Task M2 – Working group Auriga-LNL

Task M2 – Working group Auriga-LNL. Sub-task: Construction of optical transducer. Present state. Cryogenic Test facility. Operation temperature 0.02-300K Mechanical Attenuation >180dB in the frequency range 200-1600 Hz. Optical readout (now available). Task M2 – Working group Auriga-LNL.

mindy
Télécharger la présentation

Task M2 – Working group Auriga-LNL

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Task M2 – Working group Auriga-LNL Sub-task: Construction of optical transducer Present state • Cryogenic Test facility • Operation temperature 0.02-300K • Mechanical Attenuation >180dB in the frequency range 200-1600 Hz • Optical readout (now available)

  2. Task M2 – Working group Auriga-LNL Mode #1: 908 Hz Mode #2: 1479 Hz Read-out scheme Q-Measurements results at 4.2K • Mode#1 Q=106 • Mode#2 Q=5.3 x 106

  3. Task M2 – Working group Auriga-LNL First 18 months (starting now) • Room temperature optical bench Snn<10-5 Hz2/Hz @1kHz • Motorized optics mounts for cryogenic alignment • Operation at cryogenic temperature Four years • Improvement of the mirrors properties: Finesse >105, Al2O3 mirrors • Achievement of goal sensitivity to gw (Shh ~10-22 Hz-1/2 )

  4. Task M2 – Working group Auriga-LNL Sub-task: • k, Q measurements at low T • Construction of resonators of CuAl, SiC Be.. Present state • Cryogenic test facility • Optical readout for cryogenic Q-measurements First 18 months (starting now) • Design and construction of the resonators in the kHz region • Modification of the cryogenic suspensions to preserve Q • Measurements of Q and k at low T Last time (months 19-24) Conclude low temperature measurements

  5. Task M2 – Working group Auriga-LNL Sub-task: Improving fabrication process Present state Cryogenic test facility and optical readout for the Q-measurements First 18 months (staring month 12) • Assembling transducer and resonators using different joining procedures as silicate bonding • Q-measurement after bonding (kHz region) beginning Last years (months 13-36) • Low temperature Q and k-measurement after bonding • Comparison of the results with the single piece machined resonators

  6. Task M2 – Working group Auriga-LNL Other collaborations with the working groups of the task • IFN->Limiting bias electric field in the capacitive transducer and effect of dieletric coating on the thermal noise. • ROG,Leiden->Capacitive transducer. • All->writing up the final report.

More Related