Explore the proposed layout for the Lake Hiawatha pool, featuring zero-depth entry, compliant with ADA regulations and safety codes, including the Abigail Taylor and Virginia Graeme Baker Acts. The design includes Pool Skimming Gutter System, Ground Geysers, Blue Heron Spray, Cattail Spray, and designated site features like fencing, benches, and shade structures. Project schedule includes public meetings, design phase in June to July, bidding in July to August, construction starting late August to September, and opening in Summer 2011.
E N D
Proposed Layout • Code Considerations: • Zero-depth / beach entry – ADA (MN 1101) • Maximum 2 ft. depth (MN 4717.0250, Subp.12 & 4717.1850, Subp. 2A) • Abigail Taylor Act – main drains • Virginia Graeme Baker Act (federal) – main drains
Pool Skimming Gutter System
Pool Features Code Considerations: MN Rules part 4717.2350, Subp. 12. “Fountains or similar features…must be located in areas of two feet or less of water depth. They must be designed to preclude climbing.”
Pool Features Ground Geysers
Pool Features Blue Heron Spray
Pool Features Cattail Spray
Site Features Fencing Code Considerations: MN Rules part 4717.1550, Subp. 4. “Fencing for a wading pool enclosure must be at least…48 inches high for new installations.” MN Rules part 4717.1550, Subp. 5. “New chain link fencing must not exceed 1-1/2 inch mesh for fencing less than eight feet high.”
Site Features Fencing – metal tubing
Site Features Benches
Site Features Shade Structures
Project Schedule Public Meetings: May Design: June – July Bid Phase: 30 days: July – Aug. Construction Start: late Aug. – Sept. Open: Summer 2011