Baidyabati Municipality Draft Development Plan 2007
AGENDA • Municipal Vision • Planning Context, Demography and Overall Focus • The Process • Initiating the DDP • Surveys • The Stakeholders • Key Challenges • Development Objectives and Projects • The Financial Plan
MUNICIPAL VISION Baidyabati Municipality aspires to be a model municipal town - • Where all the citizens belonging to all the categories can have adequate and equitable access to the basic Municipal Services. • Where all the citizens will have a clean and green environment and live a healthy and carefree life involving themselves in cultivation of improved art and culture, keeping parity with its traditional flow.
Where all the young people (Male & Female) irrespective of Caste and creed will have the employment or self – employment facilities according to their skill and qualification. • Where economic condition will be such as can combat poverty aiming at its permanent alleviation in the long – run.
PLANNING CONTEXT • Baidyabati ,an old habitat in Hooghly was known to have footprints of lord Chaitanya about 400 years back. • Baidyabati Municipality composed of two important urban settlement limits :Baidyabati & Sheoraphuly. • Baidyabati Municipality was established in the year 1869 . • Situated at west to river Ganges .
DEMOGRAPHY • Total Area : 12.09 Sq Km. Growth of population:2.025 per year. • Total population :1,08,231. • No of Household 28537.
Density of Population 8951.94 • Sex Ratio919.16. • Total Literate Percent78.05 % • 22 Wards – highest population concentration in Wards 6 (444 pph), 5 (345pph), 12 (272 pph), 9 (262 pph), 3 (224 pph), 2 (213 pph), 7 (201 pph • 23 slums with maximum concentration in Ward 4, 11, 14, 17
FOCUS OF THIS DDP • Better Service to the citizens • Poverty elevation. • Education for all. • Improved Public Health Delivery System. • Institutional strengthening. • Maximize citizen satisfaction. • Solution of problems in a properly planned fashion.
THE PROCESS • Formal interactions • Many informal interactions
INITIATING THE DDP • Meeting among all Councilors • This is an opportunity for capacity building therefore – all staff would be involved in the process. • DPG and DTG (3) formed – functional delineation of responsibility but, close coordination in decision making – communication was key. • CDS, TCGs, Health Workers, RCVs – extensively involved in community consultations – provided an insight into the houses of residents.
SURVEYS • Primary data collection • Technical survey for Component 1 • Traffic Survey • Socio economic survey • QSS • Social Mapping • LED Survey • Citizens Satisfaction Survey • School Survey • All relevant secondary data • In analysis – detailed GIS mapping done
THE STAKEHOLDERS • Citizens of Baidyabati Municipality • ALL Staff of municipality • CDS Groups, TCGs, RCVs, Health Workers • Slum dwellers • Local Trade Associations & Industrialist • Informal & Formal Sector Workers • Pre Primary and Primary School staff • NGOs
KEY CHALLENGES • Baidyabati is an old town that has grown unplanned. • Limitations in the field of overall resource availability. • There were gaps in socio economic and infrastructure datasets, thus resulting on a greater emphasis on the use of secondary data, perceived priorities of stakeholders for the purpose of planning.
Key Issues • Component 1:Infrastructure, Land use and Environment Development • Sub-com-Slum Infrastructure improvement plan • Slum dwellers of this municipality do not get minimum basic services. • Sub-com- 1.2 Intra Municipal Infrastructure Improvement Plan • People of this municipality are in scarcity of water & also suffering from water logging problems. • Road networking system is not upto the mark. • There is no recreational facilities like park, cultural centre • There is no ward offices.
Sub-com- 1.3 Trans Municipal Infrastructure Improvement Plan • This municipality is dependent on water supply to Serampore municipality which is not sufficient • The road networking system of this area (Baidyabati, Serampore ,Champdani)is not upto the mark. • Drainage system is not sufficient to carry the storm water Sub-com- 1.4 Land use Development Plan • Baidyabati Municipality is a unplanned city and road encroachment is a common phenomenon and there is lack vacant places for giving basic services. Sub-com- 1.5 Environment Management Plan • The condition of overall pollution would not be a very big problem, but the trend is alarming as the adjoining areas are having a lot of industries. Also, the River Hooghly at the eastern side is supposed to be polluted day by day
Sample Objectives • Com-1 Infrastructure, Land use and Environment Development • Sub-Com-1.1 Sub-com-Slum Infrastructure improvement plan • Ensure basic infrastructure to all slums • Enhance community participation in construction, operations and maintenance of infrastructure in the slum • Sub-Com- 1.2 Intra Municipal Infrastructure Improvement Plan --To provide piped water to all residents. -- To provide proper drainage to avoid water logging. • Sub-Com- 1.3 Trans Municipal Infrastructure Improvement Plan -- Improvement of arterial road networks with the regional road networks
Sub-Com-1.4 Land use Development Plan -- Estimate the status of every individual plot of the municipality and setting up a data bank. • Identify vacant lands to utilize for various services • Estimate the status of every individual plot of the municipality and setting up a data bank. • Sub-Com-1.5 Environment Management Plan • Identification of the basic environmental problems and assess the basic health condition linked with these within this municipal area. • Offer a sustainable and citizen friendly environment with more greenery and maximum level of safety .
IDENTIFIED PROJECTS1.1 Slum Infrastructure Improvement Plan • 23 slums of which 2 already supported under KUSP • Remaining 21 slums to be taken up on basis of QSS. • From KUSP funds an additional 2 slums will be funded. • 19 slums will be funded from other sources • TOTAL ALLOCATION FOR DDP PERIOD FROM ALL SOURCES = Rs. . 4690.109 lacs(47 crores)
IDENTIFIED PROJECTS1.2 Intra Municipal Infrastructure Improvement Plan • Maintenance of existing infrastructure and services. • Construction of new drains. • Improvement of roads. • Extension of water supply network & setting of new deep tube well. • Modernization of solid waste collection system. • Setting up of ward office ,Park & Playgrounds. • TOTAL ALLOCATION FOR DDP PERIOD FROM ALL SOURCES = Rs. 3902.94 Lakhs (approx. Rs. 39 crores).
IDENTIFIED PROJECTSComponent 1: Infrastructure, Land use and Environment Development 1.3 Trans Municipal Infrastructure Improvement Plan. 1.Over bridge at Baidyabati Railway Gate. 2.Widening of R.B.S. Road of Baidyabati & Champdani Municipality. 3.Surface water treatment plant involving three municipalities – Baidyabati, Champdani & Bhadreswar. 4.Drainage System of Baidyabati Municipality and Champdani Municipality. 5.Drainage System improvement of Baidyabati & Serampore. 6.Supply of water from Champdani Municipality to adjacent area of Baidyabati Municipality. 7.Construction of one Degree College & Stadium at Indira Maidan, Champdani. 8.Repairing of A. P. Ghosh Road & Bahir Serampore
IDENTIFIED PROJECTS1.4 Land use Development Plan • The Boropits Along Both Sides Of Delhi Road Will Be Considered Under Pisciculture • Building Rules — FAR to be introduced • Rehabitation of the people of the Harijan Busti • Change of Land Use Zoning from “Ag”(agricultural) : Parcel 1, Parcel 2 and Parcel 3 to “RI”(residential – industrial) in Ward Nos. 8, 22 and 17 respectively • Residential cum Shopping Complex • Office of the Ward Committee at Ward no.-1-22. • New road alignment through vacant spaces • Improvement & development of Sheoraphuli Railway Station along with station are dispersed facilities (KMDA) • Roads identified for gradual widening through Development Control Regulations • Park at Ward no. 3,6,7,8,9,11,14,15,16,17,18,19,22. • TOTAL ALLOCATION FOR DDP PERIOD FROM ALL SOURCES = Rs. 1528 Lacs (approx. Rs. 15 crores)
IDENTIFIED PROJECTS1.5 Environment Management Plan • Water Supply System (Deep Tubewell) at Ward No. 1, 7,8,9,11,14,15,16,18,19,20. • Wet Lands / Ponds. • Community Awareness for environmental issues like air pollution, water pollution, different diseases &banning use of plastic carry bags etc • Plantation of Trees.
Drain (0.3 M/0.6 M/1 M) at ward no. 1 to 22 • Solid waste management at Ward no. 1 to 22. • Setting up of Parks at Ward no. 3,6,7,8,9,11,14,15,16,17,18,19,22. • Improvement of Sewerage at Ward no. 1 to 22. • TOTAL ALLOCATION FOR DDP PERIOD FROM ALL SOURCES = Rs. 20 Lacks .
Key Issues • Component 2: Social and Livelihoods Development • Sub-Com-2.1 Livelihood and Poverty Alleviation • Existing UPE cell is week and not functioning properly • Existing CDS, NHG, NHC are week and not functioning properly • Sub-Com-2.2 Local Economic Development • informal sectors especially the ghumtiwalas were unable to obtain license. • Obtaining of pollution control certificate was also a delayed process as expressed by the formal sector. • Both the sectors were not fully satisfied with the performance of banks in sanctioning of a loan.
Sub-Com-2.3 Health Care Service Delivery Improvement Plan • Poor programme management • Poor service delivery • Sub-Com-2.4 Primary Education Improvement Plan • Lack of proper relationship between teachers, students and parents. • Poor performance of the teachers. • Non availability of logistic facilities in the schools.
Sample Objectives • Component 2: Social and Livelihoods Development • Sub-Com-2.1 Livelihood and Poverty Alleviation • Strengthening existing institutional and community structures in the ULB • Strengthening UPE Cell for its structural development • Increase poor peoples’ accessibility to the various govt. allocated fund and scheme • Sub-Com-2.2 Local Economic Development • Establishment of strong and simplified regulatory processes such as issue of building permits and trade licenses. • Identification, strengthening local and traditional artisans and provide basic infrastructure and basic services
Sub-com-2.3 Health Care Service Delivery Improvement Plan • Increased accessibility of people of Baidyabati Municipality to quality health care. • Minimizing gap between health services provided by health unit of Baidyabati Municipality and the actual requirement of health services by the people • Strengthening and/or developing Health Management Information System for updating the knowledge and bridging the gaps between requirement and provision of health care services • Sub-Com-2.4 Primary Education Improvement Plan • Improvement of status of infrastructure and logistic facilities/services of primary schools across the municipal areas. • Creating an enabling environment by way of introducing joyful learning
IDENTIFIED PROJECTS2.1 Livelihood and Poverty Alleviation • Upgradation of existing UPE Cell • Better Functioning of UPE Cell Members/ CO/CDS Members/Group Secretaries. • Creation of computerized database on schemes and population coverage per scheme. • Public awareness on the details of various programme/schemes for poverty eradication through effective IEC materials.
Development of performance Indicators for measuring performance of UPE Cell, TPO, CO, CDS and each group • Upgradation of function of CDS . • Need assessment and vocational training support on various trades for skill building both for production and basics of project preparation and negotiation • Formation and facilitation of DWCUA Groups • TOTAL ALLOCATION FOR DDP PERIOD FROM ALL SOURCES = Rs. 33.3 Lac
IDENTIFIED PROJECTS2.2 Local Economic Development • Creation of a Regulatory Board within the ULB to simplify the process and issue of license and building permit • Special Cell for viability assessment of the small/medium industries. • Training of Rickshaw Pullers/Auto Drivers/Bus Conductors on public relation in collaboration with respective union for Improvement in behaviour of bus conductors . • PRASHIKSHANI- A model skill building training centre for the people within Baidyabati Municipality and beyond • TOTAL ALLOCATION FOR DDP PERIOD FROM ALL SOURCES = Rs 61.9 Lac
IDENTIFIED PROJECTS2.3 Health Care Service Delivery Improvement Plan • Development of Health Management Information System, • Increase Ambulance Service. • Training and Sensitization of Ward Councilors, CDS, NHCs, NHGs, HHWs and RCVs. • Creation and strengthening HFW Committee • Training/Upgradation of all health service providers. • Development of IEC/BCC materials or items for building awareness • Special Study on Occupational Health. • Infrastructural Development with improved services • Establishment of ESOPD, RDC • Reproductive Health Care with Family Welfare Service
Child Health Care. • Promotion of health insurance. • Adolescent and School Health Programme. • Awareness on Prevention and Control TB,Leprosy, HIV/AIDS, Malaria and other communicable diseases. • TOTAL ALLOCATION FOR DDP PERIOD FROM ALL SOURCES = Rs. 71.435 Lac
IDENTIFIED PROJECTS2.4 Primary Education Improvement Plan • Establishment of new Primary Schools/SSK Infrastructural Improvement • Provision of Play and Entertainment materials. • Adult Education linked with Vocational Training. • Human Resource Development • TOTAL ALLOCATION FOR DDP PERIOD FROM ALL SOURCES = Rs. 45.245.
Key Issues • Component 3: Municipal Institutional Strengthening Plan 3.1 Organization Development Plan • The organizational structure is quite hazy, overlapping in nature and to some extent incomplete. • Different departments are working with various system structures which are to be synchronized and a robust service delivery mechanism is required for the citizen of the ULB
3.2 Internal Processes and Systems • Highly time consuming process • Improper allocation of job • Too much paper work. • Inadequate manpower. 3.3 Citizens Interface Plan • ULB not Closer to the People • Decentralization and Devolution missing • Accountability and Responsiveness non Transparent
Sample Objectives • Component 3: Municipal Institutional Strengthening Plan 3.1 Organization Development Plan • Ensure proper functioning of ward committees. • Establish good communication between all departments • Ensure official discipline , accountability of employees and assess their performance. • Make reallocation of work and judicious distribution of work load among employees.
3.2 Internal Processes and Systems • To lean down the bulky work processes. • To implement or to regularize the up gradation of technologies in the service delivery. • To provide better services to the citizen qualitatively spending minimum time. 3.3 Citizens Interface Plan -Transfer adequate powers to Ward Committees to collect specific user charges Commitment to deliver quality services to citizens in line with Citizen’s Charter Grievance readdressed
IDENTIFIED PROJECTS3.1 Organisation Development Plan • Strengthen service delivery mechanism. • Strengthening of Statutory Committees • Training of employees • Increase of transparency in municipal governance • Regularization of pay & others to permanent employees • .Regularization of casual employees. • Filling up vacant posts • Implementation of reward system in municipal governance • Re structurisation of departments • Job Allocation • Generation of ownership of civic infra-structure and municipal plans • Increase participation and of Governance stake-holders, CDS, NHG, NHC, Ward Committees. • Increase of inclusiveness in municipal governance • Creation of new posts • TOTAL ALLOCATION FOR DDP PERIOD FROM ALL SOURCES = Rs. 97.10 Lac
IDENTIFIED PROJECTS3.2 Internal Processes and Systems Improvement Plan • Computerization including software development. • Instituting an annual citizens satisfaction survey • Information sharing. • Single window operating system. • Inter-departmental coordination. • Intra municipal performance appraisal system. • TOTAL ALLOCATION FOR DDP PERIOD FROM ALL SOURCES = Rs.25,390 (approx. Rs. 25 lakhs)
IDENTIFIED PROJECTS3.3 Citizens Interface Plan • Decentralization of Municipal operation to Ward offices. • Development of municipal websites. • Update Citizen’s Charter. Total Allocation for DDP period from all sources Rs 5,25,000(Approx 5 Lacs)
DEVELOPMENT GOALSComponent 3: Municipal Institutional Strengthening Plan 3.4 Financial Plan • To undertake detailed revenue potential assessments together with the revenue department staff, • contribute to the cost, deduction analysis of costs of activities in the utility departments of BM. • To achieve effective administration of existing taxes, refurbishing of major taxes, efficient pricing of all • the directly chargeable urban services, increasing use of non-tax sources.
To enhance the scope of tax and non-tax sources to increase revenue. • To explore option to raise debt capital, assess financial viability of select project investment andrepayment capacity of BM. • To identify methods to reduce finance cost and ensure better cash flow. • To explore the options to undertake revenue generating projects through public- private partnership. • To prepare the annual budget of BM on a more scientific basis than that being practiced.
IDENTIFIED PROJECTS3.4 Financial Plan • Various interventions for improvements in • Water charges • Advertisement tax • Identification of new sources of revenue • Assessment and tax • License fees • Expenditure management • Asset management
Major projections in Rs./ Lacs year wise are as under FP Version I
The Table below presenting the Computation of Investible Surplus Rs./Lacs
The Overview of the FP Version – II Component wise is shown below Rs. / Lacs
TOTAL FINANCIAL ALLOCATION • Component 1 = Rs. 10,141.049 Lacs • Component 2 = Rs. 211.88 Lacs • Component 3 = Rs. 127.10 Lacs • TOTAL = Rs. 10480.029 Lacs
PUBLIC VALIDATION • The DPG & DTGs’checked each & every component of DDP for quality following a structured DDP quality Check format. • This was placed for public validations & annoucement are made through various media. • 200 participants at the meeting. • Valuable interaction. • Written feedback on DDP document • Comments received were largely incorporated either later or had already been included