1 / 31

T1R Industry Insight Internet Data Center Selection and Supply

T1R Industry Insight Internet Data Center Selection and Supply. Daniel Golding. Vice President and Research Director. Overview. Tier 1 Research specializes in hosting, Internet infrastructure, Software as a Service (Saas), IT Services, content delivery networks

monet
Télécharger la présentation

T1R Industry Insight Internet Data Center Selection and Supply

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. T1R Industry InsightInternet Data Center Selection and Supply Daniel Golding Vice President and Research Director

  2. Overview • Tier 1 Research specializes in hosting, Internet infrastructure, Software as a Service (Saas), IT Services, content delivery networks • Daniel Golding, Vice President and Research Director • 10 Years of experience at major Carriers and ISPs • Global Peering Manager for AOL during major expansion • Currently Chairman of Global Peering Forum • Expert in colocation, data centers, Internet infrastructure, content delivery

  3. What is Colocation • What is colocation? • Outsourced data center • Space, power, possibly managed services • Not conventional IT outsourcing • Not running your data center - its their own facility • Two flavors • Carrier - RBOCs and PTTs • Carrier Neutral

  4. What is colocation Carrier Carrier Neutral

  5. What is Colocation • Carrier vendors provide traditional managed hosting - • Server management • Database • Storage • Carrier neutral vendors may provide: • Traditional managed services • Internet interconnection services

  6. What is not Colocation • Shared hosting and dedicated hosting • “Private Rack” -style dedicated hosting • IT outsourcing • How to tell? • Physical access to equipment • Who owns equipment…usually • Ability to put in whatever hardware is desired

  7. Colocation Pricing • Space (square foot or cabinet) • $600 to $1600 per cabinet • $25 to $60 per square foot • These are all monthly prices - not annual • Prices vary based on market, quality, carrier neutrality • Supply/Demand drivers in charge, not cost of goods

  8. Colocation Pricing • Power • Frequently sold on a per amp basis - 20 or 30 amp circuits • Metering getting more common • True utilization of power is tough to gage without a meter • Managed Services • Remote hands • Managed network, security, database, OS

  9. Colocation Quality • Significant quality differences in colocation facilities • Premium Colocation facilities • Power at least N+1 in all components • UPS, Generator sets, transformers • N+1 Cooling • Multiple fiber entrance facilities • Modern fire suppression and detection • 24x7 staffing and security • Tier III/IV, roughly

  10. Colocation Quality • Significant quality differences in colocation facilities • Standard Colocation facilities • Less than Premium • Generally less power redundancy • Older facilities • Generally Tier II • If there are not n+1 generators, its not premium

  11. How to pick a colocation facility • Selecting a colo facility is entirely requirement-driven • What are your requirements? • Profiles • Enterprise • Carrier • Content Provider/CDN • Software as a Service

  12. How to pick a colocation facility • Enterprises want: • High level of reliability • Cost is less important • High touch customer support • Longer leases/contracts • More managed services • Carrier choices (but not peering) • Enterprise profile: F500/G2000 through SMB

  13. How to pick a colocation facility • Service providers and CDNs want: • Reliability less important • Cost more important - very price sensitive • Shorter leases - 1 year • No managed services, prefer automated customer service systems • Need space available! • High power density (CDN) • Profile: AT&T, Verizon, Akamai, BT

  14. How to pick a colocation facility • Software as a Service Providers want: • Carrier choice - more is better • Managed services - SaaS specific • Developer playgrounds • Marketing assistance • Merchant banking • Enterprise-style customer service • Many SaaS providers would be better off with a full managed hosting solution

  15. A Trip in the WayBack Machine • 1999: Boomtime, selling pet food on the Internet: Build data centers • 2001: Bottom drops out: New data centers are empty • 2003: Recovery starts, data centers acquired for pennies on the dollar • 2005: Data centers start to fill up, but no new cash for sector

  16. Colocation Status, Summer 2007 • Market for colocation space is tightly constrained • Primary constrains are power and cooling, not floor plate • Most highly utilized colocation facilities: • Premium Quality • Carrier Neutral • Top Markets

  17. Colocation Growth Drivers • Carriers and content providers • Internet is growing - 75% to 100% a year • Driven by video and media • Move to VoIP • Enterprises and integrators • SOX, Disaster Recovery, Business Continuity • Obsolescence of enterprise data centers • High cost of construction

  18. Supply/Demand

  19. Colocation Status, Summer 2007 • Supply is up, but demand is up faster • In North America, demand up 14.7%, supply up 6.5% • Utilization numbers seem low, but are deceptive • Packing issues • Power/cooling issues • Installation issues • Will never reach 100%

  20. Colocation Status, Summer 2007 Top Global Colocation Markets

  21. Supply/Demand

  22. Supply/Demand

  23. Why is there a shortage? • If there’s such a demand, why isn’t supply following? • It will eventually • Its too early - capital not willing enough • What’s hold the money back? • Memories of the bust • Concerns about an overbuild - condos • Cost of construction - $1200 - $1300 sq ft

  24. Why is there a shortage? • Why are they so expensive to build? • Not just a shell ($50/sq ft) • Generators, UPS, HVAC • Expensive and a long wait • The right location is important • Cost of land, power • Availability of optical fiber • Server-Hugging behaviors influence location

  25. But I heard there was a glut! • During June 2007, rumors of a “data center glut” started • T1R believes these were started by a Wall Street research analyst • Either foolish or uninformed • There is not glut because a massive data center construction boom never started • There may be a glut one day - but not yet

  26. Colocation Futures • What are the trends for new colocation construction? • Higher quality - most new starts are premium - Tier III-ish • Higher power density - 120 to 250w/sq ft • Larger - most new sites are ~100k sq ft + • Some are “shells” with multiple phases • Carrier neutrality is prized • These trends are set for 3-5 years

  27. Major New Facilities Equinix

  28. Major New Facilities 365 Main

  29. Major New Facilities Savvis

  30. More New Facilities • London: Interxion and IXEurope • Paris: IXEurope • Atlanta: Quality Technology • Phoenix: I/O Data Centers • New facilities on the way, but too few • We haven’t seen the end of explosive demand growth

  31. Conclusion • Thanks! Any Questions? • Daniel Golding Dgolding@t1r.com

More Related