1 / 11

ATHENA WFI Meeting

ATHENA WFI Meeting. Garching , January 28, 2014. Markus Plattner. General ESA Project Lifecycle. Schedule for this Call for L2 Mission Concepts. ATHENA LoI submission deadline: 17 February 2014 (12:00 noon CET ) Briefing meeting (ESTEC) 5 March 2014 ( tbc )

leone
Télécharger la présentation

ATHENA WFI Meeting

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. ATHENA WFI Meeting Garching, January 28, 2014 Markus Plattner

  2. General ESA Project Lifecycle ECSS-M-ST-10C_Rev.1(6March2009)_Space project management - Project planning and implementation

  3. Schedule for this Call for L2 Mission Concepts ATHENA LoIsubmission deadline:17 February 2014 (12:00 noon CET) Briefing meeting (ESTEC) 5 March 2014 (tbc) Proposal submission deadline:15 April 2014 (12:00 noon CET) Proposal evaluation April 2014 - June 2014

  4. Mission Concept – Expected Content • The mission Concept must address the science goals • Top level requirements: • High throughput optics: ≈ 2 m² collecting area) • High angular resolution: 5 arcsec • Wide field of view in the focal plane • Energy resolution: 2.5 eV • Technical Budget Envelopes: • Ariane 5 ECA: < 10 tons mass, 5.4 m diameter, 17 m height • < 75 Mbit/s downlink data rate (for Ka band, LagrangePoint L2) • Contribution from international partners (upon inter-agency agreements) is limited to 20% of the total mission envelope.

  5. Call for Mission Concept – Important Points ESA assessment of mission concept: Feasibility, technology readiness, international collaboration scheme (if applicable) Announcement of Opportunity (early 2015 tbc): Consortium shall be selected. Teams or payload consortia shall not be pre-selected in the mission concept The minimum request is to reach TRL 5/6 at mission adoption (2018/2019): Component and/or Breadboard Critical Function Verification in Relevant Environment  Effective overall time for mission preparation including necessary technology developments: 2014 until 2019.

  6. ATHENA Phase 0 and A Schedule

  7. Work Breakdown Structure – Overview

  8. WFI – Flight Hardware Architecture (1st Draft)

  9. WBS Flight System

  10. WBS Ground Support / Integration & Operation

  11. Work Breakdown Structure – Top Level

More Related