Proposal: Energy Project at Duke Farms, Hillsborough, NJ

Proposal: Energy Project at Duke Farms, Hillsborough, NJ. Trecia Ashman Paola Barry Zarina Zayasortiz. Proposal ME 423 October 5, 2004. Generate electric power using a photovoltaic cogeneration system for Duke Farms in Hillsborough, NJ.

mercury
Télécharger la présentation

Proposal: Energy Project at Duke Farms, Hillsborough, NJ

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Proposal: Energy Projectat Duke Farms, Hillsborough, NJ Trecia Ashman Paola Barry Zarina Zayasortiz Proposal ME 423 October 5, 2004

  2. Generate electric power using a photovoltaic cogeneration system for Duke Farms in Hillsborough, NJ Explore another method for the generation of electricity using a renewable resource Objective

  3. Mission of Duke Farms • Serve as a model of land stewardship and open space preservation for education and public enjoyment • Duke Farms Foundation

  4. Objective of Duke Farms • Advance the practice of environmental planning, horticulture, landscape architecture and the stewardship of natural resources through academic and professional programs • Provide a beautiful place where visitors can enjoy the landscape and horticulture and learn about the environment through public programs, school activities and family recreation.

  5. Reasons for Duke Farms’ Utilization of Project • Certain potentials for energy development onsite • One of the first steps towards an ongoing partnership between Stevens and Duke Farms • Always had an interest in this type of technology • Concern for the environment • Great willingness to utilize innovative technology • “Preserve the cultural and environmental legacy of Doris Duke’s properties”

  6. Approach to Problem After reading about this project, the team was divided into two groups: • Solar group investigated: • How PV cell works • Average amount of sunlight in NJ area • Efficiency of cells vs. amount of land needed • Co-generation group investigated: • How cogeneration works • Benefits of co-generation • Economics of the process

  7. Approach (cont.) • Weekly meetings to report findings • Case study performed using an average home in NJ for sample calculations • used as a scale for the Duke Farms Project

  8. Gantt Chart

  9. Solar Energy • first built in the 1950’s with an efficiency of 4% • PV cells convert sunlight to electricity • Light knocks e- loose from atoms for easy movement

  10. Sunlight Distribution Estimated Solar Energy For The Contiguous United States  Kilowatt Hours Per Region

  11. Worst Case Scenario

  12. Our Case Study • Models a typical home in NJ • Took into account the group’s research findings: • NJ receives on average 4.6 hrs of sunlight per day, per year • PV systems in the Northern Hemisphere should point south • The system should be inclined at an angle equal to the area’s latitude • 1Kw system generates 1,250Kwhr/yr • Typical home uses about 8,500Kwh/yr

  13. Our Case Study (cont.) • Using the information that the group gathered: • This means it would take a 6.8 Kw system to run this house for the year without any other power source.

  14. Our Case Study (cont.) • By using the following chart, this would take approximately 2,040 ft2 is using cells with 4% efficiency.

  15. Montville, NJ Case Study • 4,000 sq. ft. home in NJ. • The system included 36, 167 watt solar energy modules installed on the south roof and the west roof the garage. • A total of 6,012 watts of peak power is capable of being generated from this system.

  16. Case Study (cont.)

  17. Costs of the system: $45,000 $31,215 rebate received from NJ Clean Energy Program Total Cost to the homeowner was $13,785, not including the $2,000 Federal Tax Credit that is still pending Case Study (cont.)

  18. Case Study (cont.) PV System Savings Summary

  19. Photovoltaic System Advantages • Environmentally-friendly • Free fuel (sunlight) • Extremely safe and reliable • Can supply onsite electrical loads or back-feed the grid • Any excess power needed can be supplied from the electric utility

  20. Photovoltaic System Advantages • Minimal maintenance and low failure rates • Can be designed for variety of applications and operational requirements • No moving parts, is modular, easily expandable, and easily transportable • Can be used either for centralized or distributed power generation

  21. Financial Incentives for Photovoltaic System • Mainstay Energy Program • Sales of green tags • Solar Renewable Energy Certificates • Renewable attributes of solar generation • Solar and Wind Energy Systems Exemption • Sales tax exemption

  22. Financial Incentives for Photovoltaic System • Renewable Energy Advanced Power Program • Awards of up to 20% total construction costs • Renewable Energy Economic Development Program • Funding for development of renewable energy businesses and technologies • New Jersey Clean Energy Rebate Program • Rebates of up to 70% installed cost

  23. Alternate Designs • Outsourcing for Design • Lease Equipment • Lease Land • Direct Contracting

  24. Answers Needed from Duke • What is the basis for the Farms’ interest in this technology? • Are there any economic advantages? • Different uses of electricity in the facility? Pricing? • What constraints are there on potential locations? • Feasibility of self-maintained and operated facility? • Contact with any prospective energy company leasers? • Any aesthetic constraints?

  25. Anticipated Problems • Cloudy days • Economic Feasibility • Communicating with Duke Farms

  26. Site Visit

  27. Budget/ Expenses

  28. Deliverables A written progress report will be submitted at the end of the Fall 2004 Semester containing the following: • Feasibility study • Alternative design concepts for photovoltaic cogeneration at Duke Farms • Prioritize alternatives according to technical and economic practicality

  29. Questions?