WARNING ORDER

DESCRIPTION

WARNING ORDER. SITUATION. MISSION. GENERAL INSTRUCTIONS. SPECIFIC INSTRUCTIONS. TASK ORGANIZATION:. 1ST PLT 2ND PLT 3RD PLT. TEMP: HIGH: LOW: . LIGHT BMNT: SUNRISE: . EENT: MOONRISE: . % ILLUM: .

1 / 15

Download Presentation
Télécharger la présentation

WARNING ORDER

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. WARNING ORDER SITUATION MISSION GENERAL INSTRUCTIONS SPECIFIC INSTRUCTIONS

  2. TASK ORGANIZATION: 1ST PLT 2ND PLT 3RD PLT TEMP: HIGH:LOW: . LIGHT BMNT:SUNRISE: . EENT:MOONRISE: . % ILLUM: . OBSTACLES: AVENUES OF APPROACH: KEY TERRAIN: OBSERVATION: COVER AND CONCEALMENT: VEGETATION: WEATHER AND TERRAIN ATTCH HQ

  3. ENEMY COMPOSITION CAPABILITIES DISPOSITION PIR STRENGTH MOST PROBABLE COA: MOST DANGEROUS COA:

  4. FRIENDLY FORCES LEFT RIGHT FRONT REAR LIFT ATTACK FIRESUPPORT

  5. BN MISSION BN COMMANDER’S INTENT: KEY TASKS: END STATE:

  6. CO MISSION: CO COMMANDER’S INTENT: KEY TASKS: DECISIVE POINT: END STATE:

  7. CONCEPT / COA SKETCH TASK & PURPOSE M/E AND S/E’s MFP’s CONTROL MEASURES DECISIVE POINT

  8. 2ND PLATOON TASKS: 1ST PLATOON TASKS: 3RD PLATOON TASKS: MORTARS: DELTA PLATOON TASKS: TASKS:

  9. COORDINATING INSTRUCTIONS 1. REHERSAL PRIORITY: 2. ENGAGEMENT AND DISENGAGEMENT CRITERIA/INSRUCTIONS: 3. FIRE DISTRIBUTION AND CONTROL MEASURES: 4. CULMINATION: PLATOON- SQUAD- 5. MOVEMENT (OOM, TECHNIQUES, FORMATIONS): 6. MOPP LEVEL: 7. ADA STATUS/WARNING:

  10. COORDINATING INSTRUCTIONS 11. CONTINGENCIES 8. CONSOL / REORG PLAN: 9. GROUND MVMT: 12. ROE (CHANGES) 10. LINKUP PLAN:

  11. DATE/TIME EVENT DATE/TIME EVENT TIME SCHEDULE CO OPORD OBSTLS COMPLETE BACKBRIEFS DIG ASSETS ARRIVE CO REHEARSALS DIG ASSETS DEPART NLT DEFEND TIME INSPECTIONS COMMEX SANDTABLE COMPLETE TEST FIRE EARLIEST TIME MOVEMENT CHALK LEADER BRIEF RECON SP PZ POSTURE 1ST BIRD TOUCHDOWN CAS PREP H-HOUR 105MM PREP NLT TIME 81MM PREP 60MM PREP HIT TIME

  12. A. RATION CYCLE G. RESUPPLY PLAN B. ARMS/AMMO: C. SPECIAL EQUIPMENT: D. TRANSPORTATION: E. CASEVAC PLAN: LOCATION OF CCPS: (ENROUTE, ON OBJ) METHOD OF MARKING CCP: LOCATION OF FWD AID STATION: MEDEVAC LZ LOCATIONS: (ENROUTE, ON OBJ) F. METHOD OF HANDLING EPWs/COBS: SERVICE AND SUPPORT

  13. COMMAND 1) SUCCUSSION OF COMMAND 3) LOCATION OF XO AND 1SG: 2) LOCATION OF CDR ENROUTE ON OBJ SIGNAL (1) NET ID’s: CO CMD . BN CMD . BN O&I . BN A&L . FIRES . MTR . CAN . OTHER . (2) SIGNALS: (3) CHALLENGE/PASSWORD: NEAR FAR (4) NUMBER COMBO: VEHICLE MARKINGS (5) RUNNING PASSWORD COMMAND AND SIGNAL

  14. PZ DIAGRAM

  15. CONFIRMATION BACK BRIEF ENEMY MOST PROBABLE COA TIMELINE BN CDRs INTENT ISSUES/CONCERNS CONCEPT OF THE OP CDRS BACK BRIEF BCs INTENT • CONCEPT MISSION ANALYSIS SPECIFIED IMPLIED • UNIT STATUS • PERSONNEL • EQUIPMENT • LIMITATIONS • QUESTIONS • ASSISTANCE • CO RESTATED MISSION • INTENT