1 / 21

Lower Rio Grande Regional Water Plan Presentation

Lower Rio Grande Regional Water Plan Presentation. Prepared by: Terracon Livingston & Associates John Shomaker & Associates Zia Engineering & Environmental Sites Southwest. Presentation Outline. What is the Lower Rio Grande Regional Water Plan & Why is it Important?

medea
Télécharger la présentation

Lower Rio Grande Regional Water Plan Presentation

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Lower Rio Grande Regional Water Plan Presentation Prepared by: Terracon Livingston & Associates John Shomaker & Associates Zia Engineering & Environmental Sites Southwest

  2. Presentation Outline • What is the Lower Rio Grande Regional Water Plan & Why is it Important? • Background of NM Regional Planning Efforts • Planning Region • Regional Water Plan Approach / Scope • Water Supply • Surface Water • Groundwater • Water Demand • Current Use • Projected Use • Water Plan Alternatives • Public Involvement / Outreach • Develop Water Master Plan Document • The Lower Rio Grande Water Plan and You

  3. What is the Lower Rio Grande Regional Water Plan? • The Lower Rio Grande Regional Water Plan is a plan to assess and quantify the water resources available to the Planning Region • This includes analysis of the surface and groundwater supply, demographic analysis, population projections to 2040, current water demand, projected water demand, and strategies for future management of the Planning Region's water

  4. Why is the Lower Rio Grande Regional Water Plan Important? • Can be used as a water resource planning tool and reference document • May have important implications for legal decisions • Maintain our agricultural heritage • Preserve the environment • Identify sustainable water supplies • Plan for drought

  5. The original impetus for regional water planning came in 1987 when a federal court ruled that New Mexico's prohibition against out-of-state transfer of New Mexico groundwater was unconstitutional • Regional water plans that were done in the past followed a diversity of approaches and used a variety of different assumptions to produce projections of water use • As has been done in other western states, New Mexico is developing a State water plan • The ISC appointed a subcommittee and volunteer work group well versed in water management issues to develop the template to guide the development of regional water plans. • Although a water plan for the region was completed in 1994, this plan does not contain all of the information required by the Water Planning Template. Background of NM Regional Planning Efforts

  6. Study Area The study area is chiefly comprised of the area within Dona Ana County, excluding portions of the Tularosa and Mimbres Basins within in the County. The study area also includes the portion of Sierra County within the boundaries of the Elephant Butte Irrigation District and the portion of the Hueco Bolson within Otero County.

  7. Contract Tasks • Water Supply Study • Surface Water • Groundwater • Water Demand Study • Current and Historic Use • Projected Use • Water Budget • Water Plan Alternatives • Public Involvement/Outreach • Develop Regional Water Plan Document Planning Template • Executive Summary • Introduction • Public Involvement • Strategies to Maximize Public Involvement • Background Information • Description of Region • Historical Overview • Legal Issues • Water Resources Assessment • Water Supply • Water Quality • Water Demand • Present uses • Future Uses (40 years) • Water Conservation • Alternatives Regional Water Plan Approach/Scope

  8. Caballo Release ET Precip Conveyance System Diversion Bypass (spill) Delivery Irrigated Land ET Precip Atmosphere Rio Grande Pumping Deep Percolation Seepage Imported Water Exported Water Groundwater Seepage Exfiltration M&I Users Bypass (spill) Pumping Drainage Deep Perc. Drain Flows Discharges Return Pumping Deep Percolation ET Precip Non-irrigated Land Storm Flow Rio Grande at El Paso District Hydrology

  9. Regional Water Plan Water Supply - Surface Water • Historical Weather Data • Relying on existing records of the National Weather Service and NM State Climatological Office • In most instances, there are consistent records dating back to the mid-1940’s for the area • Inventory of Existing Conditions • Physical drainage basins - general surface hydrologic description of the planning area • Flow from ungauged streams - no other perennial streams, flow from all intermittent systems are captured by existing gauge networks • Stream gauge locations - USGS, EBID • Water quality impacts - minor impacts from agricultural and domestic sources. Results to date have not exceeded regulatory levels • Stream connected groundwater - significant ties between Rio Grande system (and irrigated lands) and groundwater supplies

  10. Reservoir Diversion Rio Grande River/Diversion Drains Laterals Main Canals Deliveries Conveyance/Distribution Farm Delivery/Irrigation Return Flows Irrigation Hydrologic Cycle: Plan View Downstream Users

  11. Diversion/Conveyance Crop Water Use Irrigation Canal Field Drain Seepage Rio Grande Drainage Return Flow Well Groundwater Irrigation Hydrologic Cycle: Profile

  12. Regional Water Plan Water Supply Groundwater • There are four major groundwater basins in the Planning Region: • Mesilla and Rincon Basins • Important basins for economic development • Pumping is at the expense of the Rio Grande surface water flow • Recharge to the basins is via seepage from the Rio Grande and irrigation canals • Jornada del Muerto • Recharge is from mountain rainfall, subsurface groundwater flow and geothermal upwellings • Hueco Bolson • Only 3 percent is actually in New Mexico • Recharge is from the Tularosa Basin, mountain front recharge and minor amounts from the Mesilla Basin

  13. Regional Water Plan Water Demand Current Use • Industrial • Mining • Power • Reservoir Evaporation • Fish, Wildlife & Recreation • Demand By Category • Public Utilities • Domestic • Irrigation/Agriculture • Livestock • Commercial • Currently, there is no domestic or public utilities reliance on surface supplies • There are approximately 78 Mutual Domestic and Municipal Water Supply Systems within the Plan area. The number of people served by each systems ranges from 23 people to more than 80,000 • Irrigation/Agriculture use accounts for approximately 90% of the total current usage • Irrigated lands - while acreages have shown slight decreases, water demand has remained constant and in some instances, has increased due to high demand crops and multiple cropping during the year

  14. 2000 census data was used for the demand projections • Future demand analysis reflect use categories described earlier • A base assumption in development of the plan is that there will be no new water supplies and the current and future water resource is finite and limited Regional Water Plan Water Demand Future Use • Major future changes in use within the region are anticipated to reflect a shift for municipal usage from full reliance on groundwater to partial reliance on surface water as populations expand and groundwater reserves are depleted • As there becomes a need to rely upon surface water, drought impacts will become a significant concern. Therefore, contingency planning for drought periods is necessary

  15. Regional Water Plan Alternatives • Identify alternatives to meeting current and future demands • Alternatives are to address: • Management • Conservation • Water Development (no new sources are assumed) • Infrastructure Development • Water Quality Management • Alternatives are to be compared based on: • Technical Feasibility • Political Feasibility • Social and Cultural Impacts • Financial Feasibility • Implementation Schedule • Physical, Hydrologic and Environmental Impacts.

  16. Regional Water Plan Potential Alternatives • Water Shed Management • De-salination • Underground Aquifer Storage and Recovery (ASR) • Reclaimed Water/ Re-use • Residential/ Commercial Water Conservation • Agriculture Conservation (EBID suggestions) • Installation of canal liners • Control of weeds in conveyance structures • Land leveling/ optimum tillage • Select/ Improve proper irrigation application measures • Surface Water Capture • Development of Deep Groundwater Supplies • Importation of Water • Use of surface water to meet human consumptive use requirements coupled with aggressive conservation and re-use strategies • Leasing of Agricultural Water to Municipal & Industrial Use

  17. Tentative Structure for Transfers of Water to Special Water Users Associations Total Allotment Leases: Negotiated Price Agricultural Users SWUA Agricultural Water Used Municipal Water (SWTP) Transfer Process: Agricultural Pool Municipal Pool

  18. Regional Water Plan Conservation • Education and Awareness Training • Water is valuable • Low rainfall in the region • Depletion of potable water resources • Water Conservation Ordinances • Odd/ even water schedules • No water allowed to run continuously • Leaks must be repaired within five (5) days • Landscape Ordinance • Using recommended plants for the Planning Region • Promotion of underground irrigation systems • Rate Structure • Adopt a conservation-oriented waste structure • Increasing block rate for residential customers

  19. Public Involvement / Outreach • Intent • Increase public awareness of the Regional Water Plan • Involve local citizens and groups as stakeholders in the planning process • Ensure consideration of all points of view • Approach • Public Involvement Plan • Lower Rio Grande Water Users Organization (LRGWUO) - Technical Advisory Group/ Steering Committee • Public Outreach • Documentation and Incorporation of Input • Public Meeting Notes • Public Hearing Transcripts • Input summaries into key word database • Plan revisions to reflect input from Public Meetings

  20. zia consultants, Inc. engineering & environmental Regional Water Plan

  21. The Lower Rio Grande Regional Water Plan and You! • Why should I get involved? • Water is our most important resource • The LRGWUO depends on your ideas to develop a plan that truly takes into account the interests of all Planning Region residents • There are a number of ways to get involved in the project: • Participate in public meetings • Call our toll-free: 1-866-DAC-PLAN (322-7526) or in Las Cruces call 527-1041, ask for Mary Wells (mewells@terracon.com) • Review the draft and final plans at selected public buildings • Web site @ www.lrgwuo-waterplan.com

More Related