1 / 1

Assessment and remediation of contaminated sites

Assessment and remediation of contaminated sites. The HAWA project has successfully updated the list of illegal HW dumpsites for the Bangalore Urban & Rural districts in co-ordination with KSPCB. This has resulted in the short listing of the three most important HW dumpsites. NO. Recorded.

lefty
Télécharger la présentation

Assessment and remediation of contaminated sites

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Assessment and remediation of contaminated sites The HAWA project has successfully updated the list of illegal HW dumpsites for the Bangalore Urban & Rural districts in co-ordination with KSPCB. This has resulted in the short listing of the three most important HW dumpsites. NO Recorded • Remediation Planning of a Model Contaminated Site in Karnataka • Developed Database - CPCB format (January 2005) • Classified and prioritized potential risky site – 3 sites short listed (February 2005)  • Selected One Potentially Risk site (Bommasandra Illegal Dump site) as a pilot project for remediation plan (21.05.2005) • Geological, geo-hydrological and geo-electric study of the proposed Hazardous Waste Management in the KIADB area at Bommasandra ( July 2005) • Prepared remediation Action Plan with scheduling and financial assessment (October 2005) • Facilitate KIADB, KSPCB, DFEE & Industrial Association in remediation work modalities (September 2006 – ongoing) • Implementation of the Remediation preparation work YES • Outcomes • State wide inventory report on investigation of HW illegal dump site in Karnataka was prepared • Clean-up of more than 10 sites by the industries • Remediation plan for one model site prepared • About 45 people trained

More Related