1 / 46

Management Science Modeling of Risk in 21 st Century Supply Chains

Management Science Modeling of Risk in 21 st Century Supply Chains. David L. Olson James & H.K. Stuart Chancellor’s Distinguished Chair University of Nebraska - Lincoln. Risk & Business. Taking risk is fundamental to doing business Insurance Lloyd’s of London Hedging Risk exchange swaps

lilia
Télécharger la présentation

Management Science Modeling of Risk in 21 st Century Supply Chains

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Management Science Modeling of Risk in 21st Century Supply Chains David L. Olson James & H.K. Stuart Chancellor’s Distinguished Chair University of Nebraska - Lincoln

  2. Risk & Business • Taking risk is fundamental to doing business • Insurance • Lloyd’s of London • Hedging • Risk exchange swaps • Derivatives/options • Catastrophe equity puts (cat-e-puts) • ERM seeks to rationally manage these risks • Be a Risk Shaper 3-C Risk Forum 2011

  3. Iceland volcanoApril 2010 • European air cargo shut down for days • South Carolina BMW plant slowed due to lack of leather seat covers from South Africa, & transmissions from Europe • Tesco flower & produce deliveries from Kenya disrupted • NYC flower district shipments from the Dutch disrupted • Migros Swiss supermarkets missed asparagus from US, tuna from SE Asia • Italian cheese & fruit producers lost $14 million/day • RESPONSES • DHE & FedEx moved as much as possible through Spain, southern Europe • Those with business continuity plans fared better than their competitors

  4. Japanincluding Fukushima nuclear plant • Munic Re estimated $210 billion in disaster losses • Of 210 million, only 60 million insured • Sony/Ericsson had to redesign handsets, use components they could obtain • New Zealand earthquakes in 2011 - $20 million • US tornados in 2011 - $14.5 million • Australian floods in 2011 – 7.3 million

  5. 2011 Thai floods • Oct 2011 worst in 50 years • 373 dead • Thai has been a manufacturing base for Japanese & American car companies & global technology firms • HONDA: postponed launch of Life minicar • TOYOTA: planned to cut output in North America • DIGI INTERNATIONAL: chip maker shut down facilities • LENOVO: constrained by lack of hard disk supply • FUJITSU IT services: disrupted by hard disk supply • NIPPON STEEL: lost 300,000 tons of lost production • AUTOLIV: airbags & seatbelts – cut sales forecasts • TESCO UK retailer: temporarily closed 30 stores in Thailand • CANON: cut forecasts • SONY, NIKON: forced to close plants

  6. 2012 Thai floods • Not as bad as 2011 • Economic growth only 0.1% • Government blamed for mismanagement • 4 dead as of 12 September

  7. Bangladesh clothing factory fire25 Nov 2012 • Dhaka • 12 story building housed four factories • Over 100 dead • Served Wal-Mart, Sears

  8. Supply Chain Risks & Outsourcing FAIM 2008 Conference, University of Skövde

  9. Continued FAIM 2008 Conference, University of Skövde

  10. SUPPLY CHAIN REACTIONMarsh Consulting • Establish priorities for SKUs • Alternate routing • Additional storage (inventory) • Collaborate with cargo carriers • Alternative ground routes if air disrupted • Communicate contingency plans within organization • Review contracts • Diversity source base

  11. Contemporary Economics • Harry Markowitz [1952] • RISK IS VARIANCE • Efficient frontier – tradeoff of risk, return • Correlations – diversify • William Sharpe [1970] • Capital asset pricing model • Evaluate investments in terms of risk & return relative to the market as a whole • The riskier a stock, the greater profit potential • Thus RISK IS OPPORTUNITY • Eugene Fama[1965] • Efficient market theory • market price incorporates perfect information • Random walks in price around equilibrium value 3-C Risk Forum 2011

  12. Enterprise Risk Management Definition • Systematic, integrated approach • Manage all risks facing organization • External • Economic (market - price, demand change) • Financial (insurance, currency exchange) • Political/Legal • Technological • Demographic • Internal • Human error • Fraud • Systems failure • Disrupted production • Means to anticipate, measure, control risk

  13. DIFFERENCES

  14. COSOCommittee of Sponsoring OrganizationsTreadway Committee – 1990sSmiechewicz [2001] • Assign responsibility • Board of directors • Establish organization’s risk appetite • establish audit & risk management policies • Executives assume ownership • Policies express position on integrity, ethics • Responsibilities for insurance, auditing, loan review, credit, legal compliance, quality, security • Common language • Risk definitions specific to organization • Value-adding framework

  15. Risk Management ToolsOlson & Wu Supply Chain Risk Management (2012) • Multiple criteria analysis • Evaluative • subjective • Simulation • Evaluative • Probabilistic; Can be subjective (system dynamics) • Chance constrained programming • Optimization • Probabilistic • Data envelopment analysis • Optimization • Objective, subjective, probabilistic

  16. Long Term Capital Management • Black-Scholes – model pricing derivatives • LTCM formed to take advantage • Heavy cost to participate • Did fabulously well • 1998 invested in Russian banks • Russian banks collapsed • LTCM bailed out by US Fed • LTCM too big to allow to collapse 3-C Risk Forum 2011

  17. Correlated Investments • EMT assumes independence across investments • DIVERSIFY – invest in countercyclical products • LMX spiral blamed on assuming independence of risk probabilities • LTCM blamed on misunderstanding of investment independence 3-C Risk Forum 2011

  18. Information Technology • 1990s very hot profession • Venture capital threw money at Internet ideas • Stock prices skyrocketed • IPOs made many very rich nerds • Most failed • 2002 bubble burst • IT industry still in trouble • ERP, outsourcing 3-C Risk Forum 2011

  19. Real Estate • Considered safest investment around • 1981 deregulation • In some places (California) consistent high rates of price inflation • Banks eager to invest in mortgages – created tranches of mortgage portfolios • 2008 – interest rates fell • Soon many risky mortgages cost more than houses worth • SUBPRIME MORTGAGE COLLAPSE • Risk avoidance system so interconnected that most banks at risk 3-C Risk Forum 2011

  20. “All the Devils Are Here”Nocera & McLean, 2010 • Circa 2005 – Financial industry urge to optimize • J.P. Morgan, other banks hired mathematicians, physicists, rocket scientists, to create complex risk models & products • Credit default swap – derivatives based on Value at Risk models • One measure of market risk from one day to the next – MAX EXPOSURE at given probability 3-C Risk Forum 2011

  21. Financial Risk Management • Evaluate chance of loss • PLAN • Hubbard [2009]: identification, assessment, prioritization of risks followed by coordinated and economical application of resources to minimize, monitor, and control the probability and/or impact of unfortunate events • WATCH, DO SOMETHING 3-C Risk Forum 2011

  22. Value-at-Risk • One of most widely used models in financial risk management (Gordon [2009]) • Maximum expected loss over given time horizon at given confidence level • Typically how much would you expect to lose 99% of the time over the next day (typical trading horizon) • Implication – will do worse (1-0.99) proportion of the time 3-C Risk Forum 2011

  23. VaR = 0.64expect to exceed 99% of time in 1 yearHere loss = 10 – 0.64 = 9.36 3-C Risk Forum 2011

  24. Use • Basel Capital Accord • Banks encouraged to use internal models to measure VaR • Use to ensure capital adequacy (liquidity) • Compute daily at 99th percentile • Can use others • Minimum price shock equivalent to 10 trading days (holding period) • Historical observation period ≥1 year • Capital charge ≥ 3 x average daily VaR of last 60 business days 3-C Risk Forum 2011

  25. Limits • At 99% level, will exceed 3-4 times per year • Distributions have fat tails • Only considers probability of loss – not magnitude • Conditional Value-At-Risk • Weighted average between VaR & losses exceeding VaR • Aim to reduce probability a portfolio will incur large losses 3-C Risk Forum 2011

  26. Skewness & Assymetry • Median vs. expectation • If distribution normal, the same • NOT: Assume 90% of stocks made 10% gain; 10% lost 100% Median gained 10% Expectation = 0.9*[1.1]+0.1*[0] = 0.99 1% loss • MANY OUTCOMES NOT NORMALLY DISTRIBUTED • Negative exponential • Cancer deaths; if survive a given period, likely to last • Lognormal (financial ratios)

  27. Fat Tails • Investors tend to assume normal distribution • Real investment data bell shaped • Normal distribution well-developed, widely understood • TALEB [2007] • BLACK SWANS • Humans tend to assume if they haven’t seen it, it’s impossible • BUT REAL INVESTMENT DATA OFF AT EXTREMES • Rare events have higher probability of occurring than normal distribution would imply • Power-Log distribution • Student-t • Logistic • Normal 3-C Risk Forum 2011

  28. Modeling Investments ProblematicAPPROACHES TO THE PROBLEM • MAKE THE MODELS BETTER • The economic theoretical way • But human systems too complex to completely capture • Black-Scholes a good example • PRACTICAL ALTERNATIVES • Buffett • Soros 3-C Risk Forum 2011

  29. Better ModelsCooper [2008] • Efficient market hypothesis • Inaccurate description of real markets • disregards bubbles • FAT TAILS • Hyman Minsky [2008] • Financial instability hypothesis • Markets can generate waves of credit expansion, asset inflation, reverse • Positive feedback leads to wild swings • Need central banking control • Mandelbrot & Hudson [2004] • Fractal models • Better description of real market swings 3-C Risk Forum 2011

  30. Models are Flawed • Soros got rich taking advantage of flaws in other peoples’ models • Buffett is a contrarian investor • In that he buys what he views as underpriced in underlying long-run value (assets>price); • holds until convinced otherwise • Avoids buying what he doesn’t understand (IT) 3-C Risk Forum 2011

  31. Nassim Taleb • Black Swans • Human fallability in cognitive understanding • Investors considered successful in bubble-forming period are headed for disaster • BLOW-Ups • There is no profit in joining the band-wagon • Seek investments where everyone else is wrong • Seek High-payoff on these long shots • Lottery-investment approach • Except the odds in your favor 3-C Risk Forum 2011

  32. Supply Chain Perspective of ERM • Historical vertical integration • Standard Oil, US Steel, Alcoa • Traditional military • Control all aspects of the supply chain • Contemporary • Cooperative effort • Common standards • High competition • Specialization • Internet • Service oriented architecture 3-C Risk Forum 2011

  33. Supply Chain Problems • Land Rover • Key supplier insolvent, laid off 1000 • Dole 1998 • Hurricane Mitch hit banana plantations • Ford • 9/11/2001 suspended air delivery, closed 5 plants • 1997 Indonesian Rupiah devalued 50% • Blocked out of US supply chains • Jakarta public transport reduced operations, high repair parts • Li & Fung shifted production from Indonesia to other Asian sources 3-C Risk Forum 2011

  34. More Problems • Taiwan earthquake 1999 • Dell & Apple supply chains short components a few weeks • Apple had shortages • Dell avoided problems through price incentives on alternatives • Philips semiconductor plant in New Mexico burnt 2000 • Ericsson lost sales revenue • Nokia had designed modular components, obtained alternative chips 3-C Risk Forum 2011

  35. New Mexico microchip plant lightning17 March 2000 • Provided microchips to Nokia, Ericsson • Ericsson – learned of fire 2 weeks later • Earnings dropped $400 million • Cut thousands of jobs • Merged with Sony on some product lines • Nokia • Constantly monitored suppliers • Learned from disruption in 1999 • Profit up 42% in 2000

  36. Supply Chain Risk Sources • Giunipero, AlyEltantawy [2004] • Political events • Product availability • Distance from source • Industry capacity • Demand fluctuation • Technology change • Labor market change • Financial instability • Management turnover 3-C Risk Forum 2011

  37. Robust StrategiesTang [2006] • Postponement – standardization, commonality, modular design • Strategic stock – safety stock for strategic items only • Flexible supply base – avoid sole sourcing • Economic supply incentives – subsidize key items, such as flu vaccine • Flexible transportation – multi-carrier systems, alliances • Dynamic pricing & promotion – yield management • Dynamic assortment planning – influence demand • Silent product rollover – slow product introduction - Zara 3-C Risk Forum 2011

  38. Practical View: Warren Buffett • Conservative investment view • There is an underlying worth (value) to each firm • Stock market prices vary from that worth • BUY UNDERPRICED FIRMS • HOLD • At least until your confidence is shaken • ONLY INVEST IN THINGS YOU UNDERSTAND • NOT INCOMPATIBLE WITH EMT 3-C Risk Forum 2011

  39. Empirical • BUBBLES • Dutch tulip mania – early 17th Century • South Sea Company – 1711-1720 • Mississippi Company – 1719-1720 • Isaac Newton got burned: “I can calculate the motion of heavenly bodies but not the madness of people.” 3-C Risk Forum 2011

  40. Modern Bubbles • London Market Exchange (LMX) spiral • 1983 excess-of-loss reinsurance popular • Syndicates ended up paying themselves to insure themselves against ruin • Viewed risks as independent • WEREN’T: hedging cycle among same pool of insurers • Hurricane Alicia in 1983 stretched the system 3-C Risk Forum 2011

  41. Practical View: George Soros • Humans fallable • Bubbles examples reflexivity • Human decisions affect data they analyze for future decisions • Human nature to join the band-wagon • Causes bubble • Some shock brings down prices • JUMP ON INITIAL BUBBLE-FORMING INVESTMENT OPPORTUNITIES • Help the bubble along • WHEN NEAR BURSTING, BAIL OUT 3-C Risk Forum 2011

  42. Views of Bubbles 3-C Risk Forum 2011

  43. Taleb Statistical View • Mathematics • Fair coin flips have a 50/50 probability of heads or tails • If you observe 99 heads in succession, probability of heads on next toss = 0.5 • CASINO VIEW • If you observe 99 heads in succession, probably the flipper is crooked • MAKE SURE STATISTICS ARE APPROPRIATE TO DECISION 3-C Risk Forum 2011

  44. CASINO RISK • Have game outcomes down to a science • ACTUAL DISASTERS • A tiger bit Siegfried or Roy – loss about $100 million • A contractor suffered in constructing a hotel annex, sued, lost – tried to dynamite casino • Casinos required to file with Internal Revenue Service – an employee failed to do that for years – Casino had to pay huge fine (risked license) • Casino owner’s daughter kidnapped – he violated gambling laws to use casino money to raise ransom 3-C Risk Forum 2011

  45. DEALING WITH RISK • Management responsible for ALL risks facing an organization • CANNOT POSSIBLY EXPECT TO ANTICIPATE ALL • AVOID SEEKING OPTIMAL PROFIT THROUGH ARBITRAGE • FOCUS ON CONTINGENCY PLANNING • CONSIDER MULTIPLE CRITERIA • MISTRUST MODELS 3-C Risk Forum 2011

  46. Conclusions • Risk management of growing importance • Including supply chains – opportunities with risks • Models can help • Fast, dynamic situations • Large quantities of data • Economic models require complex, accurate data • More than can be expected • Practical • ACCEPT THE RISKS YOU CAN COPE WITH • The things you are professionally good at • HEDGE (INSURE, whatever) the others • But it costs

More Related