An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. CS 194 Research Checkpoint Paul Salzman Advisor: Professor Glenn Reinman Winter 2007

  2. Outline • Proposed Checkpoint Goals • Current Accomplishments • Difficulties • Next Steps

  3. Proposed Checkpoint Goals • Develop a simulator using SESC with MINT • 4-8 weeks • Create various workloads for the simulated architecture • 1-2 weeks

  4. Accomplishments • Heterogeneous Cores up and running. • Network latency modeling on its way. • Still in the process of developing a simulator using SESC with MINT

  5. Difficulties • Lack of up to date simulator documentation. • Network communication latency modeler functional but disconnected in simulator.

  6. Next Steps • Tie the network latency modeler into the simulator. • Create various workloads for the simulated architecture • 1-2 weeks • Analyze performance to determine how different resource allocations can be applied. • 8+ weeks