1 / 13

2 nd Open Meeting of the Super-KEKB Collaboration

2 nd Open Meeting of the Super-KEKB Collaboration. March 17-19, 2009 3-gokan, Seminar Hall KEK. Welcome !. Super-KEKB Collaboration. Long way to come here Beyond 1034 e+e- workshop (2000.6) 1 st Super-KEKB workshop (2001.8) 6 th (2004.11)

Télécharger la présentation

2 nd Open Meeting of the Super-KEKB Collaboration

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. 2nd Open Meeting of the Super-KEKB Collaboration March 17-19, 2009 3-gokan, Seminar Hall KEK

  2. Welcome !

  3. Super-KEKB Collaboration • Long way to come here • Beyond 1034 e+e- workshop (2000.6) • 1st Super-KEKB workshop (2001.8)6th (2004.11) • Joint Super B Factory workshop in Hawaii (2004.1)2nd (2005.4) • B Factories and New Measurements (2006.9)3rd (2008.1) • 1st Open meeting for the proto-collaboration (2008.3) • 2nd Open meeting for the proto-collaboration (2008.7) • 1st Open meeting of the Super-KEKB collaboration (2008.12) E.O.I from 42 inst. 1st IB meeting today Chair: Leo Piilonen Let’s take a picture like this with Kobayashi-san.

  4. LHC Energy frontier experiments LHC, ILC, … KEKB upgrade Higgs, SUSY, Dark matter, New understanding of space-time… ILC n exp., m LFV, t LFV, gm-2, 0nbb… B Factories, LHCb, K exp., nEDM etc. Neutrino mixing/masses, Lepton number non-conservation… CP asymmetry, Baryogenesis, Left-right symmetry, New sources of flavor mixing… J-PARC High Energy Physics in the Next Decade New particles and new interactions Three approaches to New Physics Lepton physics Quark flavor physics

  5. operation & completion of 1st goal J-PARC power upgrade upgrading to Super-KEKB KEKB operation & upgrade Photon Factory continue R&D and compact ERL ERL R&D Summary of KEK Roadmap 2007 2008 2009 2010 2011 2012 construction 1st results operation LHC LHC upgrade TDP1 ILC R&D lots and lots of R&D’s TDP2

  6. Luminosity Prospect 50ab-1 by ~2020 X50 present Physics with O(1010) B & t also D L~8x1035 cm-2s-1 3year shutdown for upgrade

  7. Physics Reach at Super-KEKB/Belle Upper limits • Sharpening your eyes where to look • Hints for NP workshop Search for H± in B→tn 50ab-1 assume 5s discovery CP asymmetry in B→KKK, fK and h’K ■   ●      ★ 0.3 X10-9 (3s discovery lim.) 0.1 Deviation from SM Present exp. limits 0.03 CKM at 50ab-1 Integ. Lum.( ab-1) 5ab-1 Reach of B factories 50ab-1 0.01 Upgraded KEKB 1 10 100 Physics at Super B Factory (hep-ex/0406071) being updated. Integ. luminosity (ab-1)

  8. Crab crossing New IR b*y = σz = 3 mm SuperKEKB Crab cavities installed and undergoing testing in beam e+ 9.4 A e- 4.1 A Studies also for low-emittance scheme has started. Dampiing ring The superconducting cavities will be upgraded to absorb more higher-order mode power up to 50 kW. The state-of-art ARES copper cavities will be upgraded with higher energy storage ratio to support higher current. Higher current More RF New vacuum system + Linac upgrade The beam pipes and all vacuum components will be replaced with higher-current design. will reach 8 × 1035 cm-2s-1

  9. Super-Belle (Baseline) ECL Wave sampling + pure CsI crystal(endcap) PID Threshold Aerogel + TOF → TOP + Aerogel-RICH KL/m detection RPC → Scintillator +SiPM(endcap) Final design ? How do we decide, and when ? CDC Super small cell Longer lever arm New Dead time free readout and high speed computing systems SVD 4-lyr DSSD → 2-lyr. DEPFET pixel + 4-lyr DSSD

  10. Time Line • Near-term plan (preliminary) • Detector proposals (by summer 2009). • The final detector design by Dec. 2009. 2009 2010 2008 1 2 3 4 5 6 7 8 9 10 11 12 1 2 3 10 11 12 KEKB operation Internal review Detector proposals We need make clear the Time line / Milestone (also for accelerator design) Kick-off meeting (Dec 08) TDR Actions to invite new collaborators

  11. We must get ready before the G-Light ! • Accelerator • High current scheme or Low emittance scheme • Detector • Finalization of detector design • Organization • Collaboration name ? • Funding • Phyiscs Photodetector for E-PID Need determine the time line

  12. Enjoy !

More Related