NSPCL O&M MEET-2019

NSPCL O&M MEET-2019. INSTALLATION OF MOTOR PROTECTION RELAY:- A CASE STUDY ON PERFORMANCE IMPROVEMENT & FAULT DIAGNOSIS. Samriddhi Singh Manager Electrical Maintenance NSPCL Rourkela. SINGLE LINE DIAGRAM AHP MCC. Supply from SSS-B. Supply from SSS-A. ASH HANDLING MCC-1. Incomer-2.

markmorrell
Télécharger la présentation

NSPCL O&M MEET-2019

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. NSPCL O&M MEET-2019 INSTALLATION OF MOTOR PROTECTION RELAY:- A CASE STUDY ON PERFORMANCE IMPROVEMENT & FAULT DIAGNOSIS Samriddhi Singh Manager Electrical Maintenance NSPCL Rourkela

  2. SINGLE LINE DIAGRAM AHP MCC Supply from SSS-B Supply from SSS-A ASH HANDLING MCC-1 Incomer-2 Incomer-1 Bus Coupler Series-1 Series-4 Series-6 Series-2 Series-3 Series-5 Supply from U#1 USS Supply from U#2 USS ASH HANDLING MCC-2 Incomer-2 Incomer-1 Bus Coupler FAWP-1 BAWP-4 FAWP-6 FAWP-2 BAWP-3 FAWP-5

  3. SINGLE LINE DIAGRAM CT MCC CW TRF-A 6.6KV/415V CW TRF-B 6.6KV/415V Supply from CWPCC Sec-2 Supply from CWPCC Sec-1 Incomer-2 Incomer-1 Bus Coupler CTVF-5 CTVF-1 CTVF-2 CTVF-3 CTVF-4 CTVF-6 CTVF-7 CTVF-8 CT MCC-1 & 2

  4. PROBLEM • Motor NTS • Motor burnt and smell observed. • Motor tripped while running. • Smoke observed from MTB. • Flashover occurred in module • Power fuse blown. 70 such incidents in past 3 years from 2016-2018 making an average of around 23 incidents per year.

  5. ...AND THE BIGGEST PROBLEM Supply from SSS-A Supply from SSS-B INCOMER TRIPS...... ASH HANDLING MCC-1 Incomer-2 Incomer-1 Bus Coupler Series-1 Series-4 Series-6 Series-2 Series-3 Series-5 COOLING TOWER MCC Incomer-2 Incomer-1 Bus Coupler CT-1 CT-2 CT-3 CT-4 CT-5 CT-6 CT-7 CT-8 RISK OF UNIT TRIPPING.....

  6. Situation after tripping • Operation-parameters control,systemrevival, valve operation etc. • Maintenance-Accurate fault diagnosis , flashover, motor replacement and rewinding etc. • MTP person was also not in peace.

  7. REASON Only Protections available :- • Power Fuse • Thermal Overload Relay During Earth Fault /Single Phasing???........

  8. SOLUTION MOTOR PROTECTION RELAY PROCUREMENT:- • Inst. overcurrent protection • Thermal overload protection • Phase reversal • Current Unbalance • Earth Fault • Stall rotor • Locked Rotor • Phase loss protection.

  9. Drives Covered..... • Ash series pumps-Lower & upper deck • Fly ash water pumps • Cooling Tower fans • Seal air blower • Fire fighting pumps • Belt conveyors

  10. CHALLENGES DURING INSTALLATION Space constraint.

  11. CHALLENGES DURING INSTALLATION • Very limited period shutdown. • Modifications in control circuit wiring and bus bar. • Relay testing and setting at lab • Ensuring utmost safety.

  12. THE FINAL PICTURE.... 54 numbers of numerical relays in 2 months

  13. THE COST ECONOMICS.... L&T switchgear spare procurement- Rs. 10 Lakhs. Cost of one ash handling motor-Rs. 6 Lakhs(approx) Cost of rewinding one motor- Rs 0.5 Lakhs(approx) P PO NO. 4100003176 Dt. 02.02.2018 Supply of Relay,Current transformer & Retrofitting charges – Rs. 7,87,500/-

  14. ADVANTAGES • No. Of incidents. • Savings in procurement of spares. • Accurate fault diagnosis. • Ease of operation. • Reliability and availability.

  15. Core Values • Safety and Environment Sustainability. • Performance. • Integrity. • Respect and Trust. • Innovation and Excellence. • Team Work