1 / 9

2. Procurement Principles

2. Procurement Principles. Quality is integrated in all processes & stages. Maximise economy and efficiency. Encourage as wide a solicitation of proposals as possible to promote competition.

ledell
Télécharger la présentation

2. Procurement Principles

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 2. Procurement Principles • Quality is integrated in all processes & stages. • Maximise economy and efficiency. • Encourage as wide a solicitation of proposals as possible to promote competition. • Encourage and include sources of supply indigenous either to the country being assisted or from other developing countries. • Encourage and include sources of supply from underutilized major donor countries. • Promote integrity and fairness and maintain the transparency of the procurement process.

  2. 3. The Aim of Procurement • RIGHT Goods/Services at the • RIGHT Quality • RIGHT Price • RIGHT Quantity • RIGHT Time • RIGHT Place "The Six Rights "

  3. 3.1 Providing the RIGHT Goods/Service • involves: • Getting all the information that enables you to make the right purchase decision by: • Knowing the specifications (size, colour, performance, tensile strength, formulation etc.) • Conducting Market Research to identify: • Availability (different types) • History (bad reports, failure rates, legal issues) • Consumer preferences • Local support and back-up (trained personnel to handle implementation and maintenance service, availability of spare parts etc.).

  4. 3.2 Providing the RIGHT Quality involves: • Perform thorough evaluation of supplier before contract award based on documentary evidence, factory inspections and samples of commodity. • Conducting sampling and testing before shipment by independent inspection company and laboratory to a pre-determined testing protocol known by the supplier at time of contract award. • Ensure that all commodities conform to international standards. • Fit for purpose for which it is acquired.

  5. 3.3 Providing at the RIGHT Price involves: • Market research (International/Local). • Competitive Bidding (ICB/LIB), Request for Proposal (RFP), Request for Quotation (RFQ) or Negotiation. • Identifying the Right Source. • The RIGHT Specification (WHO, MOH Essential Drug list, UNICEF Catalog, UNFPA/TSD Contraceptives list). • Identifying the Right Source (Manuf., Agent, Trader). • Economic quantities. • Appropriate contract terms.

  6. 3.4 Establishing the RIGHT Quantities involves knowing: • Usage rates (past consumption patterns and levels, e.g. preferences between IUD's and female condoms and the overall volume). • Storage and distribution capacity (shelf-life of product). • Mode of transportation. • Economic Order Quantity: Economies of Scale, Discounts for larger orders, Storage, Usage Rate. • Budget availability.

  7. 3.5 Providing goods/services at the RIGHT Time: • Lead time: the time between the issuance of a request and receipt of the goods, incl.: • Time for Order Processing (FO and HQ) • Time for Manufacturing Process • Time for shipment to Destination • Time for Inspection / Custom clearance • Time required for internal distribution.

  8. 3.6 Providing the goods to the RIGHT Place involves emphasis on training: • Correct Consignee Address & Details (indicate special port if applicable). • Correct Documentation (AWB, B/L, invoice, packing list, Certificate of Analysis, etc.). • ** Indication of Special requirements for Licensing, packaging, inspection, labeling, keep cool items, etc. ** • Import licenses, Exemptions.

  9. 5. Steps in the Procurement Cycle Need Identified UNFPA FIELD OFFICE or External client Budget Identified & Requisition raised Procurement Unit Invoice Goods received Receiving & Inspection Report Supplier Qualification Shipping Advice Market Research Delivery >US$100,0000 CRC RFP / ITB > US$ 30,000 Specifications Checked Certify Funds by UNFPA Finance Branch Purchase Order SUPPLIER Request for Quotations <US$30,000 PSS/UNFPA April, 2004

More Related