1 / 18

Working Group 4 Summary/Plans

Working Group 4 Summary/Plans. Coordination only after 01-Oct-2008. “Not available” after 01-Oct-2008. Coordinators: J.L. Klay (Cal Poly) and M. Heinz (Yale) Contributing Members: Ken Read (Tennessee) Josh Hamblen (Tennessee) Irakli Martashvili (Tennessee) Ben Rizzo (Creighton)

mervyn
Télécharger la présentation

Working Group 4 Summary/Plans

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Working Group 4 Summary/Plans Coordination only after 01-Oct-2008 “Not available” after 01-Oct-2008 Coordinators: J.L. Klay (Cal Poly) and M. Heinz (Yale) Contributing Members: Ken Read (Tennessee) Josh Hamblen (Tennessee) Irakli Martashvili (Tennessee) Ben Rizzo (Creighton) Postdoc (Creighton) Sebastien Gadrat (Grenoble) Brandon Boswell (Cal Poly) Christopher Brown (Cal Poly) August-November after 15-August (Mostly) Summer ALICE EMCAL PPR Meeting

  2. Simulations completed for CD-2 Reasonably final: • Electron, W and B-jet rates (PYTHIA only) • Electron and Hadron Background rates (PYTHIA only) • Including photon conversions (full detector included, no reco) • Electron track-matching and PID (Full simulation + Full reconstruction) • Efficiency and e/h discrimination • Preliminary DVM technique for semi-leptonic decays • Background rejection • Preliminary W-jet rejection Good start, but need more effort: Note: Noise, other sim parameters have changed since CD-2 simulations. We may want to re-do everything with latest version of AliRoot, newer cuts, etc ALICE EMCAL PPR Meeting

  3. Electron rates *This plot should be redone Need to double-check that these rates agree with MNR NLO ~5000 B-electrons L=0.5mb-1, 1yr =106 s, Pb-Pb scaling ALICE EMCAL PPR Meeting

  4. Conversion backgrounds Track-matching cut eliminates these (~20% reduction) Start of EMCAL: <10% convert before TRD/TOF R~428cm ALICE EMCAL PPR Meeting

  5. Electron/Hadron Ratios *This plot should be redone Need a minimum factor of 400 hadron rejection ALICE EMCAL PPR Meeting

  6. Track-Cluster matching *Should be revisited PYTHIA ~90% track-cluster matching efficiency **Re-check efficiency in PYTHIA and HIJING Matched particles (mostly hadrons) ALICE EMCAL PPR Meeting

  7. Electron ID: p/E What is the status of testbeam e/h? ALICE EMCAL PPR Meeting

  8. Electron ID: summary *Should be re-done For pT>10 GeV/c, pion rejection is well above the factor 400 needed High efficiency *Add a few more efficiency curves? ALICE EMCAL PPR Meeting

  9. B-Jet Rates Should make annual statistics plot similar to electron rates Expect several hundred 80 GeV B-jets per year ALICE EMCAL PPR Meeting

  10. Displaced Vertex Method /e K Pe+K e- CDF Phys.Rev.D66 (2002)) D0 SecVtx r B- PrimVtx Lxy • The method pursued here has previously been used by CDF to identify secondary vertices from semi-leptonic decays. • Breakdown of method: • Find a high-pt electron trigger particle in EMCAL • Pair with all charged hadrons within a cone of radius dR. • Reconstruct “approximate” (average between B-D decay) secondary vertex and apply more cuts to reduce backgrounds from other leptonic decays. • Plot Lxy distribution and obtain B-contribution from positive/negative imbalance Lxy= r .pe+k / |pe+k| ALICE EMCAL PPR Meeting

  11. Signal vs. Backgrounds Bottom Signal Cuts used for analysis • Electron pT-cut > 10 GeV/c • Min. 6 ITS-hits on both electron/hadron track • Inv mass of (elec-kaon) mass > 1.7 GeV • Pair DCA < 200 m • B-Tag = |Lxy| > 600 m Backgrounds ALICE EMCAL PPR Meeting

  12. Efficiencies More stats needed, higher pT B-jets B-jets All sources Dalitz B-jets B-jets Charm Conversions ALICE EMCAL PPR Meeting

  13. W backgrounds So far only a qualitative look ~10x higher stats B-jet electrons W electrons pT pT EMCAL Acceptance EMCAL Acceptance h h ALICE EMCAL PPR Meeting

  14. DVM Comparison: B-jet vs W More statistics needed Blue = right - left B-jets W Standard cuts Standard cuts + Minv> 1.7 GeV (charm rejection) Standard cuts + Minv> 1.7 GeV + Max ITS-hits ALICE EMCAL PPR Meeting

  15. DVM results Electrons from all sources (before DVM method) Electrons from all sources (after DVM method) After applying DVM cuts the signal efficiency is ~30-40%, whereas the backgrounds are factor ~100 suppressed. ALICE EMCAL PPR Meeting

  16. What’s needed for PPR • Revisit rate calculations with higher statistics • Re-check e-ID with newer AliRoot • Electron and Electron-Jet Trigger • Rates and backgrounds? • Electron Spectra/RAA studies • Investigate electron  heavy meson (Charm/Bottom) correspondence in AA • Compare to TPC alone and TPC+TRD vs. with EMCAL • D/B Spectra/RAA studies • DVM method for B-mesons through e+D • Displaced vertex reconstruction of B through J/psi+K • Compare to electron RAA • B-jet studies • DVM B-jet selection • Effect of mis-identified electron/hadrons? • W rejection • Study of alternative tagging methods/algorithms • Combine DVM method and electron ID with JETAN • Cone and FastJet objects • FF performance for B-jets • Effect of mis-identified B-jets on FF Effect of mis-identified electron/hadrons? ALICE EMCAL PPR Meeting

  17. Preliminary work matrix ALICE EMCAL PPR Meeting

  18. ALICE Grid resources available v4-10-Rev-02 v4-11-Rev-02 v4-10-Rev-02 v4-11-Rev-02 v4-12-Rev-02 v4-13-Rev-02 • PDC08 simulations used a few different AliRoot versions • http://pcalimonitor.cern.ch/job_details.jsp • EMCAL was in for all of these runs • At Offline week we were encouraged to submit requests • CPU is not a problem • Storage for our files is the major issue • Do we have grid-accessible space at pdsf/LLNL? ALICE EMCAL PPR Meeting

More Related