Required Slide. SESSION CODE: DPR206. Visual Studio ALM: Lessons Learned Through Dogfooding. Brian Harry Technical Fellow Microsoft Corporation. Agenda Lessons Learned Through Dogfooding. Overview TFS at Microsoft Getting started on a release Development Tracking and Reporting
Visual Studio ALM: Lessons Learned Through Dogfooding
E N D
Presentation Transcript
Required Slide SESSION CODE: DPR206 Visual Studio ALM: Lessons Learned Through Dogfooding Brian Harry Technical Fellow Microsoft Corporation
AgendaLessons Learned Through Dogfooding • Overview • TFS at Microsoft • Getting started on a release • Development • Tracking and Reporting • Validation
Visual Studio ALM Progression • V1 - Transparency • V2 - Bringing together development & test • V3 - ?
TFS in Developer Division • 3,839 Recent users • 18.7TB Storage • 826,234,724 Files • 1,594,094 Checkins • 839,595 Work Items • At least 10 different locations, including 4 “major” ones
AgendaLessons Learned Through Dogfooding • Getting started on a release • Planning
Planning And Tracking The Challenge • Is the organization aligned? • How are we doing against biz objectives? • Are we making progress on the right things? What We’ve Learned • Align the organization around key objectives • Leverage TFS to reflect the planning process • Use TFS Office integration for daily tracking • Use TFS for end to end traceability and reporting
Our Process – VS 2010 • Main objectives Pillars • Value proposition • Value Props • Value Props • Feature Groups Feature Groups Feature Groups Feature Groups • Features Deliverables Deliverables Deliverables Deliverables
Value Propositions • Deliverables
Features • Deliverables
AgendaLessons Learned Through Dogfooding • Getting started on a release • Development • Organizing the Work • Branching
Organizing the Work The Challenge • Incredibly difficult to drive a release with 2,000 people. High degree of churn. Complex interdependencies. Inexorable schedule The Solution • “Feature Crews” • Mini-development organization • Semi-autonomous • Accountable for delivering quality
Checkpoints Keep Focus • Checkpoint 0 – Scope • Checkpoint 1 – Plan • Checkpoint 2 – Demo • Quality gates & Merge
Quality as You Go • Development and test are simultaneous • Developers & Testers share responsibility • Developers & Testers share tools • Test planning • Unit testing • Functional testing • Manual testing • Performance testing • Stress testing
Builds • Every checkin built & verified • Build • Code Analysis • Checkin tests • Nightly builds provide QA updates
Quality Gates Prevent Chaos • Carry no debt in feature development • Feature Must Pass “Quality Gates” on Finish before • Feature complete • Test Complete • All Bugs Fixed • Security Plan • Static Code Analysis • Code Coverage • No Performance Regressions • Localization Testing • API Reviews • Feature may merge to active branch only when Quality Gates are met
2005 Debt vs. 2008 Debt VS 2005 Beta 1 Product Bugs only VS 2008 Beta 1 ALL bug debt
Branch Strategy The Challenge • Massive division – 2,000+ people • Code churning at every level The Solution • Isolation and Integration • Isolate major feature areas in branches • Automate branch quality checks • Rhythm of regular merges • Handles integration complexity
Source/Branch Structure • 1 branch per product • Gated checkin procedure • VBLs build in parallel • Nightly test suites verify branch health • Regular schedule for merges • Stringent criteria for merges to main $/DEV10/Main $/DEV10/PU/ <BranchName> $/DEV10/PU /<BranchName> $/DEV10/feature/ <BranchName> $/DEV10/feature/ <BranchName>
AgendaLessons Learned Through Dogfooding • Getting started on a release • Development • Tracking and Reporting • Trustworthy Transparency • Top Tracking Metrics
Trustworthy Transparency The Challenge Each team needs to optimize process differently for their needs Leadership teams need central rollup to trackprogress. The Solution • Fantastic hub-spoke federated model… • All teams use TFS for central tracking • Each team uses best process for its needs • Single reporting system
AgendaLessons Learned Through Dogfooding • Getting started on a release • Development • Tracking and Reporting • Trustworthy Transparency • Top Tracking Metrics • Validation
Validation The Challenge • How do you make sure a public release is high quality? The Solution • Integration testing • Overall Gut Feel “OGF” • Stress testing • Slowdown the churn
Shutdown Process • Full test pass • Zero Bug Bounce (ZBB) • Zero Resolved Bounce (ZRB) • Tell Mode • Verification test pass • Ask Mode • Escrow
Summary • We have rolled our learnings back into our tools • We have encountered problems • We have learned • We have rolled our learnings back into the tool • We Believe In These Tools • Scales to Massive Commercial Development • Widely tested • I hope you can learn and benefit from our experience