List of shots carried out on Feb 4, 2009 after bakeout process, including magnet calibrations, startup shots, fiducial shots, and boronizing procedures. Relevant for re-running standard shots and calibrations.
Télécharger la présentation
Magnet Calibrations and Standard Shot Re-run Procedures
An Image/Link below is provided (as is) to download presentation
Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author.
Content is provided to you AS IS for your information and personal use only.
Download presentation by click this link.
While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server.
During download, if you can't get a presentation, the file might be deleted by the publisher.
E N D
Presentation Transcript
XP900 List of Shots 4 Feb 2009
After bakeout • Magnetics calibrations • Run startup shot from 2008 (Shot List A) • 126933 • 122642 • 127110 (or equivalent) – Fiducial [900kA, 0.45T, CS @1000, A 40ms, B, 80ms, no C] • Boronize (10g TMB) • Re-run Shot List A