VHMPID Technical Test for Liquid Radiator Setup in HipEx Local Meeting
30 likes | 134 Vues
Follow the progress of the VHMPID setup with a focus on liquid radiator testing and connecting components for beam time. Stay updated on safety measures and collaboration efforts. Join VHMPID monthly meetings for discussions.
VHMPID Technical Test for Liquid Radiator Setup in HipEx Local Meeting
E N D
Presentation Transcript
Status & news from VHMPID Jungyu Yi 20120601 HIPEx Local Meeting
1st day Set Up • Beam time : 5/31 ~ 6/11 - with GyorgyBencze, Gyula , Michael Weber, Jihye- Technical test for pressurized option • The 1st step : To Reproduce ‘liquid VHMPID’ setup • Short liquid radiator, small area photo cathode • to check all the connections , environment and DAQ • On the Beam Line • Mount ‘old(= liquid radiator) VHMPID’ prototype • Pre-cleaning the chamber with liquid • ‘Gassiplex’ with new readout board • Connect & Identified Cables : HV cable, Motion control cable • In the counting room • Register DAQ computer (by Michael Weber). • Discussed with Gyorgy, Michael and friends what to do. • Transparency Meter • waiting for new window installed long tube. • ‘Safety valve’ will be adapted. HiPEx Local Meeting 20120601
1st day Set Up • Collaboration • VHMPID monthly meeting : 5/30 22:30~ (KST) https://indico.cern.ch/conferenceDisplay.py?confId=193166 • Safety meeting : 06/01 09:00~ (CERN) ‘What are the hazardous events than can occur on ALICE-VHMPID beam test set-up during its life-cycle and that can have an impact on Safety?’ • AOB • Bike rental • meeting time arrangement? HiPEx Local Meeting 20120601