1 / 20

SHORT TERM OPEN ACCESS CASE STUDIES

SHORT TERM OPEN ACCESS CASE STUDIES. KAYAMKULAM POWER TO TNEB. Name of customer : TNEB Name of injecting Utility : KyCCPP Name of Drawee Utility : TNEB Name of Trader : NVVNL Intervening State Transmission Utility: KSEB

lot
Télécharger la présentation

SHORT TERM OPEN ACCESS CASE STUDIES

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. SHORT TERM OPEN ACCESS CASE STUDIES

  2. KAYAMKULAM POWER TO TNEB • Name of customer : TNEB • Name of injecting Utility : KyCCPP • Name of Drawee Utility : TNEB • Name of Trader : NVVNL • Intervening State Transmission Utility: KSEB • Open Access capacity approved • 150 MW from 21.01.05 to 28.02.05 • b) Daily period of the transaction: • 150 MW from 00.00 to 24.00 Hrs MAP

  3. STOA OF KSEB(KYCPP) - TNEB 0000 HRS – 2400 HRS 150MW AT KYCPP EXBUS POINT for 39 days SR KSEB TNEB KYCPP

  4. CALCULATION FOR THE SHORT TERM CUSTOMER FOR THE TRANSACTION OF KYCPP – TNEB OF NVVNL (150 MW)

  5. CALCULATION FOR THE SHORT TERM CUSTOMER FOR THE TRANSACTION OF KYCPP – TNEB OF NVVNL (150 MW)

  6. STOA OF KSEB(KYCPP) - TNEB 0000 HRS – 2400 HRS 150MW AT KYCPP EXBUS POINT for 39 days SR Total STOA Charges : 6Ps/Unit KSEB TNEB 148.9 MW 144.3 MW 150 MW KYCPP

  7. APTRANSCO TO MPSEB THROUGH NVVNL • Name of customer : NVVNL • Name of injecting Utility : APTRANSCO • Name of Drawee Utility : MPSEB • a) Intervening Region : NIL • Intervening inter-regional link, if any SR – WR • c) Intervening State Transmission Utility: NIL • Open Access capacity approved • 200 MW from 08.01.05 to 31.01.05 • b) Daily period of the transaction: • 200 MW from 00.00 to 05.00 Hrs • And 23.00 to 24.00 Hrs MAP

  8. APTRANSCO APTRANSCO - MPSSEB THROUGH NVVNL (0000 HRS – 0500 HRS and 2300 HRS – 2400 HRS ) 200 MW AT INJECTION POINT for 24 days i.e 08.01.05 to 31.01.05 WR MPSEB BHADRAVATHI HVDC SR

  9. CALCULATION FOR THE SHORT TERM CUSTOMER FOR THE TRANSACTION OF APTRANSCO – MPSEB OF NVVNL (200 MW)

  10. CALCULATION FOR THE SHORT TERM CUSTOMER FOR THE TRANSACTION OF APTRANSCO – MPSEB OF NVVNL (200 MW)

  11. MPSEB 186.1 MW APTRANSCO APTRANSCO - MPSSEB THROUGH NVVNL (0000 HRS – 0500 HRS and 2300 HRS – 2400 HRS ) 200 MW AT INJECTION POINT for 24 days i.e 08.01.05 to 31.01.05 Total STOA Charges : 33Ps/Unit 193.8 MW WR 193.8 MW BHADRAVATHI HVDC 200MW SR

  12. WBSEB TO AJMER (RAJASTHAN) THROUGH NVVNL • Name of customer : NVVNL • Name of injecting Utility : WBSEB • Name of Drawee Utility : AJMER(RAJ) • Intervening Region : SR, WR • Intervening inter-regional link : ER – SR, • SR – WR,WR-NR • Intervening State Transmission Utility: RAJASTHAN • Open Access capacity approved • 20 MW from 05.01.05 to 31.01.05 • b) Daily period of the transaction: • 20 MW from 00.00 to 17.00 Hrs • And 23.00 to 24.00 Hrs MAP

  13. CALCULATION FOR THE SHORT TERM CUSTOMER FOR THE TRANSACTION OF WBSEB – AJMER(RAJASTHAN) ( 20 MW) RAJASTHAN WBSEB AJMER NR ER 20 MW WR SR

  14. CALCULATION FOR THE SHORT TERM CUSTOMER FOR THE TRANSACTION OF WBSEB – AJMER(RAJASTHAN) ( 20 MW)

  15. CALCULATION FOR THE SHORT TERM CUSTOMER FOR THE TRANSACTION OF WBSEB – AJMER(RAJASTHAN) (20 MW)

  16. CALCULATION FOR THE SHORT TERM CUSTOMER FOR THE TRANSACTION OF WBSEB – AJMER(RAJASTHAN) ( 20 MW) RAJASTHAN WBSEB AJMER 17.1 MW NR ER 20 MW 17.6 MW 18.1 MW 19.4 MW 18.1 MW 19.4 MW WR 18.8 MW 18.8 MW Total STOA Charges : 78Ps/Unit SR

  17. SUMMARY ESC TO EXIT

  18. REGIONAL GRIDS INSTALLED CAPACITY NORTHERN :- 31,230 MW EASTERN :- 17,697 MW SOUTHERN :- 31,931 MW WESTERN :- 32,354 MW NORTH-EASTERN :- 2,357 MW TOTAL 115,569 MW NORTHERN REGION NORTH-EASTERN REGION EASTERN REGION WESTERNREGION SOUTHERN REGION

  19. REGIONAL GRIDS INSTALLED CAPACITY NORTHERN :- 31,230 MW EASTERN :- 17,697 MW SOUTHERN :- 31,931 MW WESTERN :- 32,354 MW NORTH-EASTERN :- 2,357 MW TOTAL 115,569 MW NORTHERN REGION NORTH-EASTERN REGION EASTERN REGION WESTERNREGION SOUTHERN REGION

  20. REGIONAL GRIDS INSTALLED CAPACITY NORTHERN :- 31,230 MW EASTERN :- 17,697 MW SOUTHERN :- 31,931 MW WESTERN :- 32,354 MW NORTH-EASTERN :- 2,357 MW TOTAL 115,569 MW NORTHERN REGION NORTH-EASTERN REGION EASTERN REGION WESTERNREGION SOUTHERN REGION