1 / 27

Week 5

Week 5. Struktur Geologi dalam Hidrogeologi (Geological structure in hydrogeology) ‏. Reference: Geological structures materials Weight & Sonderegger , 2007, Manual of Applied Field Hydrogeology, McGraw-Hill online books

marc
Télécharger la présentation

Week 5

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Week 5 Struktur Geologi dalam Hidrogeologi (Geological structure in hydrogeology)‏ Reference: Geological structures materials Weight & Sonderegger, 2007, Manual of Applied Field Hydrogeology, McGraw-Hill online books Mandel & Shiftan, 1981, Groundwater Resources: Investigation and Development, Academic Press

  2. Couse note for ITB student. Permission for other uses to Prof. Deny Juanda Puradimaja Struktur Geologi • Struktur primer: struktur yang terbentuk pada saat batuan terbentuk: • struktur perlapisan • kekar pendinginan: kekar kolom • foliasi (khusus pada metamorf) • Struktur sekunder: struktur yang terbentuk setelah batuan terbentuk, karena proses tektonik: • Lipatan • Sesar • Kekar

  3. Couse note for ITB student. Permission for other uses to Prof. Deny Juanda Puradimaja Beberapa studi kasus • Rekonstruksi aliran sungai bawah tanah Kali Bribin, Gunung Kidul (Puradimaja, D.J., Santoso, D., Lubis, R.F., 1993) • Pemetaan hidrogeologi gunungapi G. Ciremai, Kab. Kuningan (Puradimaja, D.J., Irawan, D.E, 2001) • Pemetaan hidrogeologi kawasan Padalarang (Puradimaja, D.J., tim asisten, 2003) • Relasi airtanah dan air Danau Aneuk Laot, Sabang (Puradimaja, D.J., Budidarma, D., 2004) • Analisis aliran airtanah multifase di Kawasan G. Kromong, Palimanan Puradimaja, D.J., Silaen, H., 2003) • Rekonstruksi aliran sungai bawah tanah di kawasan Buniayu, Kab. Sukabumi (Puradimaja, D.J., Priyono, I., 2005)

  4. Rekonstruksi Jaringan Sungai Bawah Tanah Studi Kasus : Kawasan Karst Daerah Buniayu,Kabupaten SukabumiJawa Barat

  5. Tujuan Penelitian • Merekonstruksi Jaringan Endokarst melalui pengukuran geofisika Metode Wenner – Schlumberger dan Metode mise A la masse • Memahami Sistem Akifer dan Aliran Airtanah pada akifer karst

  6. Gua Kerek Gua Cipicung Gua Siluman Pintu Gua

  7. Kolom Stratigrafi Daerah Penelitian (RAB Sukamto, 1975) Fokus Studi Penelitian

  8. Gua Kerek Gua Siluman Gua Cipicung

  9. Gua Siluman Gua Cipicung Gua Kerek

  10. Gua Kerek Gua Siluman Gua Cipicung

  11. Gua Kerek Gua Cipicung Gua Siluman

  12. Konfigurasi Metoda mise A la masse

  13. Penampang Geologi Jalur Gua Cipicung

  14. Hasil Pengukuran Metode Wenner – Schlumberger Line 1

  15. Hasil Pengukuran Metode Wenner – Schlumberger Line 2

  16. Hasil Pengukuran Metode Wenner – Schlumberger Line 3

  17. Hasil Pengukuran Metode Wenner – Schlumberger Line 4

  18. Hasil Pengukuran Metode Wenner – Schlumberger Line 5

  19. Hasil Pengukuran Metode Wenner – Schlumberger Line 6

  20. Hasil Pengukuran Metode Wenner – Schlumberger Line 7

  21. Hasil Pengukuran Metode Wenner – Schlumberger Line 8

  22. Contoh Hasil • Hasil pengukuran metoda langkah kompas, didapatkan dua buah jalur gua, yaitu jalur Gua Cipicung yang berarah N 30-40oE dan jalur Gua Siluman yang berarah N 320-330oE. Kedua jalur gua tersebut saling bertemu dan berakhir di Gua Kerek. • Hasil pengukuran metoda Wenner-Schlumberger yang dalam interpretasi menggunakan hasil tes laboratorium, dinyatakan dengan posisi dan diameter gua, yaitu : • Bentangan-1 (775 mapl, tidak terdeteksi adanya rongga), • Bentangan-2 (776 mapl, tidak terdeteksi adanya rongga), • Bentangan-3 (777 mapl, 20 m x 10 m), • Bentangan-4 (775 mapl, 42 m x 15 m), • Bentangan-5 (774 mapl, 55 m x 10 m), • Bentangan-6 (775 mapl, 25 m x 15 m), • Bentangan-7 (774 mapl, 6 m x 3 m), • Bentangan-8 (775 mapl, 50 m x 5 m).

  23. Contoh Hasil • Hasil metoda mise A’la masse menghasilkan bahwa di dasar lorong Gua Cipicung (total 640 meter, seluruhnya berair), sedangkan di lorong Gua Siluman (total 600 meter, air mengalir hanya sepanjang 100 m dari mulut gua bagian Selatan). Pada bagian lainnya kering dan air menghilang masuk melalui rongga-rongga kecil dan rekahan di bagian dasar Gua Siluman.

More Related