lonna
Uploaded by
24 SLIDES
396 VUES
240LIKES

Scheduling Update 2014-2015

DESCRIPTION

Scheduling Update 2014-2015. Scheduling Timeline. Sophomores February 10-14 English Class. Developing a Master Schedule.

1 / 24

Télécharger la présentation

Scheduling Update 2014-2015

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript

Playing audio...

  1. Scheduling Update2014-2015

  2. Scheduling Timeline Sophomores February 10-14 English Class

  3. Developing a Master Schedule • Building and planning the master schedule for the following school year is a difficult and complex task.  Situations may occur requiring a change to that schedule, however these alterations have a serious effect on class size, teacher assignments, and the overall schedule, therefore these changes are made sparingly.  The student and parent are strongly encouraged NOT to plan a course load with the idea that it can be adjusted at a later time.

  4. New Schedule Change Policy • A schedule change may occur within the first five (5) days of a semester. One of the following criteria must be met to have a schedule change.

  5. New Schedule Change Policy • 1. Student schedule does not include the minimum number of required six classes each semester • 2. Adjustments due to the successful completion of summer coursework or summer school • 3. Error in a student’s schedule due to academic misplacement • 4. Error in a student’s schedule due clerical error

  6. Adding a Course • Without dropping any scheduled courses, a student may add additional course(s) where enrollment permits and without any alteration to the original schedule.

  7. Lowering a Level • Students will be permitted to lower a level, for example, Honors English to CP English, with the recommendation of the teacher at the quarter, or at the semester only.

  8. Graduation Requirements • Course Selection Guide on line on Counseling Web Site. • Credits required for grade level designation: • 15 Senior • 10 Junior • 5 Sophomore

  9. Graduation RequirementsClass of 2014 and Beyond • 4 English • 4 Math (including Algebra 2 or equivalent) • 3 Science • 3 Social Studies (1 WH, 1 US, .5 Govt, .5 elective) • 1 Fine Art • .5 Health, .5 PE (2 semesters) • 4 Elective Credits • Pass OGT • Financial Literacy* • 20 Total Credits

  10. Diploma with Honors • 4 English • 4 Math (including Algebra 2) • 4 Science (including Physics) • 4 Social Studies • 3 World Language (or 2 of 2) • 1 Fine Arts • 3.5 Un-weighted GPA (posted on Naviance) • 27 ACT or 1210 SAT (CR and M)

  11. Typical Schedule • 6 classes (1 study period, 1 lunch period) • 7 classes (1 lunch period)

  12. Athletic Eligibility ELIGIBILITY • Based on the last nine weeks • You must have passed 5 credits • You can only have one “F” in the last grading period • All athletes are monitored on a weekly basis • If you receive 2 “F’s” in one week, you will be declared ineligible until at least one of the “F’s” is raised • If your GPA is below 2.000, you will be placed on Conditional Eligibility and you will be monitored by all of your teachers • who will fill out a weekly progress report on your progress. If your work level drops in two or more classes, you will be declared • ineligible until it improves

  13. Junior Offerings(Current Sophomores) • English – • AP English Language • Honors English 11 • English 11 Continue appropriate level based on teacher recommendation

  14. Junior Offerings(Current Sophomores) • Social Studies • AP US History (teacher recommendation) • AP US Government • (APUSH pre-requisite) • Government • Elective (Economics, AP Economics, Sociology, Psychology, 21st Century)

  15. Junior Offerings(Current Sophomores) Math • Geometry • Honors Geometry • Algebra 2 • Honors Algebra 2 • Pre-Calculus • Honors Pre-Calculus • Probability & Statistics • AP Stats • AP Calculus AB

  16. Junior Offerings(Current Sophomores) Science • Chemistry • Honors Chemistry • Anatomy & Physiology • AP Environmental Science • Physics • AP Physics • AP Biology • AP Chemistry

  17. Junior Offerings (Continued) • World Language • Not a graduation requirement • At least 2 years for college • 3 years for Diploma with Honors • To advance to Spanish 3 a student must complete Regular Spanish 2

  18. Junior Offerings (Continued) • Health & PE • G.Y.M • Personal Fitness Training • Sport Education • Sport Management • Health • IPEP

  19. Educational Options • EXCEL TECC • Current Sophomores and Juniors • Opportunity Day January 30 • Applications on line

  20. Post Secondary Enrollment Options • 3.0 GPA • Complete PSEO Enrollment form and return by March 30 • Apply to College • Take English, Math placement exams • Be accepted • Register

  21. Ohio Graduation Test • 5 parts • Reading, Writing, Math, Science, and Social Studies • Scores • Basic • Limited • Proficient • Accelerated • Advanced

  22. Ways to Improve your score • Work hard in your classes • Spend some time reviewing past material • Ohio Department of Education Website Resources

  23. Electives • Art: Ceramics, Computer Graphics, Drawing, Design & Illustration, Digital Photography, Jewelry & Metalsmithing, Painting, Photography, Printmaking, Sculpture, 2-D & 3-D Port Prep • Computer Science: Computer Programming, Computer Science Principles, AP Computer Science, Honors Advanced Data Structures • English: Speech, Words, Creative Writing, Intro to Journalism, Digital Journalism • Business & Technology: Accounting, Business Law, Marketing, Business Principles, Financial Literacy, Video Production • Music: Band, Orchestra, Women’s Choir, Mixed Ensemble, AP Music Theory • Social Studies: 21st Century History & Culture

  24. Reminder • Scheduling will begin February 10. • Have your courses picked out. • New Schedule Change Policy: Do not anticipate that you will be able to change courses.

More Related