This document outlines the effective management of average load for motors using soft start technology over a 30-minute interval. It discusses the importance of average load calculations, highlighting the significance of a 500 kWh demand at 1,000 kW and synchronizing with municipal meter pulses. The ideal target for demand control is set at 500 kVAh over 30 minutes, facilitating optimum performance and energy efficiency. This approach not only ensures reduced starting currents but also enhances overall system stability.
E N D
30 Minute average load Average 30 Minutes
Motor Starting Soft start 30 min Average
500 kWh / ½ h = 1 000 kW – Average load 500 kVAh / ½ h = 1 000 kVA
Block Interval Demand Control Synchronising pulses from Municipal meter Target demand kVAh Shed point Ideal 30 Minutes