1 / 5

2009 Renewable Energy Program Summary of Changes

2009 Renewable Energy Program Summary of Changes. Program Design. Program Consolidation Allocation of Resources Funding Cycles Capacity Blocks – linked to rebate amount – rebate amount fluctuates block to block Program to be monitored Incentive Design Solar New Rebate Levels

latonyad
Télécharger la présentation

2009 Renewable Energy Program Summary of Changes

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 2009 Renewable Energy Program Summary of Changes

  2. Program Design • Program Consolidation • Allocation of Resources • Funding Cycles • Capacity Blocks – linked to rebate amount – rebate amount fluctuates block to block • Program to be monitored • Incentive Design • Solar New Rebate Levels • LTE 10 kW – Residential Rebate $1.75/W w/audit, $1.55/W wo/audit • 0-50 kW – Commercial Rebate $1.00/W • Greater than 50 kW – No rebate for entire project • Wind and Biomass remain unchanged

  3. Program Design • Application Process • New Application and forms for required for 2009 Program • Newly signed contract required for 2009 Program • Application returned if deemed incomplete or if funding is expended • Projects must receive an approval letter prior to start of installation • Renewable energy project incentives are capped at the size of initial application • Reservation Commitment • Expiration period shall be maintained at 12 months for residential projects

  4. Program Design Open Items • Incentive Design • No specific incentive for Fuel Cells • Methodology of calculating a residential rebate for hybrid systems consisting of capacity and production based rebates shall adhere to the production based cap • Equipment eligibility for New Jersey Manufacturer’s incentive • CHP shall be eligible for C&I CHP funding and renewable biomass incentive • Past Participation • Entity Caps shall correspond with reduced rebates for smaller systems and reduced levels of funding • Expanded Project Cap adopted to prevent gaming of 50 kW rebate cap

  5. Technical Requirements • QC to QA Transition • Implemented by end of Q2 2009 • Training required of installers • Monitoring requirements established • Ongoing evaluation of contractor and program performance • An inspection will be requested for all projects • Verification of Reported Generation • System metering required of all projects • Estimated performance eliminated for small projects • Date of REC Generation • Established to be the interconnection date • Interconnection date will need to be provided by the appropriate utility

More Related