30 likes | 134 Vues
Follow the progress of the VHMPID setup with a focus on liquid radiator testing and connecting components for beam time. Stay updated on safety measures and collaboration efforts. Join VHMPID monthly meetings for discussions.
E N D
Status & news from VHMPID Jungyu Yi 20120601 HIPEx Local Meeting
1st day Set Up • Beam time : 5/31 ~ 6/11 - with GyorgyBencze, Gyula , Michael Weber, Jihye- Technical test for pressurized option • The 1st step : To Reproduce ‘liquid VHMPID’ setup • Short liquid radiator, small area photo cathode • to check all the connections , environment and DAQ • On the Beam Line • Mount ‘old(= liquid radiator) VHMPID’ prototype • Pre-cleaning the chamber with liquid • ‘Gassiplex’ with new readout board • Connect & Identified Cables : HV cable, Motion control cable • In the counting room • Register DAQ computer (by Michael Weber). • Discussed with Gyorgy, Michael and friends what to do. • Transparency Meter • waiting for new window installed long tube. • ‘Safety valve’ will be adapted. HiPEx Local Meeting 20120601
1st day Set Up • Collaboration • VHMPID monthly meeting : 5/30 22:30~ (KST) https://indico.cern.ch/conferenceDisplay.py?confId=193166 • Safety meeting : 06/01 09:00~ (CERN) ‘What are the hazardous events than can occur on ALICE-VHMPID beam test set-up during its life-cycle and that can have an impact on Safety?’ • AOB • Bike rental • meeting time arrangement? HiPEx Local Meeting 20120601