1 / 0

Industry Site Visit Camp Bondsteel, Kosovo 02 June , 2011

Industry Site Visit Camp Bondsteel, Kosovo 02 June , 2011 . USAREUR Support Contract II Site Visit . Administrative Remarks CETAM . USAREUR Support Contract II Site Visit . 02 June 2011 Camp Bondsteel Kosovo. USC II Site Visit 02 June 2011. STRONG SOLDIERS, STRONG TEAMS!.

mimir
Télécharger la présentation

Industry Site Visit Camp Bondsteel, Kosovo 02 June , 2011

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Industry Site Visit Camp Bondsteel, Kosovo 02 June , 2011
  2. USAREUR Support Contract II Site Visit Administrative Remarks CETAM
  3. USAREUR Support Contract II Site Visit 02 June 2011 Camp Bondsteel Kosovo USC II Site Visit 02 June 2011 STRONG SOLDIERS, STRONG TEAMS!
  4. USAREUR Support Contract II Site Visit 02 June 2011 Camp Bondsteel Kosovo USC II Site Visit 02 June 2011 STRONG SOLDIERS, STRONG TEAMS!
  5. USAREUR Support Contract II Site Visit Welcome AST Balkans
  6. UNCLASSIFIED / FOR OFFICIAL USE ONLY Area Support Team Balkans OVERVIEW BRIEF 2 June 2011 UNCLASSIFIED / FOR OFFICIAL USE ONLY
  7. Purpose Provide an overview of Area Support Team Balkans support relationships, contract management oversight, and the roles of assigned personnel in support of Multi National Battle Group-East (MNBG-E).
  8. AST Balkans Mission Area Support Team Balkans is the base operations command at Camp Bondsteel, Kosovo with a forward operating office at Camp Butmir, Bosnia. Our mission as USAREUR’s Executive Agent is to support contingency operations in the Balkans; supervise and direct base camp activities; implement policies, procedures, and programs to ensure the safety and security of all Camp Bondsteel occupants; exercise Title 10 responsibilities for all US forces in Kosovo and Bosnia-Herzegovina; perform oversight of all US Army convoys and transit activities in support of KFOR and headquarters NATO Mission-Sarajevo within the Balkans Area of Operations; and serve as the channel through which USAREUR provides technical oversight, expertise, and assistance to Multi-National Battle Group – East at Camp Bondsteel.
  9. Balkans Overview AST Balkans Forward Operating Cell Sarajevo: Staff: 3 LN NATO personnel. Support to: 28-35 U.S. military NHQ Sarajevo NATO HQ Pristina: Support to U.S. personnel and facilities AST Balkans, Camp Bondsteel: Staff: 55 military and DA civilians; 14 LN NATO personnel Support to: - 721 U.S. military (MNBG-E) - 510 Troop Contributing Nations (Turkish, Polish, Ukraine, Romanian, Croatian, Swiss, Slovenian, Hellas, German, French). - 400 resident contractors (and 1,800 LN day contractors) Bosnia and Herzegovina Serbia Montenegro Kosovo Bulgaria Macedonia
  10. Camp Bondsteel Aerial View
  11. Bondsteel Infrastructure Water Treatment Plant: - Three wells - average depth 600 feet - Approx 149,000 gallons per/day (meets or exceeds U.S. EPA standards) Wastewater: - Process and treat approx 170,000 gallons of wastewater daily Installed power capacity: - 31.9 megawatts - Underground Power Cable: 298 miles General Installation Facts: - Acreage: 980.94 - Housing capacity 2,400 - Perimeter Fence: Approx. 7 miles - Helicopter Pads: 60 - Paved Road: Approx. 9 miles - Gravel Road: Approx. 17 miles - Gravel Pad/Parking: 7,325,000 sq ft - 187 South East Asia (SEA) Huts - 40 ATCOs 1 Chapel 1 Modular Hospital 1 Dining Facility (seating capacity – 792)
  12. Logistics Functions Dining Facility: - Prepares 3,553 meals per day (eat-in, take-out, mermite & box meals) - On average 110,143 meals per month, for a total of 1.4M meals per year - Plus special fare for all U.S. holidays Transportation Management (304 Vehicles): - Performing approx. 13K dispatches/safety inspections per year - Fleet maintenance - Driven over 3M miles per year - Averaging 98% Operational Readiness (OR) rate since Jan 06 - Installation bus and taxi services Central Issue facility: - Receive, issue, turn-in, and direct exchange - 4,309 customers served 1 Jan 07 to present – valued at $2,296,632 TDA Property Book: Government property valued at over $55M
  13. Bondsteel Support - USAREUR Support Contract (USC) is the primary contract vehicle that supports Bondsteel infrastructure. KFOR Badging - DS/ORG Maintenance - Roads & Grounds - Vector/Pest Control HAZMAT - Laundry U.S. Mail Delivery - Central Issue Facility MWR Support - Container Handling Movement Control Teams Water Production/ Distribution Waste Management - Engineering & Construction - Firefighting - Transportation & Services - Food Service - Railhead Operations - Supply Support Activity - Aviation/Ground Fueling Air Field/Air Terminal Services - Other (non-USC) contracts provide linguist services, perimeter security force, intelligence analytical support, leased copiers, maintenance of specialized communications systems, fuel deliveries, and leased vehicles.
  14. AST Balkans Organization As of 15 April 2011 COMMANDER COL Steve Campfield Theater Enablers AAFES AST MANAGER* (Della Hodges) XO (LTC Glenn Gibbs) CETAM RM (D. Cottrell DPCO (Della Hodges) DPW (LTC Nick Garzone) PMO DOL (Alonzo Williams) DSPO (MAJ Dave Mazi) CCT AIRFIELD MGT MNSC (MAJ Greg Arenas) ACES Minor Construction S&S AT/FP AMC DLA SAFETY Environ- mental CLO (CPT Keller) MWR PBO PHYS SEC Augmenters PAC Work Orders. FOOD SVC PLANS/OPS KBRS Real Estate Housing CIF MWD TEAM ITT MAINT CUSTOMS TRANS * Ms. Hodges is the Acting AST Manager until final selection/hire is completed.
  15. Theater Enablers Corps of Engineers – Middle East District (CETAM): Proponent: U.S. Army Corps of Engineers Key Relationships: AST Balkans Commander/Staff MNBG-E Chief of Staff/S-4 USAREUR G4 Plans and Operations Principal advisor to MNBG-E and AST Balkans for USC Contract support: Only entity in theater authorized to direct USC Contractor (PCO and ACO) Contract Project Manager Request ROMs / Review ROMs Advise Joint Acquisition Review Board Members Issue Notices to Proceed (NTP) for un-programmed new work Issue Letters of Technical Direction for recurring services Maintain estimated balance of funding
  16. AAFES Army and Air Force Exchange Service (AAFES): Other AAFES Concessions in Southtown: Barber Shops Beauty Shop Cappuccino Bars Internet Services Pressing Service New Car Sales Sewing Shop Souvenir Shops Thai Massage
  17. Right-sizing Bondsteel: Griffin Hill and North LSA dismantling/ deconstruction. On-going Tactical Vehicle Retrograde. (with future cuts of tactical and/or NTV’s) On-going excess Property Disposal thru USC.

    AST Balkans Focus

  18. The Future As We Know It When U.S. Maneuver and supporting elements of Multi-National Battle Group-East (MNBG-E) are no longer required in Gate 3, the U.S. Army will have no operational requirement for Camp Bondsteel. Therefore, pursuant to U.S. regulations, Camp Bondsteel must be transferred or deconstructed. Obtain disposition and complete shipments of equipment/ vehicles as directed by USAREUR/21st TSC. Conduct final environmental assessments. Deconstruct remainder of Bondsteel. Return land to original condition or negotiate settlements with land owners. Gate 3 is projected within the next two years, based on current information.
  19. Bondsteel Right-Sizing BLAHA Demolish/Remove Griffin Hill: 85 % dismantled Dismantle/demolish North LSA: - 3 ATCOS (dismantled) - 48 SeaHuts (on-going dismantling) - North DFAC (dismantled) - Bunkers/HESCO’s (removed)
  20. AST Balkans Questions?
  21. USAREUR G4 AST-BLACK SEA
  22. AST-BLACK SEA OPERATIONAL AREA Permanent Forward Operating Sites (PFOS) Romania PFOS operational in Apr 11 Bulgaria PFOS projected to be complete in FY12 Austere life support facilities Supportive rail, road, sea, & air networks Range and training area support Small US staff with local national contractors for base support PFOS/MKAF BABADAG TRAINING AREA Romania PORT OF CONSTANTA Romania PFOSBabadag Training Area=75km PFOSConstanta Airport=1km PFOSPort of Constanta=25km Bulgaria NSTABurgas Airport=95km NSTAPort of Burgas=95km PFOS RomaniaNSTA Bulgaria=375km (8 hours by ground) NOVO SELO TRAINING AREA/PFOS Bulgaria BURGAS AIRPORT PORT OF BURGAS 22
  23. Permanent Forward Operating Site (PFOS) Romania Suitable for Life Support Activities, Command Post Exercises, Communications Exercises, Conferences; access to BTA for Field and Live Fire Training. Fully Operational on April 2011. Life Support: Capacity: 1350 Dining Facility MWR, Shoppette Barber Shop Internet Cafe Facilities: Office/Admin Buildings Fuel Point Aid Station (not staffed) Ammunition Holding Area Arms Room Maintenance Facility Forward Supply Point NIPR, SIPR, DSN Training: Engagement Skills Trainer 2000 Call For Fire Trainer HMMWV Egress Assistance Trainer (HEAT) 25 meter Small Arms Range 75 km to Babadag Training Area (1.5 hours by ground) Infrastructure: 1 km to Constanta International Airport Helipad (4) Railhead Seaport (25 km away) 23 23
  24. Romanian Temporary Forward Operating Site (TFOS) MK Airfield A1 D49 AIR OPS AHA FSP WASH RACK C MWR TSC SIPR DFAC C1 Deconstruct Permanent UNCLASSIFIED
  25. Romanian Permanent Forward Operating Site (PFOS) TFOS PFOS AHA AIR OPS Air Ops MK Airfield FSP A1 D49 Barracks Fuel Point C Wash Rack PX MWR C1 Postal DFAC Commo *Areas in black are classified as PFOS. Capacity: 1350 TSC
  26. Bulgarian Permanent Forward Operating Site (PFOS) Barracks Laundry and Barber Shop BDE HQs and Arms Room WWTP Co and Bn Ops Facilities DFAC Postal Fuel Station PX Wash Rack Aid Station *Still in construction. Tentative completion time of Summer 2012.
  27. PWS Overview Presented by: Bill Cioffi President, WP Cioffi Engineering Management, Inc. (WPCE)

    USAREUR Support Contract (USC)

  28. Contract Scope and Type Area of Support Contingency Operations within the USAREUR AOR Type of Contract IDIQ Task Order Contract Combination Fixed Price Cost Reimbursable Type of Contract Performance-based Service Contract Type of Work Recurring Services Services Provided on Regular Basis Scheduled Unscheduled Non-Recurring Services One-time As Required Services
  29. Contract Schedule / CLIN Structure Fixed Price CLIN Kosovo SubClins for each Fixed Price Function (31) Additive SubClins for Food Service SubClins for: Phase-in/Phase Out Mobilization/De-mobilization Manpower Reporting Romania SubClins for each Fixed Price Function (20) Additive SubClins for Exercises SubClins for: Phase-in/Phase Out Mobilization/De-mobilization Manpower Reporting Cost Reimbursable CLIN Kosovo SubCLINs: Temporary Construction/Site Restoration Non-recurring Support Services Port Support Activity Multi-national Support SubCLINs for Equipment, Freight, Material Romania Temporary Construction/Site Restoration Non-recurring Support Services Multi-national Support SubCLINs for Equipment, Freight, Material
  30. Standard Elements of a PWS Organized in Six Sections (Section C of the Contract) C-1: General Requirements and Information C-2: Definitions C-3: Government Furnished Property C-4: Contractor Furnished Material, Facilities, Equipment C-5: Performance Work Statement Technical Description of Work Performance Requirements Summary Technical Exhibits C-6: Publications and Forms
  31. C-1 General Requirements & Information History & Background PWS Structure Work Responsibilities Government Non-Exclusive Contractor Management Organization Personnel Meetings / Conferences Hours of Operation / Days of Operation Utility Service Interruptions Coordination Government Operations Other Government Contractors Material, Equipment, and Supply Compliance Liabilities, Safety, Environmental, Security Energy, Utilities, Warranties
  32. C-1 General Requirements & Information Plans Maintenance and Service Plan Media Relations Plan Quality Control Plan Contractor Management Plan Personnel Plan Behavior Language Proficiency Identification and Uniforms Reports/CDRLs Management & Administrative Reports 11 Reports Recurring Services Reports 17 Reports Non-Recurring Services Reports 3 Reports
  33. C-2 Definitions Terminology Definitions for terms as used in this Contract Acronyms Meaning of acronyms used in this Contract
  34. C-3 Government Furnished Property Accountability and Inventory Management Transfer of Accountability Property Control System Plan Property Administration Report of Government Property Inventory Management Initial Procedures Periodic Inventory Contract Expiration and Termination Accountability and Inventory Management Transfer of Accountability Property Control System Plan Property Administration Report of Government Property Inventory Management Initial Procedures Periodic Inventory Contract Expiration and Termination Tech Exhibit Property List
  35. C-4 Contractor Furnished Property Government Reimburses Contractor for Purchase of Material, Equipment, and Supplies Purchased incidental to Provision of Services Requirement for Facilities and Equipment Plan
  36. C-6 Publications and Forms Army Regulations Pamphlets, Memos Public Works Technical Bulletins Technical Manuals Forms Engineering Pamphlet Field Manual Other US Code FAR Joint Service Publications DoD Form USAREUR Publications USAREUR Regulations National Fire Protection Association US Federal Specifications
  37. C-5 Technical Description of Work Romania Program Management Program Mgt NTP Procedures Scheduled PWSs (2) Unscheduled PWS (NTPs) Base Maintenance & Utility Services DPW SO/IJO Procedures Scheduled PWS (10) Unscheduled PWSs Service Orders & IJOs Temporary Construction & Site Restoration Force Support Force Support NTP Procedures Scheduled PWSs (2) Unscheduled PWS (NTPs) Logistics Support Log Support NTP Procedures Scheduled PWSs (7) Unscheduled PWSs Unscheduled PWS (NTPs) Kosovo Program Management Program Mgt NTP Procedures Scheduled PWSs (3) Unscheduled PWS (NTPs) Base Maintenance & Utility Services DPW SO/IJO Procedures Scheduled PWS (11 functions) Unscheduled PWSs Service Orders & IJOs Temporary Construction & Site Restoration Force Support Force Support NTP Procedures Scheduled PWSs (7) Unscheduled PWS (NTPs) Logistics Support Log Support NTP Procedures Scheduled PWSs (11) Unscheduled PWSs Port Support Activity Unscheduled PWS (NTPs)
  38. USAREUR Support Contract – II PWS Section C-5
  39. USAREUR Support Contract – IIProgram Management
  40. Program Management General Operating Provisions and NTP Procedures
  41. General Operating Provisions and NTP Procedures Kosovo Section 5.1.1-K General Operating Provisions Material and Supplies Maintenance and Service Plan NTP Justification Components Process Thresholds Notification of Start Accomplishment Evaluation and Acceptance Changes Input for Final Costs Romania Section 5.1.1-R General Operating Provisions Material and Supplies Maintenance and Service Plan Site Access / Authorization to Perform / Safety /Environmental / Vehicle Operation / Standards of Conduct / ID Badges NTP Justification Components Process Thresholds Notification of Start Accomplishment Evaluation and Acceptance Changes Input for Final Costs
  42. Program Management Scheduled Services
  43. Program Management Operating and Personnel Standards Kosovo Section 5.1.2.1-K Scope of Work USC-II Program Management Kosovo Project Management Hours of Operation Normal Duty Day 6 days per week/8 hours per day Personal Standards US Citizen Requirement USC-II Program Management Program Manager Alternate Program Manager Kosovo Project Project Manager Accounting Manager Procurement & Materials Mgr Subcontracts Administrator Security Manager Language Requirement Communicate in English Certifications/Qualifications Duties/Responsibilities Section C-1 TE C-1 – 003 Romania Section 5.1.2.1-R Scope of Work Romania Project Management Hours of Operation Normal Duty Day 5 days per week/8 hours per day Personal Standards US Citizen Requirement Romania Project Project Manager Language Requirement Communicate in English Certifications/Qualifications Duties/Responsibilities Section C-1 TE C-1 – 003
  44. Program/Project ManagementScheduled Services Kosovo Section 5.1.2.1-K USC-II Program Management Contract Program Management Contingency Planning Lines of Communication Kosovo Project Management Project Management Financial Management Human Resource Management Material Management Property Management Information Technology Support Reports and Plans Romania Section 5.1.2.1-R Romania Project Management Project Management Financial Management Human Resource Management Material Management Property Management Information Technology Support Reports and Plans
  45. Quality ControlOperating and Personnel Standards Kosovo Section 5.1.2.2-K Scope of Work Contractor Quality Control Hours of Operation Normal Duty Day 6 days per week/8 hours per day Personal Standards US Citizen Requirement Quality Control Manager Language Requirement Communicate in English Certifications/Qualifications USACE QC/QA training course Romania Section 5.1.2.1-R Scope of Work Contractor Quality Control Hours of Operation Normal Duty Day 5 days per week/8 hours per day Personal Standards US Citizen Requirement None Language Requirement Communicate in English Certifications/Qualifications None Specified
  46. Quality Control Scheduled Services Kosovo Section 5.1.2.2-K Quality Control Plan Content Files/Access Reports Documentation Subcontractor QC Customer Feedback Quality Control Execution QC Execution Performance Reviews Romania Section 5.1.2.1-R Quality Control Plan Content Files/Access Reports Documentation Subcontractor QC Customer Feedback Quality Control Execution QC Execution Performance Reviews
  47. Phase-in/Phase-out Scheduled Services Kosovo Section 5.1.2.3-K Phase-in Phase-in Plan Submitted w/Proposal Phase-in Requirements Phase-in Transfer of Property Phase-out Phase-out Plan 75 days prior to Option Year Phase-out Requirements Phase-out Transfer of Property Romania Section 5.1.2.3-R Phase-in Phase-in Plan Submitted w/Proposal Phase-in Requirements Phase-in Transfer of Property Phase-out Phase-out Plan 75 days prior to Option Year Phase-out Requirements Phase-out Transfer of Property
  48. Program Management Unscheduled Services
  49. Unscheduled Services Program Management Services Kosovo Section 5.1.3-K Scope of Work Force Support Unscheduled Work Personal Standards US Citizen Requirement None Language Requirement Supervisors and Wk Leaders - level 2 Certifications/Qualifications None Specified Performance Standards NTP Accomplishment AQL – TBD NTP Evaluation and Acceptance AQL – TBD NTP Changes AQL – TBD Completed NTPs AQL – TBD Romania Section 5.1.3-R Scope of Work Force Support Unscheduled Work Personal Standards US Citizen Requirement None Language Requirement Supervisors and Wk Leaders - level 2 Certifications/Qualifications None Specified Performance Standards NTP Accomplishment AQL – TBD NTP Evaluation and Acceptance AQL – TBD NTP Changes AQL – TBD Completed NTPs AQL – TBD
  50. USAREUR Support Contract – IIBase Maintenance & Utility Services
  51. USAREUR Support Contract – IIBase Maintenance & Utility Services General Operating Provisions /Work Order Procedures
  52. General Operating Provisions Work Order Procedures Kosovo Section 5.2.1-K General Operating Provisions Material and Supplies Maintenance and Service Plan Facility Maintenance Status Warm Base / Cold Base Work Classification Scheduled Work -- SOOs Unscheduled Work – SOs / IJOs Work Management Work Standards Work Documentation Romania Section 5.2.1-R Facility Maintenance Status Warm Base / Cold Base Base Level and Exercise Level Requirements CLIN Structure Base Requirement Additive Requirements General Operating Provisions Material and Supplies Maintenance and Service Plan Language / US Citizen / Site Access / Authorization to Perform Work Classification Scheduled Work – SOOs Unscheduled Work – SOs / IJOs Work Management Work Standards Work Documentation
  53. General Operating Provisions and Work Order Procedures Technical Exhibits Kosovo All Tech Exhibits included in 5.2.2-K4 Romania TE 5.2.1-R – 001 Building Listing (BTA) Building # Location Dimensions Status at Population Range TE 5.2.1-R – 002 Building Listing (PFOS) Building # Location Dimensions Status at Population Range TE 5.2.1-R – 003 Map Site Plan MK Airbase TE 5.2.1-R – 004 Grassed Area MK Airbase TE 5.2.1-R – 005 Map BTA Training Area TE 5.2.1-R – 006 Map PFOS
  54. USAREUR Support Contract – IIBase Maintenance & Utility Services Scheduled Services
  55. Work Management and ControlStandards: Operating / Personnel / Performance Kosovo Section 5.2.2-K (para. 5.1) Scope of Work Work Management, Work Control, and Work Reception Hours of Operation 7 days per week/11 hours per day Personal Standards US Citizen Requirement Work Management Site Manager Senior Engineer Language Requirement Work Reception All employees have level 2 proficiency Certifications/Qualifications None Specified Performance Standards Work Management and Control AQL – 4.0% Work Reception AQL – 4.0% Romania Section 5.2.2.1-R Scope of Work Work Management, Work Control, and Work Reception Hours of Operation 5 days per week/9 hours per day Personal Standards US Citizen Requirement None Language Requirement Supervisors and Work Leaders have level 2 proficiency Certifications/Qualifications None Specified Performance Standards Work Management and Control AQL – 5.0% Work Reception AQL – 5.0%
  56. Work Management and Control Scheduled Services Kosovo Section 5.2.2-K (para. 5.1) Work Management and Control Managing Scheduled Work Managing Unscheduled Work Procedures and Protocols Coordination & Scheduling Contract Program Management Customer Interface/Inquires Service Disruption Work Reception Sources of Work Work Reception Operations Staffing/Services When Work Reception is Closed Romania Section 5.2.2.1-R Work Management and Control Managing Scheduled Work Managing Unscheduled Work Procedures and Protocols Coordination & Scheduling Contract Program Management Customer Interface/Inquires Service Disruption Work Reception Sources of Work Work Reception Operations Staffing/Services When Work Reception is Closed
  57. Work Management and Control Technical Exhibits/Workload Kosovo TE 5.2.2-K – 001 Work Requests / Work Orders SOOs / PMIs Processed Completed Service Orders Processed Emergency Urgent Routine Completed Emergency Urgent Routine Romania TE 5.2.3-R – 001 – Service Orders
  58. Buildings & Structures Maintenance Standards: Operating / Personnel / Performance Kosovo Section 5.2.2-K (para. 5.2) Scope of Work Buildings and Structures Maintenance Hours of Operation 7 days per week/11 hours per day Personal Standards US Citizen Requirement None Language Requirement Supervisors and Work Leaders have level 2 proficiency Certifications/Qualifications None Specified Performance Standards Inspections AQL – 2.5% Maintenance AQL – 4.0% Romania Section 5.2.2.2-R Scope of Work Buildings and Structures Maintenance Hours of Operation 5 days per week/9 hours per day Personal Standards US Citizen Requirement None Language Requirement Supervisors and Work Leaders have level 2 proficiency Certifications/Qualifications None Specified Performance Standards Inspections AQL – 2.5% Maintenance AQL – 4.0%
  59. Buildings & Structures Maintenance Scheduled Services Kosovo Section 5.2.2-K (para. 5.2) Exterior Inspection Buildings Walls/Windows/Roofs/Foundation Doors Fences/Gates Railings/Stairs Ammunition Storage Interior Inspection Interior Structure Plumbing Scheduled Maintenance Walls -- Painting Gutters Doors Fences/Gates Railings/Stairs Ammunition Storage Romania Section 5.2.2.2-R Exterior Inspection Buildings Walls/Windows/Roofs/Foundation Doors Fences/Gates Railings/Stairs Ammunition Storage Interior Inspection Interior Structure Plumbing Scheduled Maintenance Walls -- Painting Gutters Doors Fences/Gates Railings/Stairs Ammunition Storage
  60. Buildings & Structures Maintenance Technical Exhibits/Workload Kosovo TE 5.2.2-K – 002a PMs and Inspections Inspections Painting PMs TE 5.2.2-K – 002b Building Listing (Active) Building # Location Dimensions TE 5.2.2-K – 002c Building Listing (Cold Base) Building # Location Dimensions TE 5.2.2-K – 002d Building Listing (Deconstructed) Building # Location Dimensions TE 5.2.2-K – 002e Building Listing (Remote Sites) Building # Location Dimensions TE 5.2.2-K – 002f Fences and Gates) Linear Feet Type Romania TE 5.2.1-R – 001 Building Listing (BTA) Building # Location Dimensions Status at Population Range TE 5.2.1-R – 002 Building Listing (PFOS) Building # Location Dimensions Status at Population Range TE 5.2.2.2-R – 001 Fences and Gates Linear Feet Type
  61. Roads and Grounds Maintenance Standards: Operating / Personnel / Performance Kosovo Section 5.2.2-K (para. 5.3) Scope of Work Roads and Grounds Yards Paved/Unpaved Hours of Operation 7 days per week/11 hours per day Personal Standards US Citizen Requirement None Language Requirement Supervisors and Work Leaders have level 2 proficiency Certifications/Qualifications None Specified Performance Standards Inspections - AQL – 0.0% Grounds Maintenance - AQL – 4.0% Roads Maintenance - AQL – 4.0% Waterways. Channels. Gutters, Storm Sewers AQL – 4.0% SNIC - AQL – 2.5% Romania Section 5.2.2.3-R Scope of Work Roads and Grounds Yards Paved/Unpaved Hours of Operation 5 days per week/9 hours per day Personal Standards US Citizen Requirement None Language Requirement Supervisors and Work Leaders have level 2 proficiency Certifications/Qualifications None Specified Performance Standards Inspections - AQL – 0.0% Grounds Maintenance - AQL – 4.0% Roads Maintenance - AQL – 4.0% Waterways. Channels. Gutters, Storm Sewers AQL – 4.0% SNIC - AQL – 2.5%
  62. Roads and Grounds Maintenance Scheduled Services Kosovo Section 5.2.2-K (para. 5.3) Surfaced Area Inspection Scheduled Maintenance Mowing/Leaf Control/Erosion Control Road Grading Dust Abatement Paved Surface Sweeping and Cleaning Maintenance of Pavements Maintenance of Waterway Channels, Gutters, Ditches, Storm Sewers SNIC Plan On-base Off-base Romania Section 5.2.2.3-R Surfaced Area Inspection Scheduled Maintenance Mowing/Leaf Control Paved Surface Sweeping and Cleaning Maintenance of Pavements Maintenance of Waterway Channels, Gutters, Ditches, Storm Sewers SNIC Plan On-base
  63. Roads and Grounds Maintenance Technical Exhibits/Workload Kosovo TE 5.2.2-K – 003a Workload Inspections Mowing/Leaf Removal Road Grading Dust Abatement Pavement Maintenance SNIC TE 5.2.2-K – 003b Roads and Grounds Metrics / Service Frequencies TE 5.2.2-K – 003c SNIC Routes/Priority TE 5.2.2-K – 003d Camp Bondsteel Map – Mowing TE 5.2.2-K – 003e SNIC Map – On-base Priorities TE 5.2.2-K – 003f SNIC Map – Off Base TE 5.2.2-K – 003g SNIC Map – Repeater Sites Romania TE 5.2.2.3-R – 001 Roads and Grounds Metrics and Frequencies TE 5.2.2.3-R – 002 Grass Areas – MK Airbase TE 5.2.2.3-R – 003 Building Green Areas – MK Airbase
  64. Electrical Systems / Services Standards: Operating / Personnel / Performance Kosovo Section 5.2.2-K (para. 5.4) Scope of Work Provide Electrical Power Operate Generators Maintain Electrical Systems Hours of Operation Operations 7 days / week/24 hours per day Maintenance 7 days / week/11 hours per day Personal Standards US Citizen Requirement Master Electrician Language Requirement Supervisors and Work Leaders have level 2 proficiency Certifications/Qualifications None Specified Performance Standards Power Generation - AQL – 0.0% Non-Critical Systems - AQL – 4.0% Substation and Distribution Systems AQL – 2.5% Emergency, Security, Other Critical Systems AQL – 0.0% Romania Section 5.2.2.4.1-R Scope of Work Maintain Electrical Systems / Generators Hours of Operation 5 days per week/9 hours per day Personal Standards US Citizen Require - None Language Require - Supv/Wk Leaders level 2 Certifications/Qualifications - None Specified Electrical Standards Specifications Provided - TE -- 008 Performance Standards Electrical Service Standards -- AQL – 4.0% Hours of Operation -- AQL – 4.0% Interior Electrical Inspection -- AQL – 2.5% Distribution System/Controls -- AQL – 2.5% Lightening -- AQL – 0.0% Grounding -- AQL – 2.0% Exterior Fixtures -- AQL – 4.0% Fire alarm/ Emergency Lights - AQL – 0.0% Maintaining Generators – AQL – 4.0% Transfer Switch -- AQL – 2.5% Distribution System -- AQL – 4.0% Gov’t Generators – AQL – 4.0%
  65. Electrical Systems / Services Scheduled Services Kosovo Section 5.2.2-K (para. 5.4) Provide Electrical Power Base Camp FOB Operate and Maintain Power Generators Periodic Inspection and Maintenance Interior Building Electrical Systems Exterior Electrical Fixtures Laundry Substation and distribution Systems Exit and Emergency Lights Security systems Lightning Protection Grounding Hospital Alarm System Romania Section 5.2.2.4.1-R Periodic Inspection and Maintenance Interior Building Electrical Systems Exterior Electric Fixtures Distribution Systems Controls Emergency Lights Fire Alarm and Detection Systems Lightning Protection Grounding Operation and Maintenance of Electrical Distribution System Servicing Government Provided Generators
  66. Electrical Systems / Services Technical Exhibits/Workload Kosovo TE 5.2.2-K – 004a Metrics for Generators TE 5.2.2-K – 004b Metrics for Power Generation and Distribution TE 5.2.2-K – 004c Metrics for Light Sets TE 5.2.2-K – 004d Exterior Lights Metrics TE 5.2.2-K – 004e Other Electrical Equipment metrics TE 5.2.2-K – 004f Deterrent and Security Systems (ESS) metrics TE 5.2.2-K – 004g Deterrent and Security Systems (ACS) metrics TE 5.2.2-K – 004h Lightning Protection System metrics TE 5.2.2-K – 004i Grounding System metrics Romania TE 5.2.2.4.1-R – 001 Main Distribution Panels and Switches TE 5.2.2.4.1-R – 002 Lightning Protection TE 5.2.2.4.1-R – 003 Grounding TE 5.2.2.4.1-R – 004 Street Lights TE 5.2.2.4.1-R – 005 Walkway Lights TE 5.2.2.4.1-R – 006 Fire Alarms/Smoke Detectors TE 5.2.2.4.1-R – 007 Generators TE 5.2.2.4.1-R – 008 Electrical Specifications
  67. HVAC Systems / Services Standards: Operating / Personnel / Performance Kosovo Section 5.2.2-K (para. 5.5) Scope of Work Operate and Maintain HVAC Systems Hours of Operation 7 days per week/11 hours per day Personal Standards US Citizen Requirement None Language Requirement Supervisors and Wk Leaders - level 2 Certifications/Qualifications None Specified Performance Standards Critical HVAC Systems AQL – 2.5% Non-Critical HVAC Systems AQL – 4.0% Essential HVAC Systems AQL – 10.0% Romania Section 5.2.2.4.2-R Scope of Work Operate and Maintain HVAC Systems Hours of Operation 5 days per week/9 hours per day Personal Standards US Citizen Requirement None Language Requirement Supervisors and Wk Leaders - level 2 Certifications/Qualifications None Specified Performance Standards HVAC Standards - AQL – 4.0% Hours of Operation - AQL – 10.0% Critical HVAC Systems - AQL – 2.5% Non-Critical HVAC Systems - AQL – 4.0% ECUs and HVAC Units - AQL – 10.0% Central HVAC Systems - AQL – 4.0%
  68. HVAC Systems / Services Scheduled Services Kosovo Section 5.2.2-K (para. 5.5) Operate and Maintain HVAC Systems Base Camp Central Units Offices/Admin Areas/Living spaces Temporary Facilities Storage Areas Periodic Inspection and Maintenance Individual ECUs Ventilation Exhaust and Air Supply Units Commercial Cooking Hood and Duct Exhaust Systems CARC Paint Booth Ventilation Systems Central Heating/Cooling Systems Romania Section 5.2.2.4.2-R Operate and Maintain HVAC Systems Base Camp Central Units Offices/Admin Areas/Living spaces Temporary Facilities Storage Areas Periodic Inspection and Maintenance Individual ECUs Central Heating/Cooling Systems
  69. HVAC Systems / Services Technical Exhibits/Workload Kosovo TE 5.2.2-K – 005a Central Heating and Cooling Systems TE 5.2.2-K – 005b ECUs and Other HVAC Systems Romania TE 5.2.2.4.2-R – 001 HVAC Systems TE 5.2.2.4.2-R – 002 HVAC Equipment
  70. Water Systems / Services Standards: Operating / Personnel / Performance Kosovo Section 5.2.2-K (para. 5.6) Scope of Work Supply Water, Distribute Water and Maintain Water Systems and Water Distribution System Hours of Operation Operations 7 days per week/24 hours per day Maintenance 7 days per week/11 hours per day Personal Standards US Citizen Requirement Water Production General Foreman Language Requirement Supervisors and Wk Leaders - level 2 Certifications/Qualifications None Specified Performance Standards Supplying Water AQL – 0.0% Testing Water AQL – 0.0% Water Distribution AQL – 2.5% Dedicated Water Systems Hospital -- AQL – 0.0% Laundry -- AQL – 4.0% Romania Section 5.2.2.4.3-R Scope of Work Provide and Distribute Water Hours of Operation 5 days per week/9 hours per day Personal Standards US Citizen Requirement - None Language Requirement Supervisors and Wk Leaders - level 2 Certifications/Qualifications - None Specified Performance Standards CHPPM Water Standards -- AQL – 0.0% WTP Water Standards -- AQL – 0.0% Hours of Operation – AQL – 4.0% Point of Contact/Trained Staff – AQL – 4.0% WTP Operation – AQL – 4.0% Site Maintenance – AQL – 4.0% Periodic Maintenance – AQL – 4.0% Testing and Monitoring – AQL – 4.0% Reporting – AQL – 4.0% Waste Disposal – AQL – 4.0% Water Delivery – AQL – 4.0% Testing and Inspection – AQL – 0.0%
  71. Water Systems / Services Scheduled Services Kosovo Section 5.2.2-K (para. 5.6) Supply Water Municipal Water Wells Operate, purify, treat, chlorinate, store Transport Supply water to FOBs Operate and Maintain Water Systems Periodic Testing and Inspection Sampling and Testing Domestic Hot Water Main Water Lines Water Trucks Water Distribution Dedicated Water Systems Hospital Laundry Romania Section 5.2.2.4.3-R Operate and Maintain Water Treatment Plants Staffing Operation Site Maintenance Periodic Maintenance Testing Reporting Waste Disposal Water Delivery Testing and Inspection
  72. Water Systems / Services Technical Exhibits/Workload Kosovo TE 5.2.2-K – 006a Water Production Water Produced Delivered TE 5.2.2-K – 006b Water Systems Workload Hot Water Heaters / Valves /Backflow Assemblies / Pump Stations / Main Water Lines / Water Trucks / Hospital System / Laundry System / Boot Washes TE 5.2.2-K – 006c Water Distribution System TE 5.2.2-K – 006d Water Appliances Drinking fountains / Water Heaters / Hand Wash Stations / Boot Washes TE 5.2.2-K – 006e Water Storage and Treatment Systems Romania TE 5.2.2.4.3-R – 001 Water Tanks Specifications Deliveries TE 5.2.2.4.3-R – 002 Water Deliveries – May 2010 TE 5.2.2.4.3-R – 003 Water Deliveries – June 2010
  73. Wastewater Systems / Services Standards: Operating / Personnel / Performance` Kosovo Section 5.2.2-K (para. 5.7) Scope of Work Collect, Transport, Dispose of sewage and industrial waste and Maintain Wastewater Systems and Wastewater collection and distribution System Hours of Operation Operations 7 days /week/24 hours per day Maintenance 7 days / week/11 hours per day Personal Standards US Citizen Requirement - None Language Requirement Supervisors and Wk Leaders - level 2 Certifications/Qualifications - None Specified Performance Standards WWTP and Collection Systems - AQL – 0.0% Wastewater Collection and Distribution Systems - AQL – 2.5% Septic Tanks Cleaning/Collection - AQL- 4.0% Wash Racks - AQL – 4.0% Romania Section 5.2.2.4.4-R Scope of Work Collect, Transport, Dispose of sewage and industrial waste and Maintain Wastewater Systems and Wastewater collection and distribution System Hours of Operation Operations 7 days / week/24 hours per day Maintenance 5 days / week/9 hours per day Personal Standards US Citizen Requirement - None Language Requirement Supervisors and Wk Leaders - level 2 Certifications/Qualifications - None Specified Performance Standards Wastewater Standards - AQL – 2.0% Hours of Operation - AQL – 4.0% WWTP Operation - AQL – 2.0% Septic Waste Collection, Transport, Disposal AQL – 4.0% Septic Tanks - AQL – 4.0% Wastewater Systems - AQL – 4.0%
  74. Wastewater Systems / Services Scheduled Services Kosovo Section 5.2.2-K (para. 5.7) WWTP and System Operations Operate WWTP Sewage Lagoons, Collection Systems, Disposition Systems Maintain Wastewater Collection and Distribution Systems Lift Stations Catch Basins Separators Traps Settlement Tanks Sewer and Storm Drains Septic Tanks Septic Waste Collection and Transport Wash Racks Romania Section 5.2.2.4.4-R Operate and Maintain Wastewater Treatment Plant Operation Maintenance Lift Stations Sewage Lines Monitor Effluent Septic Waste Collection and Transport Septic Tanks Maintain Wastewater Systems Catch Basins Separators Traps Wash Racks
  75. Wastewater Systems / Services Technical Exhibits/Workload Kosovo TE 5.2.2-K – 007a Wastewater Treated, Septic Waste Transported TE 5.2.2-K – 007b Wastewater Workload – PMs: Lift Stations Satellite Lift stations Catch Basins Manholes Separators Settlement Tanks Septic Tanks Wash Racks TE 5.2.2-K – 007c Wastewater Systems – Distribution, Holding, Treatment TE 5.2.2-K – 007d Wastewater Appliances / systems Toilets / Septic Tanks / Trucks / Separators / Traps / Basins Romania TE 5.2.2.4.4-R – 001 Wastewater System Layout – Site Plan TE 5.2.2.4.4-R – 002 Wastewater Collection Tanks/Truckloads Capacity Volume 5.2.2.4.4-R – 003 Daily Wastewater Collection – May 2010 5.2.2.4.4-R – 004 Daily Wastewater Collection – June 2010
  76. Refuse Collection/Re-cycling Services Standards: Operating / Personnel / Performance Kosovo Section 5.2.2-K (para. 5.8) Scope of Work Collect, Transport, Dispose of refuse and Recycle material Hours of Operation 7 days per week/11 hours per day Personal Standards US Citizen Requirement None Language Requirement Supervisors and Wk Leaders - level 2 Certifications/Qualifications None Specified Performance Standards Refuse Collection AQL – 10.0% Refuse Transport AQL – 4.0% Medical Waste AQL – 0.0% Recycling AQL – 10.0% Romania Section 5.2.2.5-R Scope of Work Collect, Transport, Dispose of refuse Hours of Operation 5 days per week/9 hours per day Personal Standards US Citizen Requirement None Language Requirement Supervisors and Wk Leaders - level 2 Certifications/Qualifications None Specified Performance Standards Refuse Collection Standards AQL – 5.0% Hours of Operation AQL – 4.0% Refuse Collection – Pick up AQL – 10.0% Refuse Collection – Position Maintain, Disinfect Containers AQL – 10.0%
  77. Refuse Collection/Re-cycling Services Scheduled Services Kosovo Section 5.2.2-K (para. 5.8) Refuse Collection Schedule Position Containers Disinfect Containers Maintain Containers Replace Containers Pick up Refuse Refuse Transportation Transport Clean Vehicles Refuse Disposal Medical Waste Recycling Romania Section 5.2.2.5-R Refuse Collection Schedule Position Containers Disinfect Containers Maintain Containers Pick up Refuse Refuse Transportation Transport Clean Vehicles Refuse Disposal Hazardous Waste Accumulation and Transport HWAPs Medical Waste Batteries
  78. Refuse Collection/Re-cycling Services Technical Exhibits/Workload Kosovo TE 5.2.2-K – 008a Trash Volumes Collected, Transported, Disposed TE 5.2.2-K – 008b Dumpsters and Frequency of Pickup TE 5.2.2-K – 008c Dumpster Pickup Schedule – Three times per Week TE 5.2.2-K – 008d Dumpster Pickup Schedule – Once per Week TE 5.2.2-K – 008e Recycling Dumpster Pickup Schedule – Once per Week TE 5.2.2-K – 008f Refuse Collection – Route Map Romania TE 5.2.2.5-R – 001 Refuse Pickup – Dumpsters Emptied TE 5.2.2.5-R – 002 Refuse Pickup – Dumpsters Emptied – Daily Count (May 2010) TE 5.2.2.5-R – 003 Refuse Pickup – Dumpsters Emptied – Daily Count (June 2010) TE 5.2.2.5-R – 004 Refuse Collection – Location of Dumpsters TE 5.2.2.5-R – 005 Medical Refuse – Monthly Volume TE 5.2.2.5-R – 006 Medical Refuse – Daily Count (May 2010)
  79. Custodial Services Standards: Operating / Personnel / Performance Kosovo Section 5.2.2-K (para. 5.9) Scope of Work Janitorial and Cleaning Services Hours of Operation 7 days per week/11 hours per day Personal Standards US Citizen Requirement None Language Requirement Supervisors and Wk Leaders - level 2 Certifications/Qualifications None Specified Performance Standards Hospital Cleaning AQL – 0.0% Facility Cleaning AQL – 10.0% Toilet Rooms AQL – 4.0% Living Quarters (TOA) AQL – 4.0% Romania Section 5.2.2.6-R Scope of Work Collect, Transport, Dispose of refuse Hours of Operation 5 days per week/9 hours per day Personal Standards US Citizen Requirement None Language Requirement Supervisors and Wk Leaders - level 2 Certifications/Qualifications None Specified Performance Standards Custodial Standards AQL – 4.0% Hours of Operation AQL – 4.0% Scheduled Cleaning AQL – 4.0% Other Cleaning AQL – 10.0% Toilet Rooms AQL – 4.0%
  80. Custodial Services Scheduled Services Kosovo Section 5.2.2-K (para. 5.9) Scheduled Cleaning Services Hospital High Use Low Use Weekly Semiannual As Required Toilet Rooms Daily Services Standards Living Quarters TOAs Transient Quarters Romania Section 5.2.2.6-R Scheduled Cleaning Services Warm Base Other Cleaning Semiannual As Required Cleaning Standards Floors Toilet Rooms Trash Removal
  81. Custodial Services Technical Exhibits/Workload Kosovo TE 5.2.2-K – 009a Active Buildings and Structures Listing Custodial Designation TE 5.2.2-K – 009b Cold Base Buildings and Structures Listing TE 5.2.2-K – 009c Buildings and Structures Listing Scheduled for Deconstruction TE 5.2.2-K – 009d Active Latrine/Toilet Rooms TE 5.2.2-K – 009e Cold Base Latrine/Toilet Rooms TE 5.2.2-K – 009f Toilet Rooms Scheduled for Deconstruction Romania TE 5.2.1-R – 001 BTA Buildings and Structures Listing Activity Level Custodial Designation TE 5.2.1-R – 002 PFOS Buildings and Structures Listing Activity Level Custodial Designation TE 5.2.2.6-R – 001 Base Requirement / Warm Base Cleaning Schedule
  82. Pest Control Services Standards: Operating / Personnel / Performance Kosovo Section 5.2.2-K (para. 5.10) Scope of Work Pest Control and Integrated Pest Management Services Hours of Operation 7 days per week/11 hours per day Personal Standards US Citizen Requirement None Language Requirement All Pest Control Workers – level 3 Certifications/Qualifications All Pest Control Workers Certified/Trained Performance Standards Inspections and Surveys AQL – 10.0% Pest and Vegetation Control AQL – 4.0% Romania Section 5.2.2.7-R Scope of Work Collect, Transport, Dispose of refuse Hours of Operation 5 days per week/9 hours per day Personal Standards US Citizen Requirement None Language Requirement Supervisors and Wk Leaders - level 2 Certifications/Qualifications All Pest Control Workers Certified/Trained Performance Standards Pest Control Standards - AQL – 4.0% Hours of Operation - AQL – 4.0% Roach and Pest Surveillance AQL – 4.0%
  83. Pest Control Services Scheduled Services Kosovo Section 5.2.2-K (para. 5.10) Survey Reports and Service Records Pest Management Report Pest Control Service Record Surveillance Visual Traps Vector Control Vegetation Control Romania Section 5.2.2.6-R Surveillance Systematic Surveillance for Pests Warm Base Cold Base
  84. Pest Control Services Technical Exhibits/Workload Kosovo TE 5.2.2-K – 010a Pesticides – Volumes Used TE 5.2.2-K – 010b Pesticides with Limited Application TE 5.2.2-K – 010c Banned Pesticides Romania TE 5.2.1-R – 001 BTA Buildings and Structures Listing TE 5.2.1-R – 002 PFOS Buildings and Structures Listing TE 5.2.2.7-R – 001 Pesticides with Limited Application TE 5.2.2.7-R – 002 Banned Pesticides
  85. Environmental Services Standards: Operating / Personnel / Performance Kosovo Section 5.2.2-K (para. 5.11) Scope of Work Support Army Environmental Programs Conduct Compliance Inspections and Environmental Baseline Studies, Provide3 Hazardous Waste Management Hours of Operation 7 days per week/11 hours per day HWSA -- 6 days per week/10 hours per day Personal Standards US Citizen Requirement - None Language Requirement Supervisors and Wk Leaders - level 2 Certifications/Qualifications All trained in handling of HAZMAT Performance Standards HWSA Operations and Soil Stockpile AQL – 10.0% HSMS Tracking - AQL – 2.5% Hazardous Waste Accumulation and Transportation - AQL – 4.0% Wash Rack Effluent Water - AQL – 4.0% Romania Limited Hazardous Waste Program included in Refuse Collection and FSP
  86. Environmental Services Scheduled Services Kosovo Section 5.2.2-K (para. 5.11) Hazardous Waste Storage HWSA Operation / Staffing Receive, Segregate, Sort Coordinate Pickup and Disposal Soil Stockpile Hazardous Waste Management Information System Hazardous Waste Accumulation and Transportation HWAPs Medical Containers Batteries Found-on Post Items Water Wash Rack Effluent Containment Water Romania Limited Hazardous Waste Program included in Refuse Collection and FSP
  87. Environmental Services Technical Exhibits/Workload Kosovo TE 5.2.2-K – 011a Waste Drums POL IBC Batteries Medical Bio-Hazardous Waste Spill Response Contaminated Soil Contaminated Stockpile Romania Limited Hazardous Waste Program included in Refuse Collection and FSP
  88. USAREUR Support Contract – IIBase Maintenance & Utility Services Unscheduled Services
  89. Unscheduled Services Base Maintenance and Utility Services Kosovo Section 5.2.3-K Scope of Work DPW Unscheduled Work Service Orders Individual Job Orders Personal Standards US Citizen Requirement None Language Requirement Supervisors and Wk Leaders - level 2 Certifications/Qualifications None Specified Performance Standards Emergency Service Orders AQL – 0.0% Urgent Service Orders AQL – 4.0% Routine Service Orders AQL – 10.0% Individual Job Orders AQL – 4.0% Romania Section 5.2.3-R Scope of Work DPW Unscheduled Work Service Orders Individual Job Orders Personal Standards US Citizen Requirement None Language Requirement Supervisors and Wk Leaders - level 2 Certifications/Qualifications None Specified Performance Standards Emergency Service Orders AQL – 0.0% Urgent Service Orders AQL – 4.0% Routine Service Orders AQL – 10.0% Individual Job Orders AQL – 4.0%
  90. Unscheduled ServicesBase Maintenance and Utility ServicesTechnical Exhibits/Workload Kosovo TE 5.2.3-K – 001 – Service Orders Buildings & Structures Roads & Grounds Electrical Services HVAC Services Water Services Wastewater Services Refuse Collection Custodial Pest Control Environmental Romania TE 5.2.3-R – 001 – Service Orders Buildings & Structures Roads & Grounds Electrical Services HVAC Services Water Services Wastewater Services Refuse Collection Custodial Pest Control
  91. USAREUR Support Contract – IITemporary Construction and Site Restoration Temporary construction services are defined as those necessary and incidental to the support services provided within the scope of this contract and described throughout the PWS Sections in Section C-5 of the USC – II PWS. Both the nature of construction and the intent of the project must be of a temporary nature to fall within the scope of this contract. Further, construction projects that fall within the scope of this contract are limited to contingency operations and military readiness exercises and shall not be used to support sustained operations
  92. Temporary Construction and Site Restoration. Kosovo Section 5.2.4-K Personal Standards To be Specified in NTP Performance Standards Work Standards -- AQL – 4.0% Establish Installations -- AQL – 4.0% Provide Utilities -- AQL – 4.0% Minor Construction -- AQL – 4.0% Dismantling and Site Restoration -- AQL – 4.0% Romania Section 5.2.4-R Personal Standards To be Specified in NTP Performance Standards Work Standards -- AQL – 4.0% Establish Installations -- AQL – 4.0% Provide Utilities -- AQL – 4.0% Minor Construction -- AQL – 4.0% Dismantling and Site Restoration -- AQL – 4.0%
  93. USAREUR Support Contract – II Force Support Services General Operating Provisions / NTP Procedures
  94. General Operating Provisions and NTP Procedures Kosovo Section 5.3.1-K General Operating Provisions Material and Supplies Maintenance and Service Plan NTP Justification Components Process Thresholds Notification of Start Accomplishment Evaluation and Acceptance Changes Input for Final Costs Romania Section 5.3.1-R General Operating Provisions Material and Supplies Maintenance and Service Plan Site Access / Authorization to Perform / Safety /Environmental / Vehicle Operation / Standards of Conduct / ID Badges NTP Justification Components Process Thresholds Notification of Start Accomplishment Evaluation and Acceptance Changes Input for Final Costs Performance Standards Maintenance and Service Plan -- 4% AQL Site Access / Authorization to Perform / Safety /Environmental / Vehicle Operation / Standards of Conduct / ID Badges -- 4% AQL
  95. USAREUR Support Contract – IIForce Support Services Scheduled Services
  96. Area Support Team Standards: Operating / Personnel / Performance Kosovo Section 5.3.2.1-K Scope of Work AST Augmentation Hours of Operation 6 days per week/8 hours per day Personal Standards US Citizen Requirement PAC Supervisor PAC Senior Administrator Badging Supervisor Badging Specialist (2) Language Requirement – All level 2 Certifications/Qualifications - None Specified Performance Standards AST Operating Standards -- AQL – 4.0% Hours of Operation – AQL – 4.0% Staffing – AQL – 2.5% Language -- AQL – 4.0% US Citizen -- AQL – 4.0% Personnel/Admin -- AQL – 4.0% Logistics -- AQL – 4.0% Property Support -- AQL – 4.0% Work Reception Romania No Requirement
  97. Area Support Team Scheduled Services Kosovo Section 5.3.2.1-K Personnel and Administration Logistics Support Operations Transportation / Maintenance Management Supply Support Property Support Romania No Requirement
  98. Area Support Team Technical Exhibits/Workload Kosovo TE 5.3.2.1-K – 001 AST Augmentation Specified FTEs Romania No Requirement
  99. Food Services Standards: Operating / Personnel / Performance Kosovo Section 5.3.2.2-K Scope of Work Provide Food Services Hours of Operation Breakfast – 0700 – 0830, 7 days per wk Lunch – 1130 – 1300, 7 days per wk Dinner – 1730 – 1900, 7 days per wk Personal Standards US Citizen Requirement Food Service Manager Language Requirement AFMIS Operators Positions w/understanding of RCS Certifications/Qualifications FSM & A/FSM experience w/ large food service operation Health and Hygiene Standards Performance Standards 21 Performance Standards 3 Personnel Standards AQLs – 0.0% or 4.0% 18 Food Service Standards AQLs – 0.0% or 4.0% Romania Section 5.3.2.2-R Scope of Work Provide Food Services Hours of Operation 7 days per week -- IAW PWS table Personal Standards US Citizen Requirement Food Service Manager Language Requirement AFMIS Operators Positions w/understanding of RCS Certifications/Qualifications FSM & A/FSM experience w/ large food service operation Health and Hygiene Standards Performance Standards 21 Performance Standards 3 Personnel Standards AQLs – 0.0% or 4.0% 18 Food Service Standards AQLs – 0.0% or 4.0%
  100. Food Services Scheduled Services Kosovo Section 5.3.2.2-K Menu Planning Remote Feeding Receipt and Storage of Subsistence Food Preparation Headcount Food Serving Dining room Service Ice House Operations Facility Maintenance and Sanitation Dining Facility Administration Food Service Equipment and Utensil Cleaning’ Quality Control Meal Service for Remote Site Feeding Romania Section 5.3.2.2-R Food Service Administration Subsistence Sanitation Staffing Equipment and Facilities Contractor Conducted Dining Facility Review
  101. Food Services Technical Exhibits/Workload Kosovo TE 5.3.2.2-K – 001 Menu Standards TE 5.3.2.2-K – 002 Meals Served Romania TE 5.3.2.2-R – 001 Meals Served 2010 TE 5.3.2.2-R – 002 Meals Served (Predicted) TE 5.3.2.2-R – 003 Food Service Publications TE 5.3.2.2-R – 004 Food Service Forms TE 5.3.2.2-R – 005 Food Service Government Furnished Equipment
  102. Housing Management & Services Standards: Operating / Personnel / Performance Kosovo Section 5.3.2.3-K Scope of Work Housing Management and Billeting Operations Hours of Operation 7 days per week/11 hours per day Personal Standards US Citizen Requirement -- None Language Requirement All employees level 2 proficiency Certifications/Qualifications -- None Performance Standards Hours of Operation -- AQL – 4.0% Language -- AQL – 4.0% Housing Management -- AQL – 4.0% Customer Service Desk -- AQL – 4.0% Guest Quarters -- AQL – 4.0% Billeting Support for TOA -- AQL – 4.0% Romania No Requirement
  103. Housing Management & Services Scheduled Services Kosovo Section 5.3.2.3-K Housing Management Services Occupancy and Control Reports Furniture and Equipment Key Control Customer Service Desk Quest Quarters Billeting Support for TOA Romania No Requirement
  104. Housing Management & Services Technical Exhibits/Workload Kosovo TE 5.3.2.3-K – 001 Housing Workload Permanent US Multi-National Transient Reservations Cancelled Visitors Keys Linens Inspection and Inventory TOA Billeting support Transient Multi-National Visitors Romania No Requirement
  105. Laundry Services Standards: Operating / Personnel / Performance Kosovo Section 5.3.2.4-K Scope of Work Laundry Services for Base Camps / FOBs / Remote Locations Hours of Operation Drop Off and Pickup -- 7 days per week/12 hours per day Personal Standards US Citizen Requirement None Language Requirement Supervisors and Customer Service Representatives -- level 2 proficiency Certifications/Qualifications None Specified Performance Standards Laundry Standards -- AQL – 4.0% Hours of Operation -- AQL – 4.0% Language -- AQL – 4.0% Operate and Maintain Laundry Facilities AQL – 4.0% Laundry Drop Off and Pickup AQL – 10.0% Romania Section 5.3.2.4-R Scope of Work PFOS / BTA Hours of Operation Drop Off and Pickup -- 6 days per week/3 hours per day Personal Standards US Citizen Requirement None Language Requirement Supervisors and Customer Service Representatives -- level 2 proficiency Certifications/Qualifications None Specified Performance Standards Laundry Standards -- AQL – 4.0% Hours of Operation -- AQL – 4.0% Language -- AQL – 4.0% Bundled Laundry Service -- AQL – 4.0% Industrial / Organizational Laundry Service AQL – 4.0% Laundry Drop Off and Pickup AQL – 10.0%
  106. Laundry Services Scheduled Services Kosovo Section 5.3.2.4-K Operate and Maintain Laundry Facilities Individual Bundled Laundry Service Industrial/Organizational Laundry Service Exchange and Clean Sleeping Bags Comforters and Wool Blankets OCIE Items Laundry Drop Off and Pickup Points Romania Section 5.3.2.4-R Individual Bundled Laundry Service Other Laundry Vehicle Maintenance Medical Sleeping Bags Comforters/Wool Blankets Laundry Drop Off and Pickup Points
  107. Laundry Services Technical Exhibits/Workload Kosovo TE 5.3.2.4-K – 001 Laundry Volumes and Operating Metrics Bundles Washer Loads DFAC/POL Laundry Medical/MWR/Transient Comforters/Wool Blankets OCIE Items Laundry Equipment Romania TE 5.3.2.4-R – 001 Actual Laundry Workload Individual Bundles Weight Industrial Bundles Weight Comforters/Wool Blankets Units Weight TE 5.3.2.4-R – 002 Laundry Patrons TE 5.3.2.4-R – 003 Laundry Workload by Activity level Warm Base Exercise
  108. MWR Augmentation Standards: Operating / Personnel / Performance Kosovo Section 5.3.2.5-K Scope of Work Staff to MWR Facilities/Programs Hours of Operation 7 days / week/24 hours per day as designated Personal Standards US Citizen Requirement - None Language Requirement All – level 1 Certifications/Qualifications Employees in fitness facility trained in AED,CPR, and basic first aid Performance Standards MWR Standards – AQL – 4.0% Hours of Operation – AQL – 4.0% Language – AQL – 4.0% Certifications and Training – AQL – 4.0% Fitness Facility Operations – AQL – 4.0% Fitness Center Maintenance – AQL – 10.0% Grounds /fields Maintenance – AQL – 10.0% Recreation /Comm/Libraries – AQL – 4.0% Warehouse – AQL – 4.0% Accountability and Inspections MWR Programs – AQL – 4.0% Romania No Requirement
  109. MWR Augmentation Scheduled Services Kosovo Section 5.3.2.5-K Fitness Facility Operations Fitness Center Janitorial Service and Maintenance Grounds and Fields Maintenance Recreation Center/Communication Center / Common Areas / Libraries / TV Rooms / Internet / Telephones Warehouse Accountability and Inspections MWR Programs Romania No Requirement
  110. MWR Augmentation Technical Exhibits/Workload Kosovo TE 5.3.2.5-K – 001 MWR Augmentation Camp Bondsteel Pristina TE 5.3.2.5-K – 002 MWR Users Romania No Requirement
  111. Information Support Services Standards: Operating / Personnel / Performance Kosovo Section 5.3.2.6-K Scope of Work Information Support Services for Task Force/Battle Group Hours of Operation 40 hours per week during core hours Personal Standards US Citizen Requirement US Citizen Language Requirement – NA Clearance - Secret Clearance Performance Standards Information Services Standards – AQL – 2.5% Hours of Operation – AQL – 2.5% US Citizen – AQL – 0.0% Security Clearance – AQL – 0.0% Official Mail Program – AQL – 4.0% Distribution – AQL – 4.0% Records Management Program – AQL – 4.0% Communications – AQL – 4.0% Reproduction – AQL – 4.0% Publications – AQL – 4.0% File Maintenance – AQL – 4.0% Romania No Requirement
  112. Information Support Services Scheduled Services Kosovo Section 5.3.2.6-K Official Mail Program Distribution Records Management Communications Reproduction Publications File Maintenance Ancillary Information Support Services Romania No Requirement
  113. Information Support Services Technical Exhibits/Workload Kosovo TE 5.3.2.6-K – 001 Information Support Services Specified FTEs Romania No Requirement
  114. Fire and Emergency Services Standards: Operating / Personnel / Performance Kosovo Section 5.3.2.7-K Scope of Work Fire and Emergency Services Hours of Operation 7 days per week/24 hours per day Personal Standards US Citizen Requirement None. Certifications are Required Language Requirement Language Requirement All employees – level 2 Certifications/Qualifications All employees have necessary certifications Performance Standards Fire Work Standards – AQL – 0.50 Hours of Operation – AQL – 4.0% Language – AQL – 2.5% Certifications and Training – AQL – 0.0% Fire Prevention (7 standards) – AQL – 4.0% Fire and Emergency Response -- AQL 0.0% Emergency Medical Services – AQL – 0.0% Essential Medical Service – AQL – 4.0% Romania No Requirement
  115. Fire and Emergency Services Scheduled Services Kosovo Section 5.3.2.7-K Fire Prevention Fire Prevention SOPs Fire Prevention Activities Fire Inspections Fire Investigations Contractor Operations and Design Reviews Fire Drills Fire and Emergency Services Training Fire and Emergency Response Alarm Center Dispatch Services Full-time Fire and Emergency Response Medical Services Emergency Medical Services Medical Screening Transportation for Medical Emergencies Romania No Requirement
  116. Fire and Emergency Services Technical Exhibits/Workload Kosovo TE 5.3.2.7-K – 001 Fire and Emergency Services Equipment, Population, and Aircraft Movement Square Feet Population Aircraft Movements Fire Station Tankers Structural Class A Engines ARFF Vehicles Fire Extinguishers Smoke Alarms TE 5.3.2.7-K – 002 Fire and Emergency Services Workload Emergency Responses Exercises Fire Prevention Inspections Fire Prevention Re-Inspections Guidance and Education Romania No Requirement
  117. USAREUR Support Contract – IIForce Support Services Unscheduled Services
  118. Unscheduled Services Force Support Services Kosovo Section 5.3.3-K Scope of Work Force Support Unscheduled Work Personal Standards US Citizen Requirement None Language Requirement Supervisors and Wk Leaders - level 2 Certifications/Qualifications None Specified Performance Standards NTP Accomplishment AQL – TBD NTP Evaluation and Acceptance AQL – TBD NTP Changes AQL – TBD Completed NTPs AQL – TBD Romania Section 5.3.3-R Scope of Work Force Support Unscheduled Work Personal Standards US Citizen Requirement None Language Requirement Supervisors and Wk Leaders - level 2 Certifications/Qualifications None Specified Performance Standards NTP Accomplishment AQL – TBD NTP Evaluation and Acceptance AQL – TBD NTP Changes AQL – TBD Completed NTPs AQL – TBD
  119. USAREUR Support Contract – IILogistics Support Services
  120. USAREUR Support Contract – IILogistics Support Services General Operating Provisions / NTP Procedures
  121. General Operating Provisions and NTP Procedures Kosovo Section 5.4.1-K General Operating Provisions Material and Supplies Maintenance and Service Plan NTP Justification Components Process Thresholds Notification of Start Accomplishment Evaluation and Acceptance Changes Input for Final Costs Romania Section 5.4.1-R General Operating Provisions Material and Supplies Maintenance and Service Plan Site Access / Authorization to Perform / Safety /Environmental / Vehicle Operation / Standards of Conduct / ID Badges NTP Justification Components Process Thresholds Notification of Start Accomplishment Evaluation and Acceptance Changes Input for Final Costs Performance Standards Maintenance and Service Plan -- 4% AQL Site Access / Authorization to Perform / Safety /Environmental / Vehicle Operation / Standards of Conduct / ID Badges -- 4% AQL
  122. USAREUR Support Contract – IILogistics Support Services Scheduled Services
  123. Fuel ServicesStandards: Operating / Personnel / Performance Kosovo Section 5.4.2.1-K Scope of Work Wholesale and Retail Fuel Services Hours of Operation Fuel Services -- 7 days per week/24 hours per day Bulk Fuel Farm -- 7 days per week/12 hours per day Personal Standards US Citizen Requirement Fuels Manager One per Fuels Operating Location Language Requirement Supervisors and Work leaders have level 2 proficiency Certifications/Qualifications Fuel handler Certification Safety Training ADR Driver Certificate Dangerous Goods Advisor Performance Standards 37 Performance Standards AQLs – 0.0% to 2.5% Romania Section 5.4.2.1-R Scope of Work Bulk/Retail Fuel Point Operation Hours of Operation Fuel Operation -- 5 days per week/3 hours per day Personal Standards US Citizen Requirement Fuels Manager Language Requirement None Certifications/Qualifications Fuel manager – 2 yrs experience Performance Standards 22 Performance Standards AQLs – 0.0% to 4.0%
  124. Fuel Services Scheduled Services Kosovo Section 5.4.2.1-K Fuel Service Standards Operating Standards Security Responsibilities Fuels Accountability Fuels Forecasting Fuel Reporting Fuels Audit Trail Fuel Orders Fuel Transport Bulk Fuel Farm Retail Fuel Points Issuing Fuel Fuel Sampling Fuel Testing Laboratory Aircraft Refueling Receiving Fuel Closing Receipt Bulk Fuel Transfers Contaminated Fuel Injector Systems Romania Section 5.4.2.1-R Fuel Service Standards USAREUR Standards Fuel Service Standards Daily Checks Fuels Physical Security Fuels Accountability Inventory Adjustments Fuel Sampling Receiving Fuel Delivery Discrepancies Losses Due to Spillage Fuels Reporting Fuels Audit Trail Fuel Orders Fuel Transport Static and Mobile Fuel Points Issuing Fuel Fuel Testing Laboratory Closing Receipt Reports and CDRL
  125. Fuel Services Technical Exhibits/Workload Kosovo TE 5.4.2.1-K – 001 Fuel Services Amplifying Appendices Custody of Petroleum Product Responsibility for Government Owned Petroleum Products Quality Control Plan Sampling and Testing Quality Representative References TE 5.4.2.1-K – 002 Fuel Volume TE 5.4.2.1-K – 003 Fuel Operations Romania TE 5.4.2.1-R – 001 Fuel Quantity 2010 TE 5.4.2.1-R – 002 Fuel Quantity 2011 (Predicted)
  126. Supply Support Standards: Operating / Personnel / Performance Kosovo Supply Support Activity / Stock Control Section 5.4.2.2-K Scope of Work Operate and Manage SSA and provide Stock Control Services Hours of Operation 7 days per week/12 hours per day Personal Standards US Citizen Requirement SSA Manager Monitor for each of four SSA Sections Language Requirement All employees have level 2 proficiency Certifications/Qualifications None Specified Performance Standards SSA Standards -- AQL – 4.0% Stock Control Standards -- AQL – 4.0% Hours of Operation -- AQL – 4.0% Language -- AQL – 4.0% US Citizen -- AQL – 4.0% SSA Operations -- AQL – 4.0% Stock Control -- AQL – 4.0% Romania Forward Supply Point Section 5.4.2.2-R Scope of Work Provide FSP Services /Augment SRA Officer Hours of Operation 5 days per week/9 hours per day Personal Standards US Citizen Requirement - None Language Requirement - Mgr /SARSS–level 3 Certifications/Qualifications - SARSS Performance Standards USAREUR Standards -- AQL – 4.0% FSP Standards -- AQL – 4.0% Language -- AQL – 0.0% FSP Manager -- AQL – 0.0% SARSS Proficiency -- AQL – 0.0% Hours of Operation -- AQL – 4.0% FSP Operations -- AQL – 4.0% FSP Systems -- AQL – 4.0% SARSS Operation -- AQL – 4.0% FSP Ops, Inventory /Control -- AQL – 4.0% APO and Stock Control -- AQL – 4.0% Command Supply Discipline -- AQL – 4.0% Joint Supply Support -- AQL – 4.0% Hazardous Waste Storage Area -- AQL – 4.0% OCIE -- AQL – 4.0%
  127. Supply Support Scheduled Services Kosovo Supply Support Activity / Stock Control Section 5.4.2.2-K SSA Receiving Storing Issuing Local Purchasing Stock Control SARSS ILAP Customer Support AKO Accounts Romania Forward Supply Point Section 5.4.2.2-R FSP Operations FSP Facility and Systems SARSS-1 FSP Augmentation Stock Record Account Command Supply Discipline Program Joint Supply Support Hazardous Waste Storage Area Operation Tracking Spill Kits OCIE
  128. Supply Support Technical Exhibits/Workload Kosovo Section 5.4.2.2-K Supply Support Activity / Stock Control TE 5.4.2.2-K – 001 SSA Workload Request for Issue / Status of Requests Total Receipt Total MRO ASL Lines Shipment Confirmation Personal Shipment TCMD RF Tag Pallets (Warehouse Ops) Multipacks (Warehouse Ops) MRE Received / MRE Issued Water Received / Issued Customs Forms Admin Adjustment Reports Incoming / Outgoing ALOCs Incoming / Outgoing Containers Incoming / Outgoing Multipacs Extended Hours of Operation Romania Section 5.4.2.2-R Forward Supply Point TE 5.4.2.2-R – 001 Classes of Supply TE 5.4.2.2-K – 002 FSP Workload (2010) Request for Issue / Status of Requests Total Receipt Total MRO ASL Lines Shipment Confirmation Personal Shipment TCMD RF Tag Pallets (Warehouse Ops) Multipacks (Warehouse Ops) MRE Received / MRE Issued Water Received / Issued Customs Forms OCIE Workload DRMO Admin Adjustment Reports Incoming / Outgoing ALOCs, Containers, Multipacs TE 5.4.2.2-K – 003 FSP Workload (2011 Predicted)
  129. OCIE Services Standards: Operating / Personnel / Performance Kosovo Section 5.4.2.3-K Scope of Work Housing Management and Billeting Operations Hours of Operation 6 days per week/12 hours per day Personal Standards US Citizen Requirement None Language Requirement All employees have level 2 proficiency Certifications/Qualifications None Specified Performance Standards OCIE Standards - AQL – 0.0% Hours of Operation - AQL – 4.0% Language - AQL – 4.0% OCIE Facility - AQL – 10.0% OCIE Receive, Store, Issue - AQL – 4.0% OCIE Inventory Balance - AQL – 5.0% OCIE Inventory Ordering and Storage AQL – 10.0% Romania No Separate PWS
  130. OCIE Services Scheduled Services Kosovo Section 5.4.2.3-K OCIE Augmentation CIF ISM Operation Receipt and Stockage Issue and Exchange Accounting and Tracking Romania No Separate PWS
  131. OCIE Services Technical Exhibits/Workload Kosovo TE 5.4.2.3-K – 001 OCIE Workload Turns Customer Issues CIF Lines Inventoried CIF Location survey Turn in to DRMO Turn in /Return to laundry Customer Direct Exchange CIF Lines of Stock Lateral Transfer Romania No Separate PWS
  132. BLAHA Standards: Operating / Personnel / Performance Kosovo Section 5.4.2.4-K Scope of Work Manager, Operate, and QC BLAHA Hours of Operation 7 days per week/12 hours per day Personal Standards US Citizen Requirement Required to Monitor Sensitive items and Ammunition Language Requirement None Certifications/Qualifications Supervisor – Certification per PWS Ammunition Handler – Certification per PWS Performance Standards BLAHA Standards - AQL – 0.0% Hours of Operation - AQL – 4.0% US Citizen - AQL – 0.0% Certifications and Training - AQL – 0.0% BLAHA Ops and Maintenance - AQL – 0.0% BLAHA Inspections, Reporting, Stock Control AQL – 2.5% Romania No Requirement
  133. BLAHA Scheduled Services Kosovo Section 5.4.2.4-K Operation and Maintenance of BLAHA Receipt, Storage, issue Retrograde Ammunition Systems Inspections, Reporting, Stock Control Romania No Requirement
  134. BLAHA Technical Exhibits/Workload Kosovo TE 5.4.2.4-K – 001 BLAHA Workload Rounds Issued – Number / Tons Live Rounds Turned In – Number / Tons Rounds Warehoused – Number / Tons Inspections – Number / Tons Turn Ins Residue -- Number / Pounds Pounds of Brass Screened Storage Shipments -- Number / Tons Receipts -- Number / Tons Empty Containers Certified Romania No Requirement
  135. Property Book Clerk Standards: Operating / Personnel / Performance Kosovo No Requirement Romania Section 5.4.2.2.1-R Scope of Work Augmentation to Stock Record Account Property Officer Hours of Operation 5 days per week/9 hours per day Personal Standards US Citizen Requirement None Language Requirement Employees shall have level 3 proficiency Certifications/Qualifications None specified Performance Standards Language Requirement - AQL – 0.0% Hours of Operation - AQL – 4.0% Property Book Augmentation - AQL – 4.0% Property Book Augmentation – Joint Procedures AQL – 4.0%
  136. Property Book Clerk Scheduled Services Kosovo No Requirement Romania Section 5.4.2.2.1-R Property Book Augmentation Services Receipt of Property and Supply Items Property Book Clerk Staffing and Services Maintain Property Book files Assist in Performing Inventories Prepare Information and Data for Automated Systems Review and Validate Information for Accuracy Assist in Management of Hand Receipts Assist Customers
  137. Property Book Clerk Technical Exhibits/Workload Kosovo No Requirement Romania TE 5.4.2.2.1-R – 001 Property Book Clerk Augmentation – Specified FTE
  138. Material Handling Services Standards: Operating / Personnel / Performance Kosovo Section 5.4.2.5-K Scope of Work Container Handling Storage Area (CHSA) Material Handling Equipment (MHE) Rough Terrain Container Handling (RTCH) Hours of Operation CHSA -- 6 days per week/10 hours per day MHE / RTCH -- 7 days / week/10 hours per day Personal Standards US Citizen Requirement - None Language Requirement – Supv / Wk Leaders -- level 2 Certifications/Qualifications - None Specified Performance Standards Material Handling Standards -- AQL – 4.0% Hours of Operation -- AQL – 4.0% Language -- AQL – 0.0% Inbound Freight -- AQL – 4.0% CHSA Operations -- AQL – 4.0% MHE/RTCH Support -- -- AQL – 4.0% MHE/RTCH Inspections -- AQL – 4.0% Coordination with MCT -- AQL – 4.0% Romania Section 5.4.2.5-R Scope of Work Forklift Operations and Dispatch for MHE Services Hours of Operation 5 days per week/9 hours per day Personal Standards US Citizen Requirement None Language Requirement Dispatcher/Forklift Operator -- level 2 Certifications/Qualifications None Specified Performance Standards USAREUR Standards AQL – 4.0% Hours of Operation AQL – 4.0% Language AQL – 0.0% MHE dispatcher Services -- AQL – 4.0% FSP Forklift Operation -- AQL – 4.0% MCT Augmentation -- AQL – 4.0%
  139. Material Handling Services Scheduled Services Kosovo Section 5.4.2.5-K Inbound Freight CHSA Operations TMRs Retrograde/Shipment Manage Container Yard Movement of Containers/Cargo Expediting PLS Flat Racks MHE and Rough Terrain Container Handling Support Base support Missions Task Force and Regional Missions MHE and Rough Terrain Container Handling Inspections Coordination with MCT Romania Section 5.4.2.5-R Base Level MHE Services Dispatcher / Forklift Operator Services FSP Forklift Operator Services MCT Augmentation Services As Required Services
  140. Material Handling Services Technical Exhibits/Workload Kosovo TE 5.4.2.5-K – 001 Material Handling Workload Lifts Within Camp RTCH Forklift Crane Lifts Outside of Camp RTCH Forklift Crane Unscheduled Work RTCH Forklift Crane Romania TE 5.4.2.5-R – 001 Material Handling Workload Total Lifts (Actual) Total Lifts (Predicted)
  141. Transportation Standards: Operating / Personnel / Performance Kosovo Section 5.4.2.6-K Scope of Work Mail / Task Force Base Camp / Intra-Theater Hours of Operation Maintain Transportation Schedules Personal Standards US Citizen Requirement – One w/ registered mail/ TC-AIMS II Language Requirement – All level 1 Certifications/Qualifications -- HAZMAT Performance Standards Transportation Standards – AQL – 2.5% Hours of Operation – AQL – 2.5% Language – AQL – 4.0% US Citizen/Security – AQL – 0.0% Certifications and Training – AQL – 4.0% Mail Transport – AQL – 4.0% Task Force /Base Camp -- AQL – 10.0% Regional/Theater – AQL – 4.0% Sensitive Items – AQL – 0.0% Regional Staging – AQL – 0.0% Line Haul – AQL – 4.0% Sustainment/Retrograde – AQL – 10.0% Reporting/Administration – AQL – 10.0% Romania No Requirement
  142. Transportation Scheduled Services Kosovo Section 5.4.2.6-K Mail Transportation Special Requirements Intra-Theater Intra Task Force Task Force and Base Camp Transportation Operations Regional/Theater Transportation Operations Staging and Marshalling Line Haul Retrograde Route Reconnaissance Reporting Administration Romania No Requirement
  143. Transportation Technical Exhibits/Workload Kosovo TE 5.4.2.6-K – 001 Transportation Missions Missions within Camp PLS / Cargo / Lowboy / Miles Logged Missions within Task Force PLS / Cargo / Lowboy / Miles Logged Line Haul Missions Flatbed / Lowboy / Miles Logged Falcon Express Mail Missions / mail Transported / Miles Logged Unscheduled Missions PLS / Cargo / Line Haul / Flatbed / Lowboy / Miles Logged TE 5.4.2.6-K – 002 Mail Transportation Kosovo Intra-Theater Mail Schedule Camp Bondsteel / Pristina Mail schedule TE 5.4.2.6-K – 003 Falcon Express Mission - Map Romania No Requirement
  144. Bus and Taxi Service Standards: Operating / Personnel / Performance Kosovo Section 5.4.2.7-K Scope of Work Provide Bus and Taxi Service in and around Base Camp Hours of Operation Bus /Taxi Service -- 7 days per week/24 hours per day Shuttle Bus -- 7 days per week/17 hours per day Personal Standards US Citizen Requirement - None Language Requirement – All – level 1 Certifications and Training Operating Licenses IAW PWS Performance Standards Bus and Taxi Standards – AQL – 4.0% Hours of Operation – AQL – 4.0% Language – AQL – 4.0% Certifications and Training – AQL – 0.0% Scheduled bus and Taxi Service – AQL – 0.0% Maintain Daily Record – AQL – 4.0% Romania No Requirement
  145. Bus and Taxi Service Scheduled Services Kosovo Section 5.4.2.7-K Provide Scheduled Bus and Taxi Service In and around Base Camps Between Base Camps For Flight Line Support For MWR Day Trips Maintain Daily Record Romania No Requirement
  146. Bus and Taxi Service Technical Exhibits/Workload Kosovo TE 5.4.2.7-K – 001 Bus and Taxi Workload and Passenger Volume Shuttle Bus Passengers / Number of Busses Used / Number of Vans Used / Mission Duration Taxi Service Passengers / Number of Vans Used / Mission Duration Missions Outside Camp Bondsteel Passengers /Number of Bus TMRs Used / Number of Van TMRs Used / Miles Logged TE 5.4.2.7-K – 002 Camp Bondsteel Scheduled Bus Service Camp Bondsteel Shuttle Bus A Camp Bondsteel Shuttle Bus B Camp Bondsteel Shuttle Taxi Van Romania No Requirement
  147. Movement Control Team Standards: Operating / Personnel / Performance Kosovo Section 5.4.2.8-K Scope of Work: Command and Control – TC-AIMS II / Transportation Movement / Host Nation Coordination / Customs / Commercial Transportation / Rail Movement / Unit Moves / Conveys / Container Management Hours of Operation – Maintain Schedules Personal Standards US Citizen Requirement TC-AIMS II / GCCS-A Systems Language Requirement – All level 1 Certifications/Qualifications -- TC-AIMS II Performance Standards MCT Standards – AQL – 4.0% Hours of Operation – AQL – 4.0% Language – AQL – 2.5% US Citizen – AQL – 0.0% Command and Control System – AQL – 4.0% Transportation Movements – AQL – 4.0% Host Nation Customs -- AQL 4.0% Commercial Transportation and Rail Movements – AQL – 4.0% Unit Moves – AQL – 4.0% Container Management – AQL -- 4.0% MCT Reports – AQL – 4.0% Romania No Requirement
  148. Movement Control Team Scheduled Services Kosovo Section 5.4.2.8-K Command and Control Systems Transportation Movements Host Nation Coordination Customs Commercial Transportation Rail Movement Unit Moves Convoys Container Management MCT Reports Romania No Requirement
  149. Movement Control Team Technical Exhibits/Workload Kosovo TE 5.4.2.8-K – 001 Movement Control Team Workload Linehaul Missions Coordinated Falcon Express / Mail Missions Coordinated Railhead Missions Coordinated Customs Certificates – Kosovo / Macedonia Customs Certificates Form 302 One-Time-Only Diplomatic Clearances March Credits Transportation Movement Requests Export Traffic Release Request Romania No Requirement
  150. Equipment Maintenance Standards: Operating / Personnel / Performance Kosovo -- Section 5.4.2.9-K Scope of Work Military Equipment / Non-Tactical Equipment / TMP / Contact/Recovery/ Wash Rack Hours of Operation Scheduled -- 6 days per week/10 hours a day Personal Standards US Citizen Requirement – (7) – IAW TE Language – Supv. /Wk Leaders -- level 2 Certifications/Qualifications -- None Specified Performance Standards Equipment Maint. Standards -- AQL – 0.0% Hours of Operation -- AQL – 4.0% Language -- AQL –4.0% US Citizen – AQL – 4.0% CAP /GFE/ field Level Maint -- AQL – 0.0% Tactical Vehicle Maint. -- AQL – 4.0% Technical Inspection -- AQL – 4.0% Maintenance & Repair -- AQL – 0.0% Quality Control -- AQL – 4.0% Damages Beyond FW&T -- AQL – 4.0% Tires / Battery -- AQL – 4.0% Planning and Control-- AQL – 4.0% Unserviceable Parts -- AQL – 4.0% AMSS, Records, Reports, -- AQL – 4.0% Unit PLL -- AQL – 4.0% AOAP -- AQL – 4.0% TMDE -- AQL – 4.0% Wash Racks -- AQL – 4.0% Tactical Bridging -- AQL – 4.0% Combined Maint. -- AQL – 4.0% Romania -- Section 5.4.2.9-R Scope of Work Military Equipment / Non-Tactical Equipment / Contact and Recovery Services Hours of Operation Scheduled -- 5 days per week/9 hours a day Personal Standards US Citizen Requirement – Manager. Language Requirement – Supv. / Wk Leaders -- level 2 Certifications/Training – Training IAW AR 600-55 Performance Standards Equipment Maint. Standards -- AQL – 2.5% Hours of Operation -- AQL – 4.0% Language -- AQL –4.0% US Citizen – AQL – 4.0% GFE -- AQL – 0.0% Field Level Maint. -- AQL – 0.0% Tactical Vehicle Maint. -- AQL – 4.0% Non-Tactical Services -- AQL – 4.0% Dispatch of Equipment -- AQL – 4.0% Control of Equipment -- AQL – 0.0% Technical Inspections -- AQL – 4.0% Maintenance and Repair -- AQL – 4.0% Quality Control -- AQL – 4.0% Damages Beyond Fair Wear & Tear -- AQL – 4.0% Tires /batteries -- AQL – 4.0% Maintenance Planning and Control-- AQL – 4.0% Unserviceable Parts -- AQL – 4.0% AMSS. Records. Reports-- AQL – 4.0% Unit PLL -- AQL – 4.0%
  151. Equipment Maintenance Scheduled Services Kosovo Section 5.4.2.9-K Equipment Maintenance CAP / Government Furnished Equipment Gov’t Equip. -- Field Level Maintenance Ops. Tactical Vehicle Motor Pools Dispatch and Control Technical Inspections Maintenance and Repair Quality Control Damages Beyond Fair Wear and Tear Tires Battery Exchange Maintenance Planning and Control Unserviceable Parts / ORILS AMSS Maintenance Records Discrepancy Reports Unit Level Prescribed Load List Army Oil Analysis Program TMDE Wash Rack Flat Racks and Pallets Combined Maintenance Shop Operations Romania Section 5.4.2.9-R Equipment Maintenance Government Furnished Equipment Field Level Maintenance Operations Tactical Vehicle Services Non-Tactical Vehicle Services Dispatch of Equipment Control of Equipment Technical Inspections Maintenance and Repair Quality Control Damages Beyond Fair Wear and Tear Tires Battery Exchange Maintenance Planning and Control Unserviceable Parts / ORILS AMSS Maintenance Records Discrepancy Reports Unit Level Prescribed Load List
  152. Equipment Maintenance Technical Exhibits/Workload Kosovo TE 5.4.2.9-K – 001 Sensitive Items TE 5.4.2.9-K – 002 Tactical Organizational Equipment TE 5.4.2.9-K – 003 Government Furnished Equipment TE 5.4.2.9-K – 004 Contractor Non-Tactical Equipment TE 5.4.2.9-K – 005 AAFES Equipment TE 5.4.2.9-K – 006 Food Service Equipment TE 5.4.2.9-K – 007 Laundry Equipment TE 5.4.2.9-K – 008 Generators TE 5.4.2.9-K – 009 Light Sets TE 5.4.2.9-K – 010 Aircraft Ground Equipment TE 5.4.2.9-K – 011 Facilities TE 5.4.2.9-K – 012 Positions Requiring US Citizens / Hours of Operation TE 5.4.2.9-K – 013 Equipment Maintenance Workload Romania TE 5.4.2.9-R – 001 Equipment Maintenance Services by Type Equipment
  153. Wash Rack Services Standards: Operating / Personnel / Performance Kosovo Included in Equipment Maintenance Romania Section 5.4.2.9.1-R Scope of Work Operate and Maintain Wash Rack Hours of Operation Base Requirement -- 5 days / week/2 hours per day Exercise -- -- 5 days / week/9 hours per day Personal Standards US Citizen Requirement - None Language Requirement Contractor POC level 2 proficiency Certifications/Qualifications Employees trained in wash rack ops Performance Standards USAREUR Standards - AQL – 4.0% Wash Rack Standards - AQL – 4.0% Language Requirement -AQL – 0.0% Training - AQL – 0.0% Hours of Operation - AQL – 10.0% Wash Rack Operations - AQL – 4.0% Wash Rack Maintenance - AQL – 4.0%
  154. Wash Rack Services Scheduled Services Kosovo Included in Equipment Maintenance Romania Section 5.4.2.9.1-R Wash Rack Operations Wash Rack Systems Vehicle Washing Staff and Oversee Wash Rack Site Monitor Operators Washing Vehicles Explain Procedures and Safety Wash Rack Maintenance Ensure Equipment is Maintained Complete Required Maintenance
  155. Wash Rack Services Technical Exhibits/Workload Kosovo Included in Equipment Maintenance Romania TE 5.4.2.9.1-R – 001 Wash Rack Workload – 2010 TE 5.4.2.9.1-R – 002 Wash Rack Workload – 2011 (Predicted)
  156. NTV Transportation Motor PoolStandards: Operating / Personnel / Performance Kosovo Section 5.4.2.10-K Scope of Work Provide NTV Transportation Motor Pool Services in support of Task Forces, Battle Groups, Logistics Support Units, and other Organizations Hours of Operation 7 days per week/12 hours a day Personal Standards US Citizen Requirement - None Language - Supv. and Wk Leaders -- level 2 Certifications/Qualifications - None Specified Performance Standards NTV TMP Standards - AQL – 0.0% Hours of Operation - AQL – 4.0% Language - AQL –4.0% NTV TMP Operations - AQL – 0.0% Weekly Dispatch of Equipment - AQL – 4.0% Dispatch and Control - AQL – 4.0% Accident/Incident Reporting - AQL – 0.0% Romania Section 5.4.2.10-R Scope of Work Provide NTV TMP Services in support of Task Forces, Battle Groups, Logistics Support Units, and other Organizations Hours of Operation 5 days per week/9 hours a day Dispatch -- -- 7 days / week/24 hours a day Personal Standards US Citizen Requirement - None Language - POC and Dispatchers -- level 2 Certifications/Qualifications - Valid op license Performance Standards USAREUR Standards -- AQL – 4.0% Language -- AQL –0.0% Training and Certifications -- AQL –0.0% Hours of Operation -- AQL – 4.0% NTV TMP Operations -- AQL – 4.0% Support Vehicles -- AQL – 4.0% Licensing and Registration -- -- AQL – 4.0% Maintenance -- AQL – 4.0% Dispatch -- AQL – 4.0% Ground Transportation -- -- AQL – 4.0% Vehicle Recovery -- AQL – 4.0% Transportation Reception -- AQL – 4.0% Accident/Incident Reporting -- AQL – 0.0% Damage to Vehicles -- AQL – 4.0%
  157. NTV Transportation Motor Pool Scheduled Services Kosovo Section 5.4.2.10-K NTV Transportation Motor Pool Operations Provide Vehicle and Driver Support Accommodate Late Arrival Early Release Holiday Schedules Training Days Exercises Weekly dispatch of Equipment Dispatch and Control Dispatch Vehicles with Logbooks Maintain Logbooks Dispatch commercial Vehicle When Required Accident/Incident Reporting Complete and submit SF 91 Notify ACO Initiate Report of Survey Romania Section 5.4.2.10-R NTV Transportation Motor Pool Operations Provide Vehicle and Driver Support Provide Support Vehicles Licensing and Registration Maintenance Dispatch Dispatch Vehicles with Logbooks Maintain Logbooks Dispatch commercial Vehicle When Required Ground Transportation Vehicle Recovery Service Transportation Reception Accident/Incident Reporting Damage to Vehicles by Government Personnel
  158. NTV Transportation Motor Pool Technical Exhibits/Workload Kosovo TE 5.4.2.10-K – 001 NTV TMP Equipment Equipment Type Density Required dispatch Services Required TE 5.4.2.10-R – 002 NTV Priority 1 (90% FMC) License / Make / Model / Description / Year / Unit / Maintenance Priority TE 5.4.2.10-R – 003 NTV Priority 2 (75% FMC) License / Make / Model / Description / Year / Unit / Maintenance Priority TE 5.4.2.10-R – 004 NTV Priority 3 (75% FMC) License / Make / Model / Description / Year / Unit / Maintenance Priority Romania TE 5.4.2.10-R – 001 TF-E Fleet Requirements Type Vehicle Quantity Scheduled Service Level TE 5.4.2.10-R – 002 NTV TMP Workload CAGO Repair & Services TMP Service (Dispatch) Vehicle Recovery Missions
  159. Airfield and Air Terminal Services Standards: Operating / Personnel / Performance Kosovo Section 5.4.2.11-K Scope of Work Air Terminal Operations, Flight Line Operations and Maintenance, Ramp Control, Transient Alert Services, Air Traffic Control, Movement Control, ATCALS Services, Cargo Services, Passenger Services Hours of Operation Camp Bondsteel ATC -- 7 days per week/24 hours per day All Other Airfield Activities -- 7 days per week/12 hours per day Personal Standards US Citizen Requirement GCCS Operation – US w/Security Clearance Air Traffic Controllers Supervisors ATOC / Air Field Management / Flight Ops Language Requirement – Supervisors and Work Leaders – level 2 Certifications and Training As Required by Position Kosovo Section 5.4.2.11-K Performance Standards Airfield Standards ATOC – AQL – 0.0% Flight Line / Airfield Mgt – AQL – 0.0% Ramp Control – AQL – 0.0% ATCALS – AQL – 0.0% Air Traffic Control – AQL – 0.0% Cargo Standards -- AQL – 4.0% Passenger Standards ATOC – AQL – 10.0% Hours of Operation – AQL – 4.0% Language – AQL – 4.0% US Citizen – AQL – 0.0% Operate ATOC – AQL – 4.0% Airfield Management – AQL – 4.0% Flight Line Ops /Maintenance – AQL – 2.5% Equipment Support for Air Ops – AQL – 4.0% Ramp Control – AQL – 4.0% Transient Alert Services – AQL – 4.0% Port Movement Control Team – AQL – 0.0% Air Traffic Control – AQL – 0.0% Cargo Services – AQL – 4.0% Passenger Services – AQL – 10.0%
  160. Airfield and Air Terminal Services Scheduled Services Kosovo Section 5.4.2.11-K Operate Air Terminal Operations Center Information Control Safety Records and Reports / Publications Respond to ATOC Airfield Management / Flight Planning Flight Line Operations and Maintenance Airfield Advisories and QRC Inspection and Maintenance of Paved Services FOD / Bird Aircraft Strike Hazard Program Flight Line Drivers Equipment Support for Air Operations Aerospace Ground Equipment Maintenance Airfield Lighting system IT support for Flight Systems Airfield Operations Airfield Barrier Arresting Kit Ramp Control Transient Alert Services Parking / Ground Equipment / Refueling Kosovo Section 5.4.2.11-K Port Movement Control Team Services Air Traffic Control Control Tower Operations Training for Host Nation / EU Controllers Cargo Services Receiving and Preparing Cargo GATES Processing Unit Moves Cargo Planning Inspection and Storage / Pallets Cargo Terminating Over and Short Shipment Reports Customer Service Hazardous Material/Dangerous Cargo Refrigeration Customs Passenger Services Departing Passengers / Arriving Passengers Troop Deployments Badge Process
  161. Airfield and Air Terminal Services Technical Exhibits/Workload Kosovo TE 5.4.2.11-K – 001 Airfield and Air Terminal Operations Airfield Activity / Function Contractor Operated Days of Operation Hours of Operation TE 5.4.2.11-K – 002 Airfield and Air Terminal Workload Camp Bondsteel Heliport Air Traffic Control Take Offs and Landings Air Traffic Control Transient Count Slatina Airfield Passengers Aircraft Missions Cargo (Registered Mail) Aircraft Deicing Fluid Aircraft Aviation Fuel Romania No Requirement
  162. USAREUR Support Contract – IILogistics Support Services Unscheduled Services
  163. Unscheduled Services Logistics Support Services Kosovo Section 5.4.3-K Scope of Work Force Support Unscheduled Work Personal Standards US Citizen Requirement None Language Requirement Supervisors and Wk Leaders - level 2 Certifications/Qualifications None Specified Performance Standards NTP Accomplishment AQL – TBD NTP Evaluation and Acceptance AQL – TBD NTP Changes AQL – TBD Completed NTPs AQL – TBD Romania Section 5.4.3-R Scope of Work Force Support Unscheduled Work Personal Standards US Citizen Requirement None Language Requirement Supervisors and Wk Leaders - level 2 Certifications/Qualifications None Specified Performance Standards NTP Accomplishment AQL – TBD NTP Evaluation and Acceptance AQL – TBD NTP Changes AQL – TBD Completed NTPs AQL – TBD
  164. Port Support Activity Standards: Operating / Personnel / Performance Kosovo Section 5.4.4-K Scope of Work Operate and Maintain a Port Support Activity Hours of Operation Activated -- 7 days per week/24 hours per day Core Hours 14 hours Personal Standards US Citizen Requirement - None Language - Supv and Wk Leaders - level 2 Certifications/Qualifications - None Specified Performance Standards PSA Standards -- AQL – 4.0% Hours of Operation -- AQL – 4.0% Language -- AQL – 4.0% Facility Maint. /Utility Services -- AQL – 4.0% Facility Services -- AQL – 4.0% Force Support Services -- AQL – 4.0% Logistics Support Services -- AQL – 4.0% Temporary Installation /Construction -- AQL – 4.0% Equipment Removal – AQL – 4.0%
  165. Port Support Activity Unscheduled Services Kosovo Section 5.4.4-K Facility Maintenance and Utility Services Maintenance and Repair Port Signs Utilities Electrical Services Facility Services Hazardous Materials Fumigation Services Force Support Services Billeting Services Laundry Services Food Services Fire and Emergency Services Kosovo Section 5.4.4-K Logistics Support Services Fueling and Defueling Services Supply services Maintenance/Vehicle Recovery Services Wash Rack Services Aviation/Airfield Support Temporary Installation and Construction Watch Towers Sandbags Concertina Wire Obstacles Dog Kennels Equipment Removal
  166. Port Support Activity Technical Exhibits/Workload Kosovo TE 5.4.4-K – 001 PSA Location, Population, Duration PSA Location Population Supported Duration Start Date End Date TE 5.4.4-K – 002 PSA Requirements and Metrics PSA Function Requirement Unit Estimated Quantity Description
More Related