1 / 18

P14417: B9 Particle Filter

P14417: B9 Particle Filter. Cycle 3: System Integration and Testing. Dan Anderson Thomas Heberle Perry Hosmer Karina Roundtree Kelly Stover. Agenda. Final Design System Integration Issues Requirements Update Testing Update Risks Project Plan Action Items Purchasing & Cost Summary

lieu
Télécharger la présentation

P14417: B9 Particle Filter

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. P14417: B9 Particle Filter Cycle 3: System Integration and Testing Dan Anderson Thomas Heberle Perry Hosmer Karina Roundtree Kelly Stover

  2. Agenda Final Design System Integration Issues Requirements Update Testing Update Risks Project Plan Action Items Purchasing & Cost Summary Documentation Problem Management Review

  3. Final Design

  4. System Integration Two problems occurred during building: • Bolts were too short- easily fixed by getting longer bolts. Issue occurred due to a measurement assumption. 2. Placed mesh on wrong side of lid assembly • Was not possible to fix but was able to use it for taste testing So far no problems have occurred that will prevent the collection of data.

  5. Engineering Requirements and Test Plans Test Plans: Here

  6. Turbidity & Flow Rate Testing Update • Testing performed on water from pond near Global Village • Genesee River was frozen over • Three prototypes have been used to test how well the assembly works • Testing has been successful! • We plan to continue flow and turbidity tests through the first week in April. • Genesee River water • Custom water (varying levels of sand and soil added to tap water)

  7. Turbidity & Flow Rate Testing Update

  8. Turbidity

  9. Flowrate

  10. Taste Testing

  11. Durability Testing • Brush • Procedure • Ordering • Bucket Assembly • Procedure • Location

  12. Risks

  13. Project Plan

  14. Action Items

  15. Already Purchased Upcoming Purchases Purchased Parts • 4 Prototypes • Mesh • Buckets • Lids • Bolts/Nuts • Testing Supplies • Cups • Spring Water • Brushes for durability testing • Sand and topsoil for additional cleaning and flow testing

  16. Cost Summaries

  17. Documentation • Imagine RIT • Poster - Outline created started filling in information • Paper • Outside Submission

  18. Problem Management Review • Schedule • Flow Rate Testing Pushed Back • Durability Testing Pushed Back • Brush Durability • Setting up Testing • Incorrect Assembly for one prototype • Taste Testing • Brush Durability

More Related