An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. PUBLIC WORKS DEPARTMENTOperation & Maintenance Budget FY 2011-12 Budget Worksession July 12, 2011

  2. Presentation Outline • Organization Chart • Proposed FY 2011-12 Budget • Accomplishments • Budget Challenges • Summary

  3. Presentation Outline • Organization Chart • Proposed FY 2011-12 Budget • Accomplishments • Budget Challenges • Summary

  4. Organization Chart Director – Mark V. Massaro, P.E. Deputy Director – Joseph C. Kunkel, P.E. Public Works Engineering Robin L. Hammel, P.E. Fiscal & Administration Ralphetta Aker, J.D. Highway Construction Julie Naditz, P.E. Development Engineering Diana Almodovar, P.E. Roads & Drainage Deodat Budhu, P.E. Stormwater Management Rodney Lynn, P.E., Interim Manager Traffic Engineering Ruby Dempsey Rozier

  5. Presentation Outline • Organization Chart • Proposed FY 2011-12 Budget • Accomplishments • Budget Challenges • Summary

  6. Proposed FY 2011-12 Budget • These figures do not include the Red Light Running Program or Capacity Reservation Fee Refunds

  7. Proposed FY 2011-12 Budget Proposed FY 2011-12 Operating Budget: $77.2M 20% 9% 71%

  8. Proposed FY 2011-12 Budget Public Works Manning vs. Population Fiscal Year

  9. Proposed FY 2011-12 Budget • Operational Impacts • Staffing requirements • Reached critical mass • FY 2007-2008 (29) Positions eliminated • FY 2008-2009 (8) Positions eliminated • FY 2009-2010 (46) Positions eliminated • FY 2010-2011 (7) Positions eliminated • FY 2011-2012 (3) Position eliminated

  10. Presentation Outline • Organization Chart • Proposed FY 2011-12 Budget • Accomplishments • Budget Challenges • Summary

  11. Accomplishments • Maintained 2,738 miles of roadway • Maintained 1,635 retention ponds • Installed 11 miles of new sidewalk • Maintained 548 traffic signals

  12. Resurfaced 190 lane miles of arterial, collector, and subdivision roads Installed 4 new school flashers Red Light Running Ordinance and Contract Awarded Accomplishments

  13. Presentation Outline • Organization Chart • Proposed FY 2011-12 Budget • Accomplishments • Budget Challenges • Summary

  14. Budget Challenges • Workload Indicators • Level of Service • Programs • Operational Challenges

  15. Budget Challenges • Workload Indicators

  16. Budget Challenges • Workload Indicators

  17. Budget Challenges • Workload Indicators

  18. Budget Challenges • Level of Service Challenges • Level of Service FY 12 Consistent with FY 11

  19. Level of Service - Roads & Drainage Resurfacing program Right-of-way mowing Retention pond mowing Street sweeping Budget Challenges

  20. Level of Service - Roads & Drainage Resurfacing program - 15-year existing cycle Budget Challenges

  21. Level of Service - Roads & Drainage Right-of-way mowing - 4-6 week existing cycle Budget Challenges

  22. Level of Service - Roads & Drainage Retention pond mowing - 4-6 week existing cycle Budget Challenges

  23. Level of Service - Roads & Drainage Street sweeping – 4-5 week existing cycle Budget Challenges

  24. Level of Service - Roads & Drainage Tree trimming - scheduled if critical Drainage rehabilitation - as needed Budget Challenges

  25. Level of Service – Traffic Engineering School zones and flashers - installed as needed Traffic signals - warranted signals scheduled for installation Pedestrian safety upgrades - modified based on field conditions Traffic calming devices - MSBU's with matching funds Budget Challenges

  26. Budget Challenges • Programs • Pedestrian Safety Improvements • Ability to provide adequate sidewalk for school age pedestrians and address current backlog

  27. Budget Challenges • Operational Challenges • Impact on Level of Service • Infrastructure Maintenance • Prolonged delays increase cost • Require more maintenance

  28. Budget Challenges • Operational Challenges • Future growth will require additional operational funding • Emergency response

  29. Presentation Outline • Organization Chart • Proposed FY 2011-12 Budget • Accomplishments • Budget Challenges • Summary

  30. Level of Service Remains same as FY 11 Programs Consistent with FY 11 Operational Impacts 0.9% increase over FY 11 Summary

  31. PUBLIC WORKS DEPARTMENTOperation & Maintenance Budget FY 2011-12 Budget Worksession July 12, 2011