1 / 5

AMON Reprocessing

AMON Reprocessing. Hybrid IGS05+IGS08. EPN Reference. Criteria : Long history Reliable TimeSeries Minimal gaps Geographical distribution. Other neighbour EPN stations added : GOPE, GSR1, MEDI, MOPI, TUBO, VACO. AMON Site Handling. Bernese Software 5.0 (BSW)

mandell
Télécharger la présentation

AMON Reprocessing

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. AMON Reprocessing Hybrid IGS05+IGS08

  2. EPN Reference Criteria: Long history ReliableTimeSeries Minimal gaps Geographicaldistribution Other neighbour EPN stationsadded: GOPE, GSR1, MEDI, MOPI, TUBO, VACO

  3. AMON Site Handling Bernese Software 5.0 (BSW) Orbits + ERP reprocessed IGS05 Reference coordinates + velocities IGS08 Using BEV logsheets Same strategyas in EPN analysis Daily results Weeklyresults separate run Startingwithyear 2006, back to 1998 – firstrun Keepingoldsitenames (e.g. TRFB insteadof TRF2) Problem ofantennaheightconsistencylogsheet – STA-file of BSW

  4. Detected Problems • Not yet all BEV logsheetsincludedinto STA-files – inconsistencies • Overlappingtimes in BEV logsheets (e.g. BLEI-BLE2) and different antennaheights • Individual antennacalibrations not alwaysapplied (dummyantennanumbers in STA-file, not 5 digits in RINEX files, semi-automaticpreprocessingneedsmanualinterferenceandisconsuming human time) • Not all problemsvanish (equipment, snow), somenewappear, same experienceas in EPN repro1 • Strange EPN site TUBO (constant 5-10 cm differenceto a priori IGS08)

  5. First Results • Processing time 1 day = 1 hour • StartingwithJanuary 1st 2006, presentlyabout 50 days • Total of 80 stations • About 5 stationswith large (>5 cm) differences, 3 EPN sites (JOZE-snow?, MOPI-snow?, TUBO?) • About 5 stationswith moderate (2 cm) differences, antennacalibrationorantenna type mismatch? • 70 stationscoincidewithin 10 mm into AMON solutionof 2011!!! • Significantlyimprovedsolution (height)

More Related