1 / 2

Mong Kok

Before. After. Mong Kok. Sai Yeung Choi Street South. Benefits. Measurements taken by EPD Respirable suspended particles (RSP) level lowered by 11% in Causeway Bay and Mong Kok, where part-time pedestrian schemes have been implemented. Traffic noise level reduced by 3 dB to 6 dB.

lila-bright
Télécharger la présentation

Mong Kok

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Before After Mong Kok Sai Yeung Choi Street South

  2. Benefits Measurements taken by EPD • Respirable suspended particles (RSP) level lowered by 11% in Causeway Bay and Mong Kok, where part-time pedestrian schemes have been implemented. • Traffic noise level reduced by 3 dB to 6 dB. Reduction in vehicle speed • With introduction of traffic calming measures such as speed tables, the average vehicle speed could be reduced from 25 km/hr to 16 km/hr.

More Related