Concurrent Engineering & Project Management

MSE 401 Group #1 James Hunter Kevin Manocheri Seokki Lee Meshal Alansari Khaled Alturkey Naif Alolaiwi. Concurrent Engineering & Project Management. Presentation Outline:. What is Concurrent Engineering What is Project Management WalMart's Implementation of CE Boeing

Télécharger la présentation

Concurrent Engineering & Project Management

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MSE 401 Group #1 James Hunter Kevin Manocheri Seokki Lee MeshalAlansari Khaled Alturkey Naif Alolaiwi Concurrent Engineering &Project Management

  2. Presentation Outline: • What is Concurrent Engineering • What is Project Management • WalMart's Implementation of CE • Boeing • Conclusion James Hunter

  3. What is Concurrent Engineering: • Concurrent Engineering (CE) is a systematic approach to integrated product development that emphasizes the response to customer expectations. It embodies team values of co-operation, trust and sharing in such a manner that decision making is by consensus, involving all perspectives in parallel, from the beginning of the product life cycle. (http://en.wikipedia.org/wiki/Concurrent_Engineering) James Hunter

  4. What is Concurrent Engineering: • CE is also known as Simultaneous Engineering or Integrated Product Development • CE is relatively new (Last 25 years) • Institute for Defense Analysis (IDA) • Replaces tradition “Waterfall” method • CE was designed to for the Product Development Stage • Optimizes engineering design cycles • CE is a long term Strategy • Any successful organization, now, must implement Concurrent Engineering. • Most apparent in the Aerospace Industry James Hunter

  5. What is Concurrent Engineering: Advantaged and Disadvantages: • Advantages : • Integrated Project Management (IPM) • Integrated Project Teams (IPT) • Optimizes Engineering Design Cycles • Information Sharing • Reduces Costs (Long Term) • Maximized Quality (200%-600%) • Reduces Development Time (30%-70%) • Reduces Design Rework (65%-90%) • Disadvantages/Challenges • Large Upfront Investment • Implementation of Early Design Reviews • Dependency on Efficient Communication • Software Compatibility • Need for Computer Modeling • Organizational and Cultural Changes (Anchor draggers) James Hunter

  6. What is Project Management: • Project management is the discipline of planning, organizing, securing, managing, leading, and controlling resources to achieve specific goals. • A project is a temporary endeavor with a defined beginning and end (usually time-constrained, and often constrained by funding or deliverables), undertaken to meet unique goals and objectives, typically to bring about beneficial change or added value. Kevin Manocheri

  7. Project Management Overview: • In 1950’s Project management initiated on the construction and defense project when there was more need for it. • Henry Gantt and Henri Fayol are known as the fathers of project management. Gantt for creating scheduling and Fayol for introducing the 5 concepts of managerial functions. • Project management is a technique to control the time, cost, quality and overall scope of the project. • Key metrics of project management are time cost, performance objective. • Project management’s most usable tools are Gantt chart, PERT, (program, evaluation review technique), CPM (critical path method), risk Management, and network Diagram. Kevin Manocheri

  8. Tools Used for PM and CE: • CPM/PERT • Work Breakdown Structure (WBS) • Organization Assessment IOM Check List • Gantt Chart Kevin Manocheri

  9. What is Project Management: Advantaged & Disadvantages: • Advantages : • Better efficiency in delivering services • Improved and enhanced customer satisfaction • Improved growth and development within the team • Greater competitive edge • Better flexibility • Increased risk assessment • Provides a plan to follow • Disadvantage: • If it’s implemented correctly there is no disadvantage. Kevin Manocheri

  10. Concurrent Engineering & Project Management Relation. • With out descent project management concurrent engineering would not be applicable. • Project Management is a Derivative of CE. • Need PM to implement CE successfully. Kevin Manocheri

  11. Case Study 1: WalMart • Founded year : 1962 • Founder : Sam Walton • World`s third largest corporation by Fortune 500 • Largest retailer in the world • Over 2 million employees • Success in most countries • Unsuccessful in South Korea SeokkiLee

  12. Case Study 1: WalMart SeokkiLee

  13. Case Study 1: Walmart (Walmart) (E-mart) SeokkiLee

  14. Boeing Company Case Study James Hunter

  15. Successful CE Case Study Overview • NPD project was executed using the CE implementations: • Boeing’s 777 project Meshal Alansari

  16. Successful Case Study Overview Boeing Commercial Aircraft Division - 777 Project: • New technologies: • digital avionics • advanced lightweight materials • dual-engine • two pilot design (%25 less cost per seat-mile) • replacement for 747 family • $4-5 billion to launch first member of 777 family Meshal Alansari

  17. Successful Case Study Overview • Teams provide the primary integration mechanism in CE projects. • Three types of teams appeared in the project: • Program management team • Technical team • Numerous design-build team Meshal Alansari

  18. Communication Among Teams • Communicating methods included: • Face to face communication • Phone conversation • Document • Electronic mail • Based on the project focus, a certain way of communication used: • Project focusing on design quality relied on formal personation and periodic review meetings • Project emphasizing development speed required frequent informal communication Meshal Alansari

  19. Case Study Methodology The selected firm included in the study: • Had substantial experience in NPD • Were developing relatively complex products • Used concurrent engineering methods • Operated in highly competitive markets • Collectively represented a diversity of product and market needs Meshal Alansari

  20. Case Study Methodology The study used a questionnaire containing 29 open-ended questions addressed: • Motivations, risks, and competitive pressures surrounding the project • Product complexity and technologies • Project scheduling and concurrency • Team personnel, organization, incentives, and authority; • Definitions, motivations, and benefits of CE • Functional interactions and communication modes; • Methods and tools used to promote CE • Barriers and keys to success Naif Alolaiwi

  21. Challenges in NPD Projects • Program Priorities: • Design Quality • Product Cost • Product Introduction speed • Project Characteristics: • Project Complexity • Innovation • Technical Risk Naif Alolaiwi

  22. Program Priorities Design Quality • 777 project: • Has 500 suppliers • Need 3,000,000 parts • Has 1700 computer workstation (220 of them in Japan) • New aircraft must prove reliability with at least 2 years to be FAA approved Naif Alolaiwi

  23. Program Priorities Product Cost • Boeing faced significant product cost challenges on the 777 project due to stiff competition from Airbus and the deregulation of the airline industry. Naif Alolaiwi

  24. Project Characteristics Project Complexity • 777 project: • 7000 people located in countries throughout the world • Boeing placed tremendous emphasis on communication to minimize risks Khaled Alturkey

  25. Benefits CE Implementation • Some of the companies documented savings in overall product development costs of approximately 20% and reductions in engineering design changes of 4.5%-50%. Khaled Alturkey

  26. Summary of CE Practices • At least 3 opportunities exist for concurrent processing: • Simultaneously developing market concept, product designs, manufacturing process, product structures • Overlapping design disciplines so that system level and component level designs are produced concurrently • Overlapping of separate but related new products requiring coordination between NPD programs Khaled Alturkey

  27. Summary of CE Practices • As degrees of overlap among activities become more intense, decisions that are dependent on information from upstream processes become more uncertain (more risk) • Successful CE implementation approaches differ depending on factors such as: • Product characteristics • Customer needs • Technology requirements Khaled Alturkey

  28. Summary of CE Practices • Teams are essential organizational forms for promoting integration • Team arrangements include: program management team, technical team, design-build teams, integration teams, and task forces • The modes, frequency, richness, and formality of communications among project participants varies according to information complexity, design, and timing challenges Khaled Alturkey

  29. Conclusion: • Project Management is needed to implement Concurrent Engineering correctly. • Need Concurrent Engineering to be competitive today. • Project Management is a part of Concurrent Engineering • Generally benefits are greater than the disadvantages James Hunter

  30. Questions & Answers