1 / 24

Cootes Paradise Phosphorus Budget and Model Work

Cootes Paradise Phosphorus Budget and Model Work. Jim Moore JEMSys Software Systems Inc. April 2005. Background. Bay of Quinte: two reports by Minns et al. (2004) for Bay of Quinte Scope limited solely to adapting their work to Cootes Paradise Data limited to:

luce
Télécharger la présentation

Cootes Paradise Phosphorus Budget and Model Work

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Cootes Paradise PhosphorusBudget and Model Work Jim Moore JEMSys Software Systems Inc. April 2005

  2. Background • Bay of Quinte: two reports by Minns et al. (2004) for Bay of Quinte • Scope limited solely to adapting their work to Cootes Paradise • Data limited to: a) that collected by Simser (2004) and b) generated by Aquafor Beech (2005)

  3. Overview • Loadings reports do not account for outputs • Objective 1: Water budget • Objective 2: Phosphorus concentrations and budget • Objective 3: Model predicting water column P conc.

  4. Water Budget Schematic

  5. Morphometry Model • Elevation (m): 74.8 (74.2 - 75.7) • Volume (1000 m3): 713.1 (3.8 - 2742.0) • Area (ha): 173.6 (20.4 - 287.3) • Mean Depth (cm): 41.1 (1.9 - 95.5)

  6. Water Budget Data Sources • Levels: CHS Burlington • Creek flows: Aquafor Beech report • Precipitation: DOE Mount Hope • Evaporation: Meredith (1975) equations • STP and summer CSO flows: Simser collection • Urban runoff and other CSO: as in 2nd loadings report • Groundwater: after Ptacek et al. (2004)

  7. Water Budget Summary • Creeks dominate • Other flows significant in summer • Large annual changes in volume

  8. Water Budget Summary • High flushing rates

  9. Exchange Flow Model • QOUT = Q1 - Q2 • Q2 = Alpha * QOUT

  10. P Budget Schematic

  11. P Budget Data Sources • Creeks: Aquafor Beech report; wet-dry, except Spencer • Precipitation: 60 ug/l after Kuntz (1980) for Burlington • STP flows: Simser collection • CSO flows: 2130 ug/l, Simser collection • Urban runoff: 330 ug/l, loadings report • Groundwater: 30 ug/l, after Ptacek et al. (2004) • Water column: CP1/CP2, Simser collection • Settling rate: 0.115 m/day, Minns et. al (2004) • Harbour: annual means, 2nd loadings report

  12. Annual Loading Summary

  13. Summer Loading Summary

  14. Summer Net Loading

  15. Summer Budget Summary

  16. Problem w/ Sediment Model ? • As much as 100% settling per day • Reflux estimates only reflect settling rate

  17. Dynamic Model • Minns (1986) (simple model) • Daily time-step, historical and future 15-year periods • Driven by same data as budget • Hydrological sub-model, simulates all elements of water budget • Water column phosphorus sub-model simulating elements of phosphorus budget • Goal: Predict water column P concentration • Sediment sub-model: sedimentation, reflux, and burial processes

  18. Model Problems • Instability: • Inflows can overwhelm water column store • Settling often overwhelms water column store • Can’t predict reflux • May only be useful if sediments are ignored • May be useful as a gaming tool

  19. Demo

  20. 300 Predicted Conc (ug/l) 150 0 0 150 300 Mean Summer P Conc (ug/l) Predicting Summer P • sediment model off • exchange flow off

  21. Possible Gaming Tool

  22. Highlights • Very dynamic hydrologic regime • Very high flushing rates • Focus on net positive loads • Possible tool for gaming

  23. Next Steps • Confirm morphometry model • Check wet/dry creeks method • Confirm Chedoke (too low??) • Confirm urban runoff • Need working sediment model • Bound exchange flow estimates • Need full-season data

  24. Cootes Paradise PhosphorusBudget and Model Work

More Related