1 / 2

BDS for AD&I Wrap up Friday 16:00 to 17:30 Deepa Angal-Kalinin, Andrei Seryi

BDS for AD&I Wrap up Friday 16:00 to 17:30 Deepa Angal-Kalinin, Andrei Seryi. Lots of technical progress (ATF2; MDI; IR stability; beam dump; instrumentation, etc) SB2009 relevant progress provided BDS layout to CFS freeze layout, for CFS to be able to proceed

mieko
Télécharger la présentation

BDS for AD&I Wrap up Friday 16:00 to 17:30 Deepa Angal-Kalinin, Andrei Seryi

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. BDS for AD&I Wrap up Friday 16:00 to 17:30Deepa Angal-Kalinin, Andrei Seryi • Lots of technical progress (ATF2; MDI; IR stability; beam dump; instrumentation, etc) • SB2009 relevant progress • provided BDS layout to CFS • freeze layout, for CFS to be able to proceed • Internals of optics still to be optimized, w/o layout change • discussed implications of low P (TF) parameters • collimation; IP feedback; muon background, pairs, … • require change of specs for other systems (Linac & RTML) – bunch to bunch jitter in the train • New issues needing work, if any ? • Power specs of new beam dump (abort line) to be clarified • Time to resolve these issues? • To be done before beginning of November • Status of cost reviews? • Cost of new beamlines to be evaluated • To be done before beginning of November • Instructions on report writing • discussed this and have a plan of outline of the section

  2. AD&I Wrap up Friday 16:00 to 17:30 • Very brief reports from WG’s on SB2009 work in parallel sessions. • New issues needing work, if any ? • Time to resolve these issues?WG Convener • Status of cost reviews?Costing group • Instructions on report writingEditors

More Related