An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Eastern Shore, Districts 1 & 2 Communication Plans, Goals and Issues in 2016 Closures High Profile Red Flags DCL Lower Shore Mid Shore Upper Shore Smaller Projects Linked Slides Project Albums

  2. This presentation covers: • Eastern shore – D1 & D2 • General themes • High Profile Projects • Closures • Red Flags & Hot Spots • Task Force Meetings • DCL Plans in General • Major Projects by Region • Smaller Projects 15 sec 30 sec 1 min 1 min 2 min 15 sec 3 min 15 min 3 min Total: 26 min

  3. Eastern Shore – D1 & D2 Bordered by three states (DE, VA, PA) and consisting of nine counties, commonly divided into three regions: • Lower • Middle • Upper

  4. General Themes for 2016 Lower Shore • Major north-south routes impacted by concurrent long-term projects Mid-Shore • Beach & trucking routes, farming mobility are primary concerns Upper Shore • Geometrics/smaller, local-impact projects and non-SHA work dominate Lower Shore Mid Shore Upper Shore

  5. Anticipated High Public Profile • MD 404 dualization from US 50 to Denton • MD 304 interchange after stream work • MD 213 over Chester River • US 13 multiple bridges • US 113 dualization after clearing • MD 331 Dover Bridge beam sets and marsh lifts • US 50 Ocean City drawbridge spall repairs • US 301 at MD 290 and Red Lion Branch deck replacements • US 301 bypass in Middletown (DelDOT) • MD 213 C&D Canal bridge painting (ACE) Lower Shore Mid Shore Upper Shore

  6. Anticipated Closures • MD 404 over branch to Wye River • MD 349 over Windsor Creek • MD 54 over Mockingbird Creek • MD 304 west of US 301 • MD 213 over Chester River • US 13 Salisbury Bypass ramps (various) • MD 404 ALT in Hillsboro/Queen Anne • MD 281/Muddy Lane - ? • MD 222 over Rock Run Lower Shore Mid Shore Upper Shore

  7. Anticipated PR Red Flags & Hotspots Factors include location, public profile, impacts, volumes, politics, history • MD 404 dualization – beach traffic, farming • MD 272 Amtrak bridge – time/progress • MD 273 roundabouts – rural but w/commuters • US 50 Ocean City bridge repairs - visibility • MD 331 Dover Bridge – MOT during lifts and post-construction progress (quarantine) • MD 304 during closure and quarantines - progress • MD 222 Port Deposit drainage/sidewalk – tight area • MD 404ALT bridge replacement – local impact • MD 213 C&D Canal (ACE) – traffic • MD 213 over Chester River • US 301 Middletown Bypass (DelDOT) - proximity Lower Shore Mid Shore Upper Shore

  8. Task Force/Community Meetings • MD 33 in St. Michaels, CS&E • MD 16 in Church Creek, CS&E • MD 404 (farming community w/consultant) • MD 404 ALT in Hillsboro • MD 291 in Millington, CS&E • MD 213 over Chester River Lower Shore Mid Shore Upper Shore

  9. District Community Liaison General Plans & Goals • Attend at least half of all progress/partnering meetings • Support PEs and field operations as appropriate • Expand territorial knowledge particularly in southeast D2, western D1 and Ocean City • Establish and maintain XLS project task tracker • 2x per month participation in daytime community orgs, e.g., Rotary, Lions • Doc/presentation showing agricultural needs, haul routes and regulations • Explore use of MySitefor cloud storage/access/sharing • Amtrak safety certification • 1x per month minimum local access television Lower Shore Mid Shore Upper Shore

  10. Updates & Communication Plans Major Projects by Region For all projects assume elected official letters and social media as appropriate

  11. Updates & Communication Plans Lower Shore • Worcester, Wicomico, Somerset, (Dorchester) • Traffic Centers: • Ocean City, Salisbury • US 50, US 13, US 113, MD 528 • Two primary north-south routes – US 13 and US 113 – will feature major construction • MD 528 major resurfacing in Ocean City Lower Shore Mid Shore Upper Shore

  12. Updates & Communication Plans Lower Shore • US 13B Salisbury drainage • US 13 over Pocomoke River deck replace • US 113 dualization • US 13 Salisbury Bypass bridge rehabs • MD 16/Woods Rd roundabout • US 50 Ocean City drawbridge spall repairs • MD 528 Ocean City resurfacing • MD 349 over Windsor Creek • MD 54 over Mockingbird Creek Lower Shore Mid Shore Upper Shore

  13. Updates & Communication Plans Mid-Shore • Talbot, Caroline, Queen Anne’s, (Dorchester) • Traffic Centers: • Kent Island, Easton, Cambridge, Denton • US 50, MD 404, US 301 • Major beach and trucking routes impacted in 2016 Lower Shore Mid Shore Upper Shore

  14. Updates & Communication Plans Mid-Shore • MD 404 dualization current phase • MD 404 dualization US 50 to Denton • MD 404 Wye Mills pipe culvert • MD 331 Dover Bridge • MD 304 interchange • MD 404 ALT bridge replace and CS&E • US 301 over MD 290/Red Lion deck replace • MD 213 over Chester River Lower Shore Mid Shore Upper Shore

  15. Updates & Communication Plans Upper Shore • Kent, Cecil, (Queen Anne’s) • Traffic Centers: • Chestertown, Elkton, North East, Rising Sun • US 40, US 301, MD 213, I-95 • PA and DE influence, particularly with MD 273 work • Impacts from non-SHA projects Lower Shore Mid Shore Upper Shore

  16. Updates & Communication Plans Upper Shore • MD 273 at Appleton Rd roundabout • MD 273 at Blue Ball Rd roundabout • MD 281 at Muddy Ln roundabout • MD 272 at Tiger Dr geometric • MD 272 over Amtrak bridge replace • MD 222 Port Deposit drainage, CS&E • MD 213 over C&D Canal • US 301 Middletown bypass • MD 222 over Rock Run Lower Shore Mid Shore Upper Shore

  17. Areawides, shop work, DE funds, signals, sidewalks Smaller Projects Closures Red Flags High Profile DCL Lower Shore Mid Shore Upper Shore Linked Slides Project Albums

  18. Smaller Projects District 1 • AX091 – Harriett Tubman UGRR park and visitor center, DGS/DNR • TBD – MD 413 in Crisfield, resurface 1.55 miles • TBD – US 113 from DE line to north of MD 90, est. $3.8 million District 2 • CO276 – MD 315 over Marshyhope Creek lighting • CE393 – US 40 from MD 222 to MD 272, $7.1 million, Allan Myers • TBD – MD 222 sidewalks in Perryville, possible ICD project • CE291 – MD 272 sidewalks in North East, bid open 1/17/16 • CE339 – MD 272 geometrics in North East, ad 6/21/16

  19. 2016 Anything Else? Closures High Profile Red Flags DCL Lower Shore Mid Shore Upper Shore Smaller Projects Linked Slides Project Albums

  20. Linked Slides Closures High Profile Red Flags DCL Lower Shore Mid Shore Upper Shore Smaller Projects Linked Slides Project Albums

  21. Map – Lower Shore 5 US 13B Salisbury drainage US 13 over Pocomoke River deck replace US 113 dualization US 13 Salisbury Bypass bridge rehabs MD 16/Woods Rd roundabout US 50 Ocean City drawbridge spall repairs MD 528 Ocean City resurfacing MD 349 over Windsor Creek MD 54 over Mockingbird Creek 9 7 1 4 6 8 3 2 High Profile Lower Shore

  22. Map – Mid Shore 8 7 5 MD 404 dualization current phase MD 404 dualization US 50 to Denton MD 404 Wye Mills pipe culvert MD 331 Dover Bridge MD 304 interchange MD 404 ALT bridge replace and CS&E US 301 over MD 290/Red Lion deck replace MD 213 over Chester River 3 2 1 2 6 4 High Profile Mid Shore

  23. Map – Upper Shore 2 1 MD 273 at Appleton Rd roundabout MD 273 at Blue Ball Rd roundabout MD 281 at Muddy Ln roundabout MD 272 at Tiger Dr geometric MD 272 over Amtrak bridge replace MD 222 Port Deposit drainage, CS&E MD 213 over C&D Canal US 301 Middletown bypass MD 222 over Rock Run 4 9 3 6 5 7 8 Upper Shore High Profile

  24. US 13B Salisbury drainage WI328_52 D1 – Wicomico • Contract: • $5.4 million • 1170 WD • Daisy Concrete • Ongoing Salisbury drainage project • Current phase just finished difficult Newtown work and is on US 13B • Business impacts now • Partial shutdown – utilities redesign X Lower Shore

  25. US 13 over Pocomoke River WO223_51 D1 – Worcester • Contract: • $14.4 million • 396 WD • JB Fay • NB was bridge supposed to reopen in January • Superstructure issues causing delays • Possible spring completion X Lower Shore

  26. US 113 Dualization WO636_51 D1 – Worcester • Contract: • $32 million • 991 CD • Allan Myers • Latest phase centered on Newark, halfway between Berlin and Snow Hill • Clearing through winter • Consultant PR • Initial outreach done • Currently no traffic impacts X Lower Shore

  27. US 13 Salisbury Bypass WI214_51 D1 – Wicomico • Contract: • Design-Build • RFQ • Repairs to 11 structures at six locations along Bypass • Fall ‘16 start • Traffic impacts • Exact closures TBD • Major press, local broadcast, MCD, agencies X X X X X X Lower Shore

  28. MD 16 at Woods Road DO577_21 D1 – Dorchester • Contract: • TBD • New roundabout • School nearby • Seasonal volume on MD 16 • Regular local traffic on Woods Road 2017 X Lower Shore

  29. US 50 OC Bridge Repairs AX744A55 D1 – Wicomico • Contract: • TBD • Spall repairs possibly done with drawbridge work in ‘17 or ‘18? • Routine inspection and sounding turned into major spall cleanup • High visibility location invites public inquiry • No structural issues • Might combine spall repairs with drawbridge replacement X Lower Shore

  30. MD 528 Resurfacing in OC WO186_51 D1 – Worcester • Contract: • $3.4 million • Drop-dead 5/26/16 • George & Lynch • Single ad Fund 77 • DE line to 62nd Street, 4.5 miles X Lower Shore

  31. MD 349 over Windsor Creek WI226_21 D1 – Wicomico • Contract: • Ad late ‘15 • Prestressed concrete slab • Incentive/disincentive • Pipe culvert replacement • Fall ’16 start • Closure and detour (10+ weeks) coordinated with local fire/rescue • Impacts to farming, mail, school bus routes X Lower Shore

  32. MD 54 over Mockingbird Ck WI364_21 D1 – Wicomico • Contract: • Ad late ‘15 • Prestressed concrete slab • Incentive/disincentive • Fall ’16 start • Closure and (2) detours (10+ weeks) • Currently weight-restricted X Lower Shore

  33. MD 404 at MD 309 AW896_52 D2 – Queen Anne’s • Contract: • $18.2 million • 527 WD • Bramble • 1+ mile dualization centered more or less on MD 309 intersection • EB bridge done • WB bridge working through winter • On schedule but no acceleration X Mid Shore

  34. MD 404 US 50 to Denton AW896C21 D2 - Multiple • Governor’s top priority • Consultant leading initial outreach in conjunction w/design • Design-Build, two contracts covering east and west sections X X X X Mid Shore

  35. MD 404 Wye Mills Culvert TA316_51 D2 - Talbot • Contract: • $226,000 • 35 WD • Stream restrict Mar-Jun • Disincentive for closure • Pipe culvert replacement • Winter ’16? • Short closure • Easy local detour MD 662, US 50 • Possible minor impacts to farming, mail, school bus routes • Door-to-door, local press and agencies X Mid Shore

  36. MD 331 Dover Bridge TA392_52 D2 – Talbot/Caroline • Contract: • $48 million • 661 WD • McLean Contracting • On schedule • Significant traffic impacts during marsh lifts • Beam sets early 2016 • Safety concerns – ignoring flaggers X Mid Shore

  37. MD 304 Interchange QA265_51 D2 – Queen Anne’s • Contract: • $30.3 million • 645 WD • Bramble • New interchange • On schedule • Extensive stream work • “Coming out of the ground” in 2016 • Quarantine areas • MD 304 closure • Tidewater access • Lingering ROW X Mid Shore

  38. MD 404 ALT in Hillsboro CO558_21 D2 - Multiple • Contract: • TBD • CS&E through Hillsboro and Queen Anne • Major drainage work • Replace MD 404ALT bridge over Tuckahoe Creek • 2017 start? 2017 X Mid Shore

  39. US 301 over MD 290 & Red Lion Branch QA240_21 D2 – Queen Anne’s • Contract: • Ad late ‘15 • Northbound only • Half-and-half deck replacements • Both bridges at once = long single lane closure • Farming equipment moves through here • Clearance reduction issues on MD 290? X Mid Shore

  40. MD 213 over Chester River TBD D2 – Kent/QA • Contract: • TBD • Drawspan cleaning/painting • Five-week closure and detour • Regular task force meetings • No surprises by the time this starts • Business, agencies, door-to-door, major press, MCD X Mid Shore

  41. MD 273 at Appleton Road CE387_51 D2 - Cecil • Contract: • $1.9 million • 188 WD • Allan Myers • PLC • New roundabout • Late start • Some commuter and possible farming impacts • Leg-by-leg closures or restrictions? X Upper Shore

  42. MD 273 at Blue Ball Road CE386_51 D2 - Cecil • Contract: • TBD • Missed January ad? • Work start summer ‘16? • Access changes for some property owners • Outreach w/Appleton X Upper Shore

  43. MD 281 at Muddy Lane CE449_51 D2 - Cecil • Contract: • $2.7 million • 231 WD • Allan Myers • PLC • Late start • Lingering utilities • Possible MD 281 closure for major pipe crossing • ROW – golf course • Commuter impacts • Patriots Glen subdivision X ? Upper Shore

  44. MD 272 at Tiger Drive CE288_51 D2 - Cecil • Contract: • $1.8 million • 159 WD • Daisy Concrete • Convert existing mod-T to full color signal • Late start • Underway, clearing through early 2016 • Entrance to Rising Sun High School • Might be considered failure of mod-T X Upper Shore

  45. MD 272 over Amtrak CE446_51 D2 - Cecil • Contract: • $10.3 million • 482 WD • Mumford & Miller • PLC • Complete bridge replacement on adjacent alignment • Behind schedule • Redesign underway X Upper Shore

  46. MD 222 drainage CE448_21 D2 - Cecil • Contract: • TBD • Major drainage project in Port Deposit • Mill Street to River Drive • Substantial coordination among D2, town, railroad, CAC, etc. • Construction start early summer? X Upper Shore

  47. Army Corps of Engineers MD 213 over C&D Canal • Contract: • Corcon(Ohio) • 2x estimate, 1/6 est. MOT • Pedestrian rail cleaning/painting • Contractor “may” use temp signals • Expect local complaints • MD 213 corridor impact • Regional truck route • Spring work start? • TCP required – not yet submitted X Upper Shore

  48. US 301 Middletown bypass DelDOT • Contract: • DelDOT multiple • Major truck route • Construction start January 2016 • Three-year project • MD roads part of southern detour • Northern contract impacts C&D Canal traffic X X X X Upper Shore

  49. MD 222 over Rock Run CE351_21 D2 - Cecil • Contract: • $2.7 million • 265 CD • Prestressed concrete slab • Kimball Construction • Bridge replacement • Summer ’16? • Closure and detour w/incentive, disincentive • Ped traffic maintained • Coordinate w/ Port Deposit drainage project? X Upper Shore