1 / 12

RAPAT BIDANG TEKMOS 2 Januari 2014 Ruang Rapat Bidang Tekmos

RAPAT BIDANG TEKMOS 2 Januari 2014 Ruang Rapat Bidang Tekmos. AGENDA : TATA ULANG RUANGAN PEMBAGIAN PEKERJAAN LAIN-LAIN. Teamwork Bidang Teknologi Atmosfer. Metoda Satelit dan Radar. Instrumen Pengamatan Atmosfer. Database Atmosfer Indonesia. Personil Bidang Teknologi Atmosfer.

mervyn
Télécharger la présentation

RAPAT BIDANG TEKMOS 2 Januari 2014 Ruang Rapat Bidang Tekmos

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. RAPAT BIDANG TEKMOS2 Januari 2014Ruang Rapat Bidang Tekmos • AGENDA : • TATA ULANG RUANGAN • PEMBAGIAN PEKERJAAN • LAIN-LAIN

  2. Teamwork Bidang Teknologi Atmosfer Metoda Satelit dan Radar Instrumen Pengamatan Atmosfer Database Atmosfer Indonesia

  3. Personil Bidang Teknologi Atmosfer Metoda Satelit dan Radar Metoda Satelit dan Radar Instrumen Pengamatan Atmosfer Database Atmosfer Indonesia

  4. Beban kerja yang seharusnyasesuai Tukin berbasis absensi

  5. Tata ruang & PERSONILEXISTING 2013 Toilet Lab. Instrumentasi Lab. Komputer Dapur Arsip TU Lab. Satelit Pegawai Baru

  6. Tata ruang & PERSONIL TEKMOS PLANNING 2014 Toilet Lab. Instrumentasi Lab. Komputer Dapur ??? Arsip TU Lab. Satelit

  7. INHOUSE Studi 1 2 Purna-karya 3 4 5 6 7 ASN : Aparatur Sipil Negara (PNS & non PNS), perlu diajukan sesuai kebutuhan ?? 8

  8. PERALATAN : 2013 1. MTSAT Bandung : Risyanto, Safrudin, Krismianto, Adetya 2. NOAA Bandung (rusak) : Safrudin, Krismianto, Risyanto 3. Automatic Weather Stations (AWS) Tanjungsari, Watukosek, Pontianak,MAWS-Vaisala, DAVIS, M2N : Noersomadi, Rudi 4. Air Quality Monitoring Systems (AQMS) (spare part) Bandung APSA, APNA, APHA Display : Sinta Berliana S., Tiin Sinatra, Suparno, Heri 5. Ozone Dasibi Bandung (perlu kalibrasi, spare part), Pontianak, Watukosek, Dasibi Normal Sinta BerlianaS,Tiin Sinatra,Suparno,Adetya, Heri 6. Brewer Spectrophotometer (komputer perlu install ulang), perlu UPS, penangkal petir, lampu merkuri, Bandung : Soni Aulia, Rahmad, Edy, Suparno 7.Pyranometer Bandung & Watukosek (lama tdk dikalibrasi, biasanya dikirim ke pabrik) : Soni Aulia, Rachmat, Suparno 8.Lidar (minimal 2 kali seminggu wajib dinyalakan, perlu dibikin jadwal operasional piket), Bandung Jepang Normal Halimurrahman, Prof. ChuneniLatief, Asif Awaludin,Hendarman, Suparno. 9. Transportable Radar,Bandung Gamic Jerman : Noersomadi, Prof. ChuneniLatief, AsifAwaludin, Hendarman Mekanik/Teknisi : Rudi, Rachmat, Suparno 10. CO2 Bandung & Kototabang, Pontianak, down kena petir (1 minggu yll), email pak Wahid, prl penangkal petir Watukosek, kena petir, sdh dibw ke bdg, nunggu spare part, prl penangkal petir Palembang, ok, tp prl kalibrasi atau ganti sensor. Ari Ginaldi, Asif, Rachmat,Heri 11. Data dari Balai dan Loka LAPAN ke PSTA Bandung : Muzirwan, Edy, Adetya, Mahmud 12. Media Center : Edy,Muzirwan,Adetya, Mahmud 13. Komputer Cluster : Halimurrahman, Muzirwan, Edy, Adetya, Mahmud 14. Database : Mahmud,Muzirwan, Edy, Adetya, 15. FO Bdg-Pare& Rumpin, : Mahmud, Muzirwan, Edy, Adetya 16. Internet : Adetya,Muzirwan, Edy, Mahmud, Rudi. 17. Laboratorium instrumentasi : Asif, Ari Ginaldi,Heri, Rudi.

  9. PERALATAN

  10. PERALATAN (lanjutan 1…)

  11. Yang perlu disiapkan (2014) • Masing-masing membuat agenda selama 1 tahun. • Mempersiapkan SKP (dikumpulkan paling lambat 18 Januari 2014). • Mempersiapkan desain riset, untuk presentasi bulan Januari/Pebruari.

More Related