What do we need to get measure 1 GW of RF as quickly as possible?

What do we need to get measure 1 GW of RF as quickly as possible?. Develop a detailed plan Re-establish weekly open-meetings. What structure give us the best chance to get to 1 GW??. 26GHz Stage I DWPE a=3.5mm; b=4.53mm; eps=6.64; L=30cm. 75MeV drive beam 16 bunches x 60nC/per bunch

marlo
Télécharger la présentation

What do we need to get measure 1 GW of RF as quickly as possible?

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. What do we need to get measure 1 GW of RF as quickly as possible? Develop a detailed plan Re-establish weekly open-meetings.

  2. What structure give us the best chance to get to 1 GW?? 26GHz Stage I DWPE a=3.5mm; b=4.53mm; eps=6.64; L=30cm • 75MeV drive beam • 16 bunches x 60nC/per bunch • z=2mm 65MeV drive beam (10MeV loss) • RF Power Generation • 767MW x15ns • 26GHz rf 26GHz Stage II DLA a=3mm; b=5.03mm; eps=9.7; Vg=11%c; L=30cm witness (10 MeV) Q=1nC, z=1mm, e=1.5 um witness (85 MeV) Ez = 250MV/m Others: Iris-loaded 11.7 GHz, CLIC PETS, ??

  3. TASKS for 11.7 GHz struct (400 MW) • Chiller Test Linac 1&2 with new 5MW load. • Receive and install 5MW load on Klystron 3. • Multisplitter alignment for 16 beams, 32 beams • AWA Cooling System Test (repair?) • High Q Trains at 19 MeV (into gate valve?) {Q bunch = 20nC, 40 nC, 60 nC x 8, 16, 32} • Simultaneous RF into all 6 cavities with GV closed • Unlock gate valve (Administrative) • Diagnostic Beamline vacuum installation • Install cameras • Wire power supplies • etc