1 / 13

Performance Management: Getting Ready for Accreditation Needs Assessment Survey

Performance Management: Getting Ready for Accreditation Needs Assessment Survey. Online survey Open to anyone interested in this workshop Requested 1 respondent per LHD 52 responses Based on Turning Point PM assessment 6 questions – 5 ranking, 1 open ended.

Télécharger la présentation

Performance Management: Getting Ready for Accreditation Needs Assessment Survey

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Performance Management: Getting Ready for AccreditationNeeds Assessment Survey • Online survey • Open to anyone interested in this workshop • Requested 1 respondent per LHD • 52 responses • Based on Turning Point PM assessment • 6 questions – 5 ranking, 1 open ended Community Assessment

  2. Q1. HD Overall readiness/accountability to implement PM system

  3. Q1. HD Overall readiness/accountability to implement PM system

  4. Q2. Current status regarding PERFORMANCESTANDARDS as component of PM system

  5. Q2. Current status regarding PERFORMANCESTANDARDS as component of PM system

  6. Q2. Current status regarding PERFORMANCE STANDARDS as component of PM system

  7. Q3. Current status regarding PERFORMANCE MEASUREMENT as component of PM system

  8. Q4. Current status regarding PHAB MEASURES related to PM

  9. Q4. Current status regarding PHAB MEASURES related to PM

  10. Q4. Current status regarding PHAB MEASURES related to PM

  11. Q4. Current status regarding PHAB MEASURES related to PM

  12. Topics to include in PM workshop • Self-assessment tool • Developing, setting org. objectives, measures, indicators, standards • Linking CHIP to PM system • Linking individual & agency PM • Linking agency division & individual PM • Software

  13. The END (at least for the needs assessment part)

More Related