1 / 37

Surveillance and Broadcast Services

Surveillance and Broadcast Services. Merging and Spacing Enabling Continuous Descent Arrivals – An Update. ASAS-TN 2.5: Towards an ASAS-Global Network: Next Steps Rome, Italy. 12 – 13 November 2008. Wes Stoops and Randall Bone. November 12, 2008. Outline. Merging and Spacing (M&S) Overview

mcadory
Télécharger la présentation

Surveillance and Broadcast Services

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Surveillance and Broadcast Services Merging and Spacing Enabling Continuous Descent Arrivals – An Update ASAS-TN 2.5: Towards an ASAS-Global Network: Next Steps Rome, Italy. 12 – 13 November 2008 Wes Stoops and Randall Bone November 12, 2008

  2. Outline • Merging and Spacing (M&S) Overview • UPS Flight Deck Operations • ATC Operations • Next Steps

  3. M&S Overview

  4. M&S Concept Departure Terminal En route Terminal Landing A  A A A   Arrival procedure Approach      A B B B   B A   B Air to ground FDMS (air to air)  B B AOC – Airline Operations Center ATC – Air Traffic Control FDMS – Flight Deck-Based Merging and Spacing

  5. UPS FDMS Initial Implementation • Time-based airborne spacing application • AOC uplinks FDMS initiation message • Flight crew follows on-board speed advisories • Speed only used to achieve spacing • En route and terminal • Instrument Flight Rules (IFR) (instrument or visual meteorological conditions) under surveillance • Predominately single airline arriving to an airport via one merge fix, one arrival (e.g., Continuous Descent Arrival (CDA)), and one approach to one runway

  6. Expected Benefits • Consistent, low variance spacing between paired aircraft at the entry to an arrival procedure (e.g., CDA) and on final approach • Continued CDA operations in medium density environments • CDA benefits seen by UPS • 30% reduction in noise (up to 6 dB) • 34% reduction in nitrous oxide (NOx) emissions • Below 3000 feet • 250 to 465 pounds less fuel burn per flight • Ground-based M&S expected to allow CDAs when demand <=70%. FDMS could increase

  7. Current Implementation Status (1 of 4) • UPS has company-specific CDAs in place

  8. Current Implementation Status (2 of 4) • UPS has five Boeing 757 aircraft equipped with Aviation Communication & Surveillance Systems (ACSS) Cockpit Display of Traffic Information (CDTI) hosted on class III Electronic Flight Bag (EFB) for FDMS and new display (ADS-B Guidance Display) • Co-space derived algorithm • UPS Boeing 767 are certified but not yet operationally approved for FDMS • UPS has the 107 of it’s Boeing 757 and 767 aircraft transmitting ADS-B

  9. Current Implementation Status (3 of 4) • UPS conducting FDMS about once a week due to limited number of aircraft and limited number of trained pilots (since Jan 2008) • US West Coast arrivals • Late night operations • 40+ two-ship flights • 1 three-ship flight • 757 spacing off 767 (5 nautical mile terminal separation required) • Assigned interval of 145 seconds yielding ~ 5.80 nautical mile final spacing (@150 knots)

  10. Current Implementation Status (4 of 4) • Data collection • On-going baseline and FDMS data collection • Ground-based M&S under-going testing and development • Strategic sequencing and spacing for CDAs and FDMS • Believed necessary for appropriate set-up to FDMS • Testing of near-term / AOC implementation • Concept development of longer-term ATC implementation

  11. UPS Flight Deck Operations

  12. UPS FDMS Equipment AGD ACARS EFB / CDTI

  13. UPS Operation - Domain

  14. UPS Operation – Initiation • Daily coordination with UPS and the associated ATC facilities • Message send via datalink (ACARS) from GOC • Traffic To Follow (TTF) • Interval (in seconds) • Common merge fix

  15. UPS Operation – Set-Up • Message send via datalink (Aircraft Communications Addressing and Reporting System (ACARS)) from Global Operations Center (GOC)

  16. UPS Operation – Set-Up Menu 145

  17. UPS Operation - Conduct • Communicate with ATC on initiation and when checking in to each new frequency “…Company Spacing…” • Follow speed commands to merge fix through CDA and instrument approach • 15 knot or greater speed changes

  18. TFC MSG TGT DIST DIFF GS CMD SPD 9.9 235

  19. UPS Operation - Termination • No communication required if terminating at normal point of 1500 Above Ground Level (AGL)

  20. UPS Operation – Initial Impressions • Initiation method (datalink) acceptable • Flight crews following appropriate phraseology and it appears to be sufficient • Non-normal situations are sufficiently resolved • Visual approach and visual separation issuance during final portions of the arrival if spacing issue • Current flight crew coordination procedures are sufficient • CDTI is a useful tool • Need more data on spacing performance

  21. ATC Operations

  22. ATC Operations (SDF) • Hours of operations – 0100 to 0400 local time • West Coast arrivals (16 aircraft) • 4 CDAs

  23. ATC Operations – Aircraft Routes

  24. ATC Operations (SDF) - CDAs *NOTE- CDA’s can be conducted without FDMS. The Requirements Focus Group (RFG) is currently discussing FDMS applications beyond CDA’s.

  25. ATC Operations - (SDF)

  26. ATC Operations (SDF)

  27. ATC Operations (SDF)

  28. ATC Operations (SDF) Restricted Area

  29. ATC Operations (SDF)

  30. ATC Operations – Initial Impressions (1 of 2) • En Route • Minimal to no effect • Terminal • Blending FDMS and non-FDMS aircraft • IMC weather adds to the complexity • Vertical profile of CDA is higher and must be factored into future airspace design

  31. ATC Operations – Initial Impressions (2 of 2) • ATC Benefits - Reduced Workload • Flight crews manage spacing interval • ATC monitors interval to ensure separation • Traditional handling- 8 to10 transmissions • FDMS handling- 4 to 5 transmissions • Consistent Aircraft Performance

  32. Next Steps

  33. Next Steps (1 of 2) • UPS waiting on Boeing 767 operational approval for FDMS • Examine whether 15 knot quantization is too coarse • Temporary hold on weekly operations due to UPS busy period prior to winter holidays • Continued testing of ground-based M&S • Field test event following 767 operational approval and ground-based M&S tool maturation • Report out on results and provide feedback to RFG, etc.

  34. Next Steps (2 of 2) • Work completed on concept and safety will be used as input to RFG during development of Sequencing and Merging (S&M) • S&M covers the initial implementation of FDMS • Move beyond the initial, interim UPS and SDF only implementation • Other airlines, other locations, and more complex environments • Continue to develop benefits case • Define next implementation of ground-based and flight deck-based M&S

More Related