This presentation discusses the role of AMF in supporting effective project management, led by Jeremy Fienhold and Don Kranz. Key topics include the importance of a high-level assurance ontology for inter-tool information sharing, as well as the impact of decomposition on design flexibility. It emphasizes the continual review of IV&V efforts, coordination with developers, and identification of process improvement opportunities. Future enhancements to ORBIT integration, reporting capabilities, and user interfaces are also outlined to boost project configuration support.
Supporting Project Management with AMF
E N D
Presentation Transcript
Supporting Project Management with AMF Jeremy Fienhold Don Kranz
Introductions • Don Kranz • Lead Architect for AMF & AWB • Jeremy Fienhold • Lead Analyst on a project using AWB
Analysis & Management Framework • Provides a high level assurance based ontology that allows information to be shared between IV&V tools. • Too much decomposition reduces flexibility, modularity and portability of design. • At the simplest level we deal with: • Projects • Participants • Artifacts • Assessments • Actions
IVV 09-1 Manage Responsibilities • “A continual review of the IV&V effort • Revision of the IPEP as necessary based upon updated Mission Project schedules and development status • Coordination of the IV&V results with the developer and other appropriate management groups • Promotion of technical exchange between IV&V and the developer (to improve technical knowledge transfer and increase IV&V effectiveness) • Identification of process improvement opportunities in the conduct of IV&V”
Scoping Behaviors Modules Scoping
Change Impact Modified Artifact(s) Previous Assessment(s)
Future Functionality • Improve ORBIT integration • Add reporting capabilities • Add Admin UI for project configuration • Improve support of EBA & TR • Integration with COMPASS
References • IVV 09-1 Version O: Independent Verification and Validation Technical Framework, June 06, 2012 • IVV 09-4 Version AF: Project Management, May 2, 2013 • T2103 Version D: Project Execution Plan (IPEP) Template, May 15, 2013 • S3106 Version D: PBRA and RBA Process, October 4, 2012 • AWB User’s Guide • AMF Architecture & Design document