1 / 9

The Value of Information

The Value of Information. Using risk to guide decision-making under uncertainty NWHA Annual Conference February 2014. xkcd.com. Darin E. Johnson BIS Consulting. Problem summary. Upgrade of a hydro-generation facility. Two-unit plant with space for a third.

mercia
Télécharger la présentation

The Value of Information

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. The Value of Information • Using risk to guide decision-making under uncertainty • NWHA Annual Conference • February 2014 xkcd.com Darin E. Johnson BIS Consulting

  2. Problem summary • Upgrade of a hydro-generation facility. Two-unit plant with space for a third. • Option 1 – upgrade the existing units. • Option 2 – upgrade existing and install a third, smaller unit

  3. Initial results of the economic analysis Option 1looks better by $3 million… …but there is still a lot of uncertainty.

  4. Another way to look at it • Overlap of the curves represents the “cost to reject” an option. • The risk that we will regret selecting one option. • Cost to reject Option 2 - $4.6 million. $4.6 million risk

  5. What are the sources of our uncertainty? • Construction cost estimates • Performance of units - future water and dispatch. • Failure rates and consequences. • Energy prices. • License, regulation. • Fish passage. • Others? Some of these we can improve, others we can’t

  6. What if we collect more information? What we expect to happen: • Curve narrows, but stays in the same location. What might happen: • Curve narrows and moves to the right. We now prefer Option 2 Solution?: • Look at all possibilities; weight them.

  7. Here is where we see the value of information • Where we are now… • Option 1 looks better, but there is a lot of overlap. • Risk from rejecting worse option: $4.6 million. • Where we could be… • We do some work to reduce uncertainty for one or both options. • Risk is reduced – in this example, to $1.7 million. If we can do this work for less than $2.9 million, it is worthwhile.

  8. What can we take away from this? • As always, spending decisions should be based on whether benefits exceed costs. • Develop a problem statement and put it in a cost/benefit framework as soon as possible. • Don’t worry if you’re uncertain. Focus on bounding your uncertainty – ask experts for maximum and minimum values. • Remember – information is a means to an end. • Compare the decision you would make today with the range of decisions you might make if you had better information. • Pursue further information only if it reduces cost.

  9. Thank you

More Related