An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MICE Phase 1 • Koji Yoshimura • KEK • June 22,2005 @NuFACT05

  2. “MICE Project gets the green light”-CERN Courier-

  3. Outline • MICE Step and Phase • Motivation of Phase I • R&D activities for implementation of Phase I

  4. MICE Step and Phase Phase is budgetary condition Phase I Phase II 4

  5. - Motivation of Phase I • Step I • Beam tuning • Tuning up of PID and Beam counter • Step II • Various systematic study on tracker • Calibration of spectrometer • Step III • Systematic calibration of emittance measurement μ STEP I: spring 2007 STEP II: summer 2007 STEP III: winter 2008 Reference of later step

  6. Implementation for Phase I • Beam line & Shielding • PID • TOF • CKOV • MUCAL • Spectrometer • SciFi Tracker • Spectrometer Solenoid • DAQ • Software

  7. MICE Beamline

  8. PID Detectors

  9. SciFi Tracker • Add one more station to 3 station (FNAL, IC) • Close to final design and manufacture • Connectors • Assembling • Vacuum tight patch conncetors • Outer cylinder made of carbon fiber (Liverpool) • New wave guide system (Osaka)

  10. VLPC readout system • 2 slots VLPC cryostat has been successfully commissioned. (Great Effort by Russ and Alan) • Temperatures are as expected by Russ. • Newly-developed readout board (AFEII) has been tested • Recently success in taking data

  11. KEK Test • Final check before manufacturing real tracker • Performance check w/ B field (1 Tesla) and beam • Various systematic study of the tracker

  12. Series of tests KEK Step 0 • Adopting staging approach? • Feb, 2005TOF and ACC test w/o • Performance of single counter • May, 2005 TOF and ACC test w/Bfiled (final layout) • Test PID and beam counters w/ magnetic field • Performance of TOF hodoscope • Aerogel w/ • Monitor beam under the condition of Step II • VME DAQ system • Participants from UK • International collaboration • Aug, 2005Cosmic-ray test at FNAL/KEK • Sep, 2005SciFi tracker test KEK Step I KEK Step II

  13. Preliminary Results e μ π 0.425 GeV/c

  14. VLPC backplane VME BUS 6U DAQ System for KEK beam test Linux PC AFE II (L) 8x64 ch PCI-VME (SBS Bit3) VLPC Cassette #1 1553 Slow Control 1024 ch AFE II (R) 8x64 ch SASeq #1 Trigger Control 8x64 ch AFE II (L) SASeq #2 VLPC Cassette #2 1024 ch AFE II (R) 4 8x64 ch VLSB #1 VLPC Cryostat 4 VLSB #2 4 Serialized ADC DATA VLSB #3 4 Linux PC VLSB #4 CAMAC ADC/TDC VME LVDS SERDES Buffer (VLSB)

  15. Summary • There are no show stoppers towards MICE PHase I. • Magnet delivery date? • MICE first data will come April, 2007 • Still lot of Task to do within limited time • 282 + 365 = 647 days left