Preliminary Analysis of Timing Results from DN & GS VRVS Meeting (Jan 20, 2004)

This document presents a very preliminary analysis of timing results from the DN and GS VRVS meeting held on January 20, 2004. The analysis covers data from Runs 6854-6857 (Nov 29, 2003), with approximately 2 hours of live time and about 25,000 events collected. Various hardware checks were conducted, indicating limitations with beam current monitoring and issues with scaler decoding. The results show a time resolution of 86 ps with applied cuts, while future work will focus on resolving hardware issues and enhancing data quality through increased statistics and more comprehensive analysis tools.

maik
Télécharger la présentation

Preliminary Analysis of Timing Results from DN & GS VRVS Meeting (Jan 20, 2004)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. A (very) preliminary result on timing DN & GS VRVS Meeting, 20 Jan 2004 A (very) preliminaryanalysis ...

  2. Data analysis and sample • PRELIMINARY TASK: JUST TL-TR( intrinsic resolution) • Runs 68546857 (29 Nov. 2003) • Live time  2h,  25000gcollected (E>35 MeV in phase with S1&RF) • FSH52 almost completely open (DAC=350) • Trigger based on • S1*Q(LXe)*Q(NaI) • Collimator size: • LXe:9.5 cm • NaI:11 cm • High PMT gain(5106) • Good beam stability A (very) preliminaryanalysis ...

  3. Beam current monitor ~20 sbeam drop Troubles in scaler decoding as the on-line program fails to clear the scaler module in about 50% of cases A (very) preliminaryanalysis ...

  4. Hardware checks • Made use of all TDC channels (FTDC+CTDC+VTDC) although  50%of back PMT see< 5 pe • Cross-talks are largely suppressed at discri level (thanks to 10ns delay cables) but stillarising in VME TDC’s A (very) preliminaryanalysis ...

  5. Hardware checks (2) • Camac TDC’s look free from cross-talks, but poorer quality than FastBus L3 L8 A (very) preliminaryanalysis ...

  6. Hardware checks (3) CTDC distribution still larger after time-walk corrections (TAC , cables, ?)  needs to be investigated T3 T8 A (very) preliminaryanalysis ...

  7. The algorithm • TDC correction for time-walk (no position correction) • TL, TR by weighted average of Ti • <T> = (TL-TR)/2 i=r.m.s. of Ti cut on Qi> 5 pe A (very) preliminaryanalysis ...

  8. The result • Applied cuts: • Dr < 1cm(DT40ps) • 52<S1TDC<53 ns, 70<RFTDC<76 ns • Qsum>30000 ( E>50 MeV) • only 1000 events retained •  = 86 ps A (very) preliminaryanalysis ...

  9. Outlook • Need to investigate hardware problems (for present and future analyses) • Use of full analysis tools to obtain the overall timing resolution • Timing reference counter • Position reconstruction • DT vs E • Increase the statistics A (very) preliminaryanalysis ...