10 likes | 134 Vues
This document outlines the repositioning of beam monitors (BLMBI.Q11, BLMQI.E, and BLMQI.D) towards the nearest interconnection (IC) in the particle collision area. Specific adjustments include shifting monitors based on their positions for optimal functionality while maintaining necessary pathways for safety, especially around the injection area. The focus is on the monitors BLMQI.I20 and BLMQI.E20 for precise monitoring of the incoming beam to the IP (interaction point). Key considerations are made for walkway installations and areas where beam direction remains unchanged.
E N D
BLMBI Q11 to Q11 – 2 monitors: BLMQI.E and BLMQI.D ( slot name) shifted to different direction to the nearest IC (interconnection) QBBI (or QBEI for empty cryostat) DS (Q7/Q8 – Q10)– 1 monitor :BLMQI.I20 or BLMQI.E20 ( expert name) shifted to IC: - In collided beam IP the incoming beam monitor to IP beam to IC except, where walkway installed: In IP where beam not change the side – the nearest monitor to QBBI In injection area – we leave this monitor (not shifted)