NPOESS Status Andrew Heidinger, VIIRS OAT co-chair and Jeff Key

NPOESS Status Andrew Heidinger, VIIRS OAT co-chair and Jeff Key NOAA/NESDIS/Office of Research and Applications Madison, Wisconsin July 27, 2006. Baseline NPOESS Products (aka EDRs) pre Nunn-McCurdy. Nunn-McCurdy Impacts on NPOESS. The NPOESS budget went from $ 6.5B to $11.5B

libby
Télécharger la présentation

NPOESS Status Andrew Heidinger, VIIRS OAT co-chair and Jeff Key

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NPOESS Status Andrew Heidinger, VIIRS OAT co-chair and Jeff Key NOAA/NESDIS/Office of Research and Applications Madison, Wisconsin July 27, 2006

  2. Baseline NPOESS Products (aka EDRs) pre Nunn-McCurdy

  3. Nunn-McCurdy Impacts on NPOESS • The NPOESS budget went from $ 6.5B to $11.5B • Because NPOESS is run under DOD procurement procedures, this budget overrun caused a review under the Nunn-McCurdy Act. • Defense Department organized a comprehensive review of the program. • Defense Department reviewers recommended: • reducing the number of satellites planned from six to four • dropping several climate sensors, • rebidding a contract for a key scientific instrument. • The entire NPOESS contract has to be renegotiated with NGST and there may be more changes especially in the EDR generation area. • The Integrated Program Office has also been reorganized.

  4. Decision Drivers in Redefining NPOESS • Continuity • Lower Risk • Growth Potential • Affordability

  5. Justification for Changes: Preserves Weather Forecasting Capability Improvements • Afternoon orbit contains advanced imager and advanced sounder to enhance weather forecasting • Reliance upon METOP in mid-morning orbit • AVHRR vs VIIRS: preserves some imagery capability • METOPscatterometer and advanced atmospheric sounder enhance operational weather forecasting capability in mid morning orbit • No microwave imager/sounder on C1 • METOP scatterometer for ocean winds and waves becomes primary instrument until new imager/sounder is available on C2 • Continue reliance on DMSP (SSM/I) for ocean wind speed

  6. Schedule Impacts: pre Nunn-McCurdy post Nunn-McCurdy CALENDAR YEAR AM F13 C4 F19 F20 F17 C2 M mid-AM F16 F18 Metop D Metop A Metop C Metop B C3 PM N N’ C1 NPP AQUA 05 06 07 08 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 09

  7. Post N-M Sensor Manifest • 1730 Orbit (C2, C4)1330 Orbit (C1, C3)2130 Orbit • VIIRS VIIRS Metop • wave imager mwave imager SARSAT CrIS ATMS SEM OMPS (Nadir) SARSAT A-DCS CERES (C1)

  8. POST N-M Sensor Integration: Non-Manifested Sensors 17301330 TSIS SESS SESS ERBS ALT APS OMPS (Limb) Information on how these sensors can be manifested will be forthcoming.

  9. Sensor Configuration pre Nunn-McCurdy

  10. Sensor Configuration post Nunn-McCurdy for C1 Worst Case for C1 -wave

  11. Post Nunn McCurdy Sensors (from IPO brief to the SUAG on 20 July 2006) Manifested

  12. NOAA Impacts and Mitigation Strategy • CMIS: Ocean wind speed and direction • Mitigation: Rely on MetOp and DMSP • SEM: Space Environment Monitor (of SESS) • Mitigation: Fly POES operational SEM instrument • Maintain capability on POES • APS: Aerosol data for air quality forecasts and role of aerosols in climate; • Mitigation: NASA still to fly first APS in this decade • ALT: Characterization of sea surface heights; • Mitigation: Navy developing mitigation plan for altimetry • ERBS: provides ability to understand changes in the Earth’s radiation budget • Mitigation: Fly NASA CERES research instrument on C1 • TSIS: ability to understand changes in solar irradiance • Not flown on NOAA satellites

  13. Summary of Major N-M Impacts • CMIS is gone but a redesigned microwave imager-sounder is planned for C2 • 21:30 NPOESS satellite is gone and DOD/DOC will rely on the European METOP (AVHRR/IASI/AMSU). NO VIIRS IN MID-AM. • OMPS limb-sounder is gone. • NPP is delayed until 2010 • C1 is delayed until 2013 • C5 and C6 are gone. • NPOESS will keep space for climate sensors but will not fund their design (similar to instruments of opportunity on the GOES satellites).

  14. Summary • NPOESS took a big hit in the N-M review and is a smaller program. Climate instruments may not fly (e.g., CERES, APS). • VIIRS technical issues are being solved and it should serve the aviation community well. • CrIS should provide improved AIRS performance in some regions and more spectral coverage. • Unfortunately, the microwave imager is gone until at least C2 (2016)