Inside Passage Electric Cooperative, Inc February 20, 2014 FERC P-14066 Hoonah, Alaska. Gartina Falls Hydro Project. Hoonah, Alaska. Juneau, AK. Hoonah, AK. Hoonah: 20 min Flight Time from Juneau. Hydro Project. Gartina Falls Hydro Project: 4.5 Miles Outside of Hoonah.

loren
Télécharger la présentation

Gartina Falls Hydro Project

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Inside Passage Electric Cooperative, Inc February 20, 2014 FERC P-14066 Hoonah, Alaska Gartina Falls Hydro Project

  2. Hoonah, Alaska Juneau, AK Hoonah, AK Hoonah: 20 min Flight Time from Juneau Hydro Project Gartina Falls Hydro Project: 4.5 Miles Outside of Hoonah

  3. FERC License in 1-yr-3 mo Project Success • 2010 thru 2011—Collected Information • Official Project Start—October, 2011 • FERC License January, 2013 • Road Construction in 2013 • Project Construction in 2014 • $1.3 Million to License • $6.9 Million to Build

  4. Why Gartina Falls is GOOD! • Reasonable Expectations • 100% Grant Funded • Elevation Change over Short Distance • Close to Existing Road System/Grid • Local Construction • Year-Round Flow • Community/Agency Support

  5. Project Performance • Run-of-River • 450KW Peak Output • Diesel Cost = 31¢ a Kwh • Annual Diesel Fuel Use= 331,000 gal. • Hydro reduces Fuel Use ~100,000 gal. • Annual Fuel Savings of $400,000

  6. 2013 Construction New ½ Mile Access Road to Intake Area

  7. 2013 Construction

  8. 2014 Construction

  9. Project plan Intake Diversion Powerhouse Gartina Falls Hydroelectric Project, Hoonah, FERC P-14066