1 / 25

Fission Studies at LAND-R3B The SOFIA project Studies On FIssion with Aladin

Fission Studies at LAND-R3B The SOFIA project Studies On FIssion with Aladin CEA Bruyeres, CEA Saclay, IPN Orsay, GANIL, CENBG, Univ. Santiago de Compostela, Univ Vigo, GSI, possibly TU Darmstadt. What is SOFIA. -Revival of the S104 proposal - Experience approved but never realised

mya
Télécharger la présentation

Fission Studies at LAND-R3B The SOFIA project Studies On FIssion with Aladin

An Image/Link below is provided (as is) to download presentation Download Policy: Content on the Website is provided to you AS IS for your information and personal use and may not be sold / licensed / shared on other websites without getting consent from its author. Content is provided to you AS IS for your information and personal use only. Download presentation by click this link. While downloading, if for some reason you are not able to download a presentation, the publisher may have deleted the file from their server. During download, if you can't get a presentation, the file might be deleted by the publisher.

E N D

Presentation Transcript


  1. Fission Studies at LAND-R3B The SOFIA projectStudies On FIssion with Aladin CEA Bruyeres, CEA Saclay, IPN Orsay, GANIL, CENBG, Univ. Santiago de Compostela, Univ Vigo, GSI, possibly TU Darmstadt

  2. What is SOFIA • -Revival of the S104 proposal • - Experience approved but never realised • - some remaining beam-time • - Measure the fission yield in electromagnetic induced fission of secondary beams

  3. GSI : overview Uranum-238

  4. 10 15 20 25 30 5 E* (MeV) Electromagnetic excitation in Pb • multipolar giant resonances are excited • Large excitation spectrum • most probable energy : 11 MeV= Bf + 5MeV Bf

  5. Exp KH Schmidt at al. 1996 Actinide

  6. SOFIA • Evolution of the ’96 experiment • Now :much more favorable conditions: • much stronger uranium beam (x100), • beam-line from FRS to Cave C, • technical improvements time-of-flight detectors, electronics, • Stronger team, • We can do something better : • - again the nuclear charges Z1,2 (both FF), • - The masses of both FF (A1,2) • - Their kinetic energy (improved resolution) • - Reduced systematic and statistical uncertainty

  7. 2ndary beam identification • Degrader at S1 or S2 • ToF-Brho from S2 to cave C target • Tracking + MUSIC before cave C target

  8. Fission Fragment identification: what we need • Typical identication method : • BRho, ToF, E • For BRho, Large acceptance magnet + tracking • - close to 100% efficiency for both FF • For ToF : high resolution timing detectors • For E : double-sided ionization chamber

  9. The SOFIA set up Neutrons wall 80 cm 1.7 m Tracking1 + Start ToF ALADIN 2nd beam TWIN Music Active target: 5x150mg/cm2Pb Tracking 2 Tracking 3 1.5 m Start ToF 7m Stop ToF Stop

  10. The main difficulty : get the mass • ALADIN is weak : low angular deflection • Difficult to get the proper Brho resolution (1/500) • The angular straggling induced uncertainty • - Reduce the amount of material in beam • - Only gazeous detector (low Z gaz) • - flight-path in Helium

  11. Mass resolution, constraints • To get the Brho resolution : proper position resol. • - 200 micrometers FWHM on the 3 tracking det. • To get the mass reso : proper ToF reso • - 40 ps FWHM on 7m flightpath • Too thick detectors spoil the mass reso due to angular straggling : 60 cm P10 is too thick !

  12. The tracking detectors • MWPC chosen • Vertical wires • Horizontal pads • Similar to ALICE MWPC • Design and construction at IPN Orsay • Expected resolution : 200 m and 1.6 mm • Very thin detector : ~50 m of Al

  13. ToF wall design • See talk yesterday • Vertical UFast plastic stripes, 30 mm wide, • 25 stripes (600 mm long, 4mm thick) for stop detector • Vertical position from the timing in a stripe • Expect. Y-resol. : 2mm FWHM • Flight Path : 7 m • Expect. ToF resol : 40 ps FWHM • Expect. Ekin resol : 1.3% FWHM

  14. Twin-MUSIC • Central cathode Twin-chamber • hole all along central traj. (2 cm diameter) • 20 x 20 x 60 cm3 • Horizontal pos. from drift time • Expect. Résol : 0.2-0.5 mm • 1 bar operation • Neon based gas to be tested ½ chamber Sec. beam Anode plane Frish grid

  15. Current development work • - MUSIC: Under development at GSI • -ToF wall : under (advanced) development at Bruyeres le Chatel • 2 Tracking det’ : under development at IPN • Prototype ready to be tested • Expecting some parasitic beam-time at GSI for testing purposes (all 3 det’)

  16. Some details • Strong sec. beam intensity : 103-5 /s • FF rate :20-2000 /s !! • Trigger on FF only (ToF wall) • Thin secondary target : 0.7 g/cm2 Pb total • Reduced straggling • limited double reaction rate : 3% (was 20 %) • Beam-time needed : 1 day for measuring 1 actinide with very good accuracy

  17. Conclusion • All development work under progress • Feasibility of the tof wall validated • All detectors to be tested beginning of 2011 • Acquisition to be validated in 2011 • Ready to run end of 2011

  18. Cost estimate • TWIN-MUSIC • Realised at GSI estimated cost 50 k€ • Diamond • Collaboration TU Munich, electronics 10 k€ • Tracking (2) MW • Collaboration IPN Orsay, cost 80 k€,

  19. Cost estimate (2) • ToF wall (CEA Bruyeres) • cost 140 k€, ANR (young scientist) funding request • Active target • Estimated cost 15k€ • chamber, gaz : 15 k€ • Various electronics: 20 k€ (maybe underestimated) • Overall cost : about 330 k€

  20. Some more details • No interaction of the sec. beams with detec. • No unneeded load of the detect. (TWIN-MUSIC) • Scint. and Twin designed to avoid the beam • Slits : secondary beam occupancy : • -1 < x < +1 cm • -1 < y < +1 cm

  21. The detector option 1 Neutrons wall 80 cm He, 1.7 m Stripped diamond ALADIN, He 2nd beam TWIN Music, Ne Active target: 5x150mg/cm2Pb MW MW He, 1.5 m Start ToF 7m Scintillator wall Stop

  22. Option 1 difficulty • The uncertainty : the diamond detector • - stripped diamond: 2.5x2.5cm2, 200 m strip • - Start ToF • Similar detector exists • - but prototype (Münich) • - Electronics issues… to be developed • Significant source of anxiety (short term project) !

  23. Seeking for option 2 • What we are willing to do : remove the Diamond • - Need of diamond : 1st tracking • - If no need of trackin’, a plastic can be used • How to get a another tracking det’ without an additional det’ ?

  24. The detector option 2 Neutrons wall 80 cm He, 1.7 m scintillator ALADIN, He 2nd beam TWIN Music, Ne TRACKING Active target: 5x150mg/cm2Pb MW MW He, 1.5 m Start ToF 7m Scintillator wall Stop

  25. Option 2 difficulty • Get the proper tracking resolution from MUSIC • A factor of 2-3 better that usual MUSIC drift resolution • Our ideas : • Multiple measure of position : about 20 anodes • Linear fit of the 30 measurements (angle) • Improved electronics