will work with various LAT project elements during pre-launch activities, to ensure smooth transition into ops phase • ISOC will coordinate activities with Science Working Groups, overseen by LAT Steering Committee

  6. Software Architecture: Primary Data Flows LAT ISOC Level 1&2 Sci Data Products Level 1&2 Sci Data Products, LAT Timeline Level 0 Sci Data Receive & Archive Science Data Analysis Pipeline Archive & Send MOC GSSC Level 0 Data, LAT Alerts, Integrated Observ. Timeline, Spacecraft Timeline, As-Flown Timeline, Flight Dynamics Products, SC Incident Reports, PDB updates Level 0 Hkpg Data, LAT Alerts CHS monitoring & trending Integrated Observ. Timeline, Spacecraft Timeline, As-Flown Timeline, Flight Dynamics Products Contingency: LAT Instrument Commands, LAT Instrument Loads, LAT Timeline Mission Planning GSSC Archive & Send Receive & Archive MOC Prelim. Science Timeline, Long Term Science Schedule, Observ. Timeline Package LAT Incident Reports, LAT T&C Database Updates Tested OK Commands to Verify LAT Test Bed All data into ISOC, and products out Alerts, Logs, Process status, File status Anomaly Tracking & Notification System Database Web Access

  7. Operations Coverage • Weekday, day-time operations • Mission planning, command building • Operator shift coverage • 5 am to 2 pm to cover MOC shift times on East Coast • 9 am to 6 pm to cover ISOC internal coordination needs • Telemetry monitoring and science data processing: 24/7 • Continuous automatic processing • On-call support available 24/7 • Support for targets of opportunity, anomalies • Operators for real-time commanding or anomaly support • Software engineer for emergency software support • Computer technician for computer/network support • Team Lead and Instrument Physicist for anomalies

  8. ISOC Operations Facility • Working with SLAC management and Facilities group to define near-term ISOC operations facility. Coordinating ISOC space requirements with LAT project management. • Near-term ISOC facility: a new temporary building at SLAC • Long-term ISOC facility: discussions are starting with SLAC and KIPAC management on ISOC facility in new Kavli building at SLAC, available 2006. Also ISOC presence on Stanford campus.

  9. ISOC Operations Layout

  10. ISOC Development Schedule Phase / Milestone Aug-04 Sep-04 Oct-04 Nov-04 Dec-04 Jan-05 Feb-05 Mar-05 Apr-05 May-05 Jun-05 Jul-05 Aug-05 Sep-05 Oct-05 Nov-05 Dec-05 Jan-06 Feb-06 Mar-06 Apr-06 May-06 Jun-06 Jul-06 Aug-06 Sep-06 Oct-06 Nov-06 Dec-06 Jan-07 Feb-07 Mar-07 ISOC CDR GSDR ITOS setup/configuration ISOC Verif. with Test Bed DB/Web/E-logbook Dev Plotting/Trending Dev Mission Planning Dev Diagnostic Tool Dev ISOC Demos ISOC Simulation Testing ISOC SW Releases 1 4 2 3 Ground Readiness Tests 3 4 7 2 6 5 End-to-End Tests 6 5 4 3 1 2 Environmental tests at NRL ISOC testing at NRL ISOC ready to take over LAT operation ISOC used to I/F with LAT (front-door only) Mission Simulations Launch SW Dev Slack Times