Certified Quality

Floor length. Diagonal length. Certified Quality. Use of diagonals and consoles when building. Single building Number of diagonals for floor load 150 kg/m² Number of diagonals for floor load 200 kg/m² Number of diagonals for floor load 300 kg/m² NP = not possible

liz
Télécharger la présentation

Certified Quality

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Floor length Diagonal length Certified Quality Use of diagonals and consoles when building • Single building • Number of diagonals for floor load 150 kg/m² • Number of diagonals for floor load 200 kg/m² • Number of diagonals for floor load 300 kg/m² • NP = not possible • This also applies if there are several levels lying one above the other, whereby only 1 floor at a time may be loaded with the useful payload and a second level may only have half the payload. • Building may not jeopardise the stability of the scaffolding, and may never take place on mobile scaffolding • The number of diagonals must always be placed on both sides of the development. 2014-06 Altrad Balliauw – all sites (Look out for site-specific rules!)

  2. Certified Quality Use of diagonals and consoles when building • Multiple buildings • Number of diagonals for floor load 150 kg/m² • Number of diagonals for floor load 200 kg/m² • Number of diagonals for floor load 300 kg/m² • NP = not possible • This also applies if there are several levels lying one above the other, whereby only 1 floor at a time may be loaded with the useful payload and a second level may only have half the payload. • Building may not jeopardise the stability of the scaffolding, and may never take place on mobile scaffolding • The specified number of diagonals must always be placed on 2 sections located next to each other, on the outside the numbers of the single buildings are used. 2014-06 Altrad Balliauw – all sites (Look out for site-specific rules!)

  3. Certified Quality Use of diagonals and consoles when building • Consoles • Console 0.39 m • Console 0.73 m • Load class in accordance with EN 12811-1 2014-06 Altrad Balliauw – all sites (Look out for site-specific rules!)

  4. Certified Quality Use of diagonals and consoles when building • Consoles • Console 1.09 m without extra connection between the struts • Console 1.09 m with connection between the struts using a beam • Load class in accordance with EN 12811-1 2014-06 Altrad Balliauw – all sites (Look out for site-specific rules!)