ERCOT Meeting Update: NOGRR084, ORDC, and PR0047-01CMSDK/MIR Replacement Project (04/17/2014)

This document provides an update on the ERCOT meeting held on April 17, 2014, covering critical topics such as NOGRR084, upcoming project efforts, and the ORDC initiative. Notable discussions included the PR0047-01CMSDK/MIR Replacement Project, which aims to transition from the current Market Information Repository (MIR) system to a new Information Content Exchange (ICE) system. The report summarizes the status of data elements related to NOGRR084 and outlines the TAC reporting process, including recommendations for reports to automate or discontinue.

melvyn
Télécharger la présentation

ERCOT Meeting Update: NOGRR084, ORDC, and PR0047-01CMSDK/MIR Replacement Project (04/17/2014)

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. MISUG Meeting Materials ERCOT 04/17/2014

  2. Update Items • NOGRR084 • Upcoming Project Efforts • ORDC • PR0047-01CMSDK/MIR Replacement Project • TAC Reporting on ERCOT Manual Efforts

  3. NOGRR084 • Data Elements included in NOGRR084 • Data Elements published currently • Data Elements not currently published • Review of NOGRR084 • No new updates, project is still Not Started

  4. Review Open Requests/Specifications

  5. ORDC and LIS

  6. ORDC and LIS

  7. PR0047-01CMSDK/MIR Replacement Project PR0047-01CMSDK/MIR: Replacement project which replaces the current back end Market Information Repository (MIR) system with a new Information Content Exchange (ICE) system.   The MIR/ICE systems store externally delivered files that are found on the Market Information System (MIS), ERCOT.com and External Web Services (EWS).  Market Notice: M-B021914 • Phase 1 Implemented 04/13/2014 – Internal • Phase 2 Implemented 04/14/2014 – Internal • Phase 3 To Be Implemented 04/22/2014 – File names to change Current file name convention: prefix.8DigitReportTypeID.16DigitDUNSNUMBER.YYYYMMDD.HHMISS.freeformfilename.extension Updated file name convention for inclusion of milliseconds: prefix.8DigitReportTypeID.16DigitDUNSNUMBER.YYYYMMDD.HHMISSsss.freeformfilename.extension’

  8. TAC Reporting Summary of Information Gathered • 134 Reports manually produced by ERCOT staff • 95 Required by Sub Rules, Protocols or OBD • 33 Requested or self prompted • 15 Recommended to discontinue - eliminates ~500 hrs of manual work • 118 Recommended to continue - ~25,000 hrs of manual work • 15 Recommended to be automated - ~4000 hrs of manual work to be automated

  9. TAC Reporting Cont. • Ancillary Service Requirement Methodology Assessment (NP3-783-M) • Medium Term PASA - Load Forecast (NP3-760-M) • Profile Data Evaluation Report (ZP18-432-M) • Contingency List Changes Due to Weather (ZP4-724-M) • Dispatch Instructions Compliance Metrics (NP8-510-M) • Move-In Status Trend Data • Other Retail Transactions Summary Data • Switch Status Trend Data • Switcher Report • Medium Term PASA - Projected Transmission Constraints (NP3-776-M) • Backup Control Plan Test Dates and Results Summary (NP8-908-M) • Backup Control Plan Submittal Results (NP8-922-M) • Reliability Must Run Cost Data Deviation Requests/Responses (NP3-558-M) • Medium Term PASA - Resource Forecast (NP3-775-M) • RUC Payments Made to Resources with Power Purchase Agreements (PPA) Annual Report (NP5-661-M)

  10. MISUG 2014 • Questions • New Issues • Next Steps