1 / 1

Project Objectives

Stormwater Management Reduces peak flows, and time to peak flows Increases stormwater quality as pollutants settle out Designed to accommodate 10 year return period storms. Project Objectives

media
Télécharger la présentation

Project Objectives

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Stormwater Management • Reduces peak flows, and time to peak flows • Increases stormwater quality as pollutants settle out • Designed to accommodate 10 year return period storms • Project Objectives • Draft multiple layouts to accommodate lots ranging from 1 acre estates to 0.1 acre low maintenance lots. • Conduct geotechnical investigation for foundation and stormwater designs • Reduce the impact to the environment through the use of stormwater management • Develop innovative solutions to create a low impact development • Geotechnical Investigation • Soil samples were taken from 6 locations based on SGS soil maps and topography • water content, plasticity, confined compression, and grain size analysis were conducted for each sample • Penetrometer test conducted at each site • Results showed that the soil had suitable Suitable bearing capacity Figure I.3 Intensity Duration Frequency Curve (IDFC) the site • Rain Garden • Provides stormwater detention, increases water quality, and facilitates groundwater recharge • Constructed with a high permeability soil, sand, or gravel • Water storage is provided within the pore spaces Soil Test Sites Paragon Prepared For: Construction • Site Layout • Layout chosen to minimize grading by following existing land contours • Smaller lots located along golf course to maximize views • Estate lots located in a gated community on southern parcel Minerva Engineering Prepared By: Department of Civil Engineering Stephen Rowe, John Kats, Matt Lash, Peter Flynn, Ryan Schipper

More Related