Annual report TC67/SC4/WG3 Wellhead and Xmass tree ISO10423vs API 6A

Annual report TC67/SC4/WG3 Wellhead and Xmass tree ISO10423vs API 6A. WG Scope:standardisation of wellhead and xmass trees plus valves WG convenor :Ries Langereis WG secretary :Alfred Kruyer. WG 3 :ISO 10423.

lionel
Télécharger la présentation

Annual report TC67/SC4/WG3 Wellhead and Xmass tree ISO10423vs API 6A

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Annual report TC67/SC4/WG3Wellhead and Xmass tree ISO10423vs API 6A WG Scope:standardisation of wellhead and xmass trees plus valves WG convenor :Ries Langereis WG secretary :Alfred Kruyer

  2. WG 3 :ISO 10423 • Work programme :work on and issue the 4th edition of ISO 10423 issue end 2009 • Liaise with API SC6,ensure consensus between API 6A-20thvs. and the planned 4th version of ISO 10423 • Liaise with AWHEM to resolve their comments and contributions for vs.4.

  3. WG 3:ISO 10423 • New work group formed during 2006 • Balanced participation between manufacturers and users:Shell,BP,Total,N.Hydro,Vetco,FMC,Mokveld ,Cameron • During 2007 and 2008 many (in)formal meetings held,location an issue re participation,particularly for Americans

  4. 4th version ISO 10423 issues • API 6A 19thvs has implemented NACE ISO 15156;vs 2004 • New project group formed under Thierry Cassagne Total ,Derek Milliams Shell of the ISO 15156 maintenance panel involved . • The brief was :can API 6A 19thvs re NACE -2004 implementation be incorporated in vs.4 ?? • Main conclusion :No show stoppers • ISO 10423-4 will than require more extensive marking re Temp.,Cl,pH and H2S limitations • ASTM A 453,grade 660 is non acceptable for H2S, in particular for exposed bolts.

  5. 4th version ISO 10423 issues • Repair and Re-manufact.O.E.M. is incorporated into the ISO standard ,not in API 6A due to legal reasons • Severe hurricanes have convinced MMI,API SC6 that a repair standard is now required. • Shell,BP,Statoilhave reviewed current ISO standard and because of an OEM clause have concluded it is superior to API and other proposals . • API SC6 had formed active Wg on the repair clause via Exxon Sterling Lewis and Gary Devlin-Cameron. • New version proposed using OPD:original product definition.This proposal has been ballotted within API and approved so they say • ISO WG3 Have informally ballotted large users and they accept viz.OEM –OPD to ensure unity-not really happy. • API SC6 been informed that our WG3 accepts the new wording of OPD-version • Current DIS contains OEM,however vs.4 now includes OPD

  6. 4th Version ISO 10423 issues • Castings and forgings issue,workgroup formed under Alfred Kruyer • Background :API allows always castings,ISO instructs wrought products only used for PSL3,4.We must have consensus between ISO and API • Report presented at Gouda dec.2006,presented in Houston at API Sc6 jan. 2007 • API in agreement with findings and now accepts ISO and a ballot would be held within SC6 ,this was done during back-adapt vs.4 • ISO might recomsidercurrent position on castings vs. forgings • However will only react upon ballot results from SC6. • NACE ,ISO 15156 and ISO 13628 dealing with forgings only as it uses ISO 10423 as base document • New workgroup formed API/ISO.under Sterling Lewis/Maarten Kuipers. • Separate presentation of findings next week during SC6

  7. 4th version ISO 10423 issues • Another solution is to leave as is and await API SC20 to publish a RP for castings • Another solution is :wrought products shall be used ,however user and manufacturer may consider castings if … • Last year 26th june a WG3 meeting took place preceding the API meeting;a final position made forgings a requirement for PSL2 plus.

  8. 4th version ISO 10423 other issues • AWHEMs wish list had been made and forwarded to Shell secretariat,nowcompletely implemented • Normative references have been updated and are part of the new Vs.4 • Gas testing has been upgraded and approved within SC6,has been implemented in Vs.4 • Verification vs.validationnow implemented into Vs.4.

  9. Other issues • 4th edition revision has been manageable,went straight into FDIS • ISO 13628-4 subsea wellheads sister document.DIS ready and studied ,different tolerances-sorted. • Different hydrostatic test 5.4.6.2.1 • Contains a paint spec.

  10. Pozgrip proposal • Email received from Ben v Bilderbeek on perceived inadequacy of API annular seal tests,oneversus 8 for tubing • Wellheads needed to be as good as tubing • No external loads in API tests • API communication has made clear that standards are not for technical licensing

  11. Pozgrip proposal /observations • Annular seals are usually secondary • Proposal only for metal/metal seals however 80% market is elastomers • If there is such a big problem why have the major operators not come forward towards API/ISO?? • Main area difference between pozgrip and other metal/metal seals is its retraction ability

  12. Pozgrip further actions Advised to go via API SC6

  13. ISO 10423 wg 3-next meetings • Preceeding SC6 ,there will not be a WG meeting • Thursday 1st.july API SC6 meeting • Next Wg 3 meeting will depend on current events and ballots.

  14. BP disaster Deepwater Horizon • Meeting with dutch MMS ,together dealing with all N Sea regulators • Return of OEM mentioned,explained OPD • Verification-externally returning • Need for always annular pressure monitoring • Maintenance period to be prescriptive • Operators asked for re-assurance practices/techniques