Wyoming Pipeline Authority October 2008

Agenda. Sunstone Pipeline ProjectRoute DetailsCapital CostsTransportation RatesValue To ShippersProject ProgressProject Schedule. 2. 1. Sunstone Pipeline. JV partnership among Williams Gas Pipeline Company, TransCanada Pipeline and Sempra Pipelines

lysander
Télécharger la présentation

Wyoming Pipeline Authority October 2008

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


    1. Sunstone Pipeline LLC

    2. Agenda Sunstone Pipeline Project Route Details Capital Costs Transportation Rates Value To Shippers Project Progress Project Schedule 2

    3. 1. Sunstone Pipeline JV partnership among Williams Gas Pipeline Company, TransCanada Pipeline and Sempra Pipelines & Storage Corp. Provides the lowest cost transportation service to the broadest market Pacific Northwest California Northern Nevada Lower risk than greenfield construction Existing corridors, existing infrastructure, existing operators Lower miles Reasonable, scrubbed cost estimate Majority of the capacity subscribed 3

    4. 2. Sunstone Route 4 Permitting Environmental aspects are understood and manageable Utilization of previously permitted corridors will minimize permitting risk and enhance agency cooperation No show stoppers Construction The route is constructible Good access for pipe delivery along the route Good access for work crews along the routePermitting Environmental aspects are understood and manageable Utilization of previously permitted corridors will minimize permitting risk and enhance agency cooperation No show stoppers Construction The route is constructible Good access for pipe delivery along the route Good access for work crews along the route

    5. 3. Estimate Reflects Current Cost Trends Cost estimates in 2011 as spent dollars Escalating steel prices and contractor costs factored into the estimate Validation of costs & route Williams recent and extensive experience in the Rockies (i.e. Kern River Expansion) TransCanada engineers independently validated the Sunstone estimate Third party review Based on November 2011 start date 5

    6. 4. Proposed Rates 6

    7. 5. Competitive Option For PNW, Northern California and Northern Nevada Consumers Diversification: Replace high dependence on Canadian imports with access to Rockies production Reliability: As Canadian Supply declines, supply into western markets becomes the marginal market for Canadian producers Transport capacity to the PNW from Rockies currently at maximum utilization High efficiency transportation reduces fuel costs Access to storage at Jackson Prairie (22 Bcf capacity) and Mist (14 Bcf capacity) 7

    8. 5. Sunstone Offers Rockies Producers Valuable Market Access 8

    9. 5. Valuable Access For Rockies Producers Sunstone features: Highest netback out of the Rockies Lower cost to access Malin Of the two-thirds capacity already committed, 376 MMcfd represents long-term subscription from end-users, reducing producer commitment to launch project Lowest reservation charge, minimizes risk and financial commitment Term differentiated rate options without huge disparity among shippers maintains competitiveness for ALL shippers 9

    10. 5. Valuable Access For Rockies Producers (continued) Sunstone provides access to multiple markets and end-use meters: From Stanfield through interconnects with Northwest Pipeline and GTN Increase in electric generation loads fueling market growth Electric generation loads counter-seasonal to California generation loads Downstream expansions proposed to serve PNW market growth No expansion required on GTN to serve Northern California and Northern Nevada Currently 329 MDth/d available GTN motivated to retain and expand customer base 10

    11. Sunstone Provides Access To Target Markets Sunstone provides access to the broadest market 3.3 Bcfd currently flows into PNW area from the Rockies and Canada Of which, 1.4 Bcfd flows into Northern CA and Northern NV via Malin 0.8 Bcfd expected growth in PNW and CA for 2008-2018 (Wood Mackenzie) 11

    12. Existing & Proposed PNW Gas-Fired Generation 12

    13. Major End-Use Markets Served by Northwest Pipeline & GTN Northwest Pipeline Washington Puget Sound Energy Cascade Natural Gas Avista Corp PacificCorp (Chehalis Power) Oregon Northwest Natural Portland General Electric Avista Corp Cascade Natural Gas Idaho Intermountain Gas Idaho Power Nevada Southwest Gas Sierra Pacific GTN Washington Avista Corp Cascade Natural Gas Oregon Avista Corp PPM (Klamath Falls) Cascade Natural Gas Hermiston Power Portland General Electric Nevada Sierra Pacific California PG&E Sacramento Municipal Utility District Southern California Gas/SDG&E Conoco Phillips 13

    14. 5. NW Region Key to a Viable Project 14

    15. 6. Project Progress On Track Route is essentially fixed, with formal approval process for small reroutes Survey progress: Wetland surveys complete by year end Cultural surveys complete by year end Paleontology surveys complete by year end Survey permission received from 82% of landowners Meetings with regulatory agencies continue to go well Successful FERC pre-filing meeting on October 7 Formal request for pre-filing scheduled for October 21 Seven open houses scheduled for mid-November 15

    16. 7. Schedule Conducted Open Season: March 17 May 30, 2008 Perform Biological and Cultural Surveys: Summer/Fall 2008 NEPA Pre-Filing Request with FERC: October 2008 Place Pipe and Materials Order: No later than May 2009 FERC filing: Q2 2009 FERC Certificate: Q2 2010 Construction Start: Summer 2010 In-Service Date: November 1, 2011 16

    17. These Economic Times Three financially sound partners able to execute on construction of a large pipeline project The silver lining: Economic slowdown means pipe and construction costs may drop before partners need to commit to these costs For every drop of $100 per ton of steel, project saves $40 million

    18. Sunstone Mantras Existing corridor Fewer miles Realistic cost Market diversity and size Lowest cost transportation 18